無料提供中のC_TS422_2021試験問題集で(2024年最新のPDF問題集)信頼度の高いテストエンジン [Q26-Q44]

Share

無料提供中のC_TS422_2021試験問題集で(2024年最新のPDF問題集)信頼度の高いテストエンジン

C_TS422_2021のPDFで最近更新された問題です集試験点数を伸ばそう


SAP C-TS422-2021認定は、世界的に認められており、SAP S/4HANA生産計画と製造に従事するプロフェッショナルの履歴書にとって貴重な追加となります。この認定は、個人のキャリアを進め、収益力を高めることができます。また、継続的な学習とプロフェッショナルな成長への取り組みを示すものでもあります。

 

質問 # 26
When can the automatic material availability check occur in a production order?

  • A. At order confirmation
  • B. At order creation
  • C. At order release
  • D. At order settlement

正解:B、C


質問 # 27
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.

  • A. Fixed pegging
  • B. Finiteness level
  • C. Direction
  • D. Planning mode
  • E. Scheduling control

正解:C、D、E


質問 # 28
What is the purpose of collective orders?

  • A. To post any component withdrawal as single backflush with order confiramtion
  • B. To combine order management of co-products any by-products with the main product.
  • C. To manage production orders for an entire finished product on multiple levels
  • D. To post production costs on a cost collector instead of the production order

正解:C


質問 # 29
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?

  • A. SAP Fieldglass
  • B. SAP Hybris
  • C. SAP Ariba
  • D. SAP Concur
  • E. SAP SuccessFactors

正解:A、C、D


質問 # 30
You want to create a production order from a planned order. What methods could you use?

  • A. Order release
  • B. Combined conversion
  • C. Partial conversion
  • D. Collective conversion

正解:C、D


質問 # 31
Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the advanced planning flag?

  • A. Production version
  • B. Plant
  • C. Work center
  • D. Material

正解:C、D


質問 # 32
You want to use capacity availability checks for production orders. Which settings have to be made for this?

  • A. The Relevant for Finite Scheduling indicator must be set
  • B. The PRT Availability Check must be set in the checking control.
  • C. An overall profile must be assigned in the checking control.
  • D. A checking rule must be assigned in the checking control

正解:A、C


質問 # 33
What are the possible results of a production planning run in Advanced Planning (PP/DS)?

  • A. Purchase requistion
  • B. Stock transport order
  • C. Planned order
  • D. Scheduling agreement schedule line
  • E. Production order

正解:A、C、D


質問 # 34
Which of the following elements does MRP take into account during net requirement calculation?

  • A. Safety stock
  • B. Lot size
  • C. Maximum stock level
  • D. Purchase orders

正解:A、B


質問 # 35
Which actions does the system preform by default when you save a confirmation for a finished product in repetitive manufacturing?

  • A. Posting of goods receipt for the product
  • B. Posting of production costs to the production cost collector
  • C. Archiving of documents for assembly scrap
  • D. Reduction of associated capacity requirements
  • E. Material staging for nex order in sequence

正解:A、B、D


質問 # 36
Which business processes are affected by setting in the order type-dependent parameters?

  • A. Select master data.
  • B. Implement engineering changes.
  • C. Intiate quality inspections.
  • D. Define integration to cost accounting.

正解:A、D


質問 # 37
Which time elements are relevant for lead time scheduling of a production order?

  • A. Planned delivery time
  • B. Float after production
  • C. Total replenishment lead time
  • D. Setup time

正解:A、B


質問 # 38
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing?

  • A. Assign planned orders manual lying the planning table.
  • B. Run MRP with quota arrangement.
  • C. Run MRP with automatic selection of production version.
  • D. Run PP/DS heuristics for repetitive manufacturing.

正解:B、D


質問 # 39
Which of the following processes lead to an entry in the MRP planing file?

  • A. Creation of dependent requirements
  • B. Change of the storage bin
  • C. Creation of purchasing contract
  • D. Change of the material's procurement type
  • E. Creation of sales order

正解:A、D、E


質問 # 40
An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?

  • A. Plants parameters
  • B. MRP profile
  • C. MRP group
  • D. MRP controller

正解:C


質問 # 41
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?

  • A. Demand Planning (DP)
  • B. Capacity Requirements Planning (CRP)
  • C. Supply Network Planning (SNP)
  • D. Material Requirements Planning (MRP)

正解:D


質問 # 42
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider?

  • A. In Customizing you can decide by material type whether to use the long material number.
  • B. The display template for material numbers applies to all clients.
  • C. The maximum mater all number length is 40 for external numbers and 18 for internal numbers
  • D. The number of leading zeros for internal numbers is client-specific.

正解:B、C


質問 # 43
Which of the following is valid sequence of the main activities in production order processing?

  • A. Creation, printing, release, goods issue, confirmation, goods receipt
  • B. Creation, release, printing, goods issue, confirmation, goods receipt
  • C. Creation, availability check, release, material widrawal, confirmation
  • D. Creation, release, settlement, goods issue, confirmation, goods receipt

正解:B、C


質問 # 44
......


SAP C-TS422-2021認定試験は、SAP S/4HANA生産計画と製造の分野でのスキルと知識を検証しようとしている専門家向けに設計されています。この認定は、SAP S/4HANA生産計画および製造ソリューションの構成と実装を担当する個人を対象としています。この試験では、SAP S/4HANAの生産計画と製造機能に関する候補者の知識と、この知識を実際のシナリオに適用する能力をテストします。

 

C_TS422_2021完全版問題集には無料PDF問題で合格させる:https://jp.fast2test.com/C_TS422_2021-premium-file.html

無料SAP Certified Application Associate C_TS422_2021公式認定ガイドPDFダウンロード:https://drive.google.com/open?id=1wxHpS_-OrHiVAPT-6ju1RJXvQSGn83De


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어