質問 # 57
Match the correct non-disruptive upgrade process step (answer column) with the correct sub-step (match column).
正解:
解説:
質問 # 58
How many nodes are in the base enclosure?
- A. 2 nodes configured as Active-Standby
- B. 1 node with high availability enabled
- C. 2 nodes configured as Active-Active
- D. 1 node with duel connectivity
正解:C
質問 # 59
What is the protocol used for the storage network?
- A. SMB
- B. iSCSI
- C. FC
- D. NFS
正解:B
質問 # 60
What is the alert severity if the license expiration date is within a week?
- A. Minor
- B. Warning
- C. Information
- D. Major
正解:A
質問 # 61
Refer to the exhibit.
What is the result of the network configuration show for a Dell EMC PowerStore T node A management port?
- A. VLAN 1 passes tagged traffic, VLAN 1501 passes untagged traffic
- B. VLAN 1 and VLAN 1501 pass untagged traffic
- C. VLAN 1 passes untagged traffic, VLAN 1501 passes tagged traffic
- D. VLAN 1 and VLAN 1501 pass tagged traffic
正解:C
質問 # 62
What describes the power requirements for Dell EMC PowerStore?
- A. Lower model numbered systems require less AC line current than higher model numbered systems
- B. T models require less total power than X models
- C. Lower model numbered systems require less input voltage (VAC) than higher model numbered systems
- D. X models require less total power than T models
正解:A
解説:
Maximum input power 240 VAC ± 10%, single phase For 100-120V, a customer-supplied step-up transformer is required AC Line Current (operating maximum at 200 VAC) 8.1 A 8.1 A 9.0 A 9.0 A 9.3 A 10.4 A https://www.dell.com/support/manuals/en-us/powerstore-5000/pwrstr-plang/power-requirements-for-powerstore-x-model-and-powerstore-t-model?guid=guid-21e142df-e22c-4bbc-8978-7c6124753654&lang=en-us
質問 # 63
What is an alternative way to collect logs instead of using the Dell EMC PowerStore manager GUI?
- A. USB stick inserted into the system
- B. Data Collect using Service Container
- C. Discovery Utility
- D. Data Collect using vCenter
正解:B
質問 # 64
How many fan module failures can a node tolerate?
- A. 0
- B. 1
- C. 2
- D. 3
正解:D
解説:
Reference:
https://www.dellemc.com/en-us/collaterals/unauth/white-papers/products/storage/h18149-dell-emc-powerstore-platform-introduction.pdf (14)
質問 # 65
Refer to the exhibit.
A Storage Administrator is troubleshooting a Dell EMC PowerStore T hardware issue. They observe that the base enclosure LED circled is blue. What does this indicate?
- A. Cluster has only a single appliance
- B. Base enclosure has a component hardware fault
- C. Base enclosure hardware is operating normally
- D. Appliance has a node in service mode
正解:C
質問 # 66
What is the alert severity if the license expiration date is within a week?
- A. Warning
- B. Information
- C. Minor
- D. Major
正解:A
質問 # 67
What is the result of setting a VLAN ID of 0 on a network when running ICW for Dell EMC PowerStore?
- A. Default route is set
- B. Network will pass untagged traffic
- C. Network will pass tagged traffic
- D. Static route is set
正解:B
質問 # 68
A Storage Administrator notices a Critical alert present in Dell EMC PowerStore Manager relating to data integrity. What action within the alert details slide-out panel is helpful in troubleshooting the problem?
- A. Examine Notifications to obtain a list of corrective actions
- B. Select the Gather Support Materials from Service and Support
- C. Access the Repair Flow link to schedule a support engagement
- D. Re-engage support through previous listed Related Events
正解:A
質問 # 69
Which LED combination shows a connected and working node?
- A. power: LED: steady green fault LED: off
- B. power LED: blinking green fault LED: off
- C. power LED: blinking green fault LED: blue
- D. power LED: steady green fault LED: amber
正解:A
質問 # 70
Which Dell EMC PowerStore network uses an appliance backplane?
- A. MPIO
- B. Inter-cluster management
- C. Inter-node
- D. ICD
正解:C
解説:
Reference:
https://blocksandfiles.com/2020/05/05/dell-emc-powerstore-midrange-array-launch-analysis/
質問 # 71
Refer to the exhibit.
What Dell EMC PowerStore ToR front-end cabling is shown?
- A. VLTi interconnectivity
- B. Management and discovery
- C. Core switch uplink
- D. OOB Management
正解:A
質問 # 72
When connecting a PowerStore base enclosure to 2 expansion enclosures, match the base SAS ports in column A to their corresponding expansion LCC ports in column B.
正解:
解説:
Reference:
https://www.dell.com/support/manuals/pk/en/pkbsd1/powerstore-1000/pwrstr-isg/cable-the-base-enclosure-to- the-expansion-enclosure?guid=guid-d68d049f-2b77-489f-b1ab-553f4f3de8aa&lang=en-us
質問 # 73
What describes Dell EMC PowerStore heat dissipation?
- A. Lower model numbered systems have lower heat dissipation specifications than higher model numbered systems
- B. X systems have higher heat dissipation specifics than T systems
- C. T systems have higher heat dissipation specifics than X systems
- D. Higher model numbered systems have lower heat dissipation specifications than lower model numbered systems
正解:B
質問 # 74
What describes Dell EMC PowerStore X power down?
- A. PowerStore X node, appliance, or cluster power down utilizes the VSi plugin to perform the needed vCenter server operations
- B. PowerStore X node, appliance, or cluster power down is done entirely with vCenter server commands
- C. Powering down a PowerStore X node, appliance, or cluster requires additional vCenter server commands
- D. Powering down a PowerStore X node, appliance, or cluster is done in the same manner as a PowerStore T
正解:C