別格で売上ナンバーワンCTS-I試験にはは2025年最新のAVIXA練習問試験合格させます
AVIXA Certification問題集でCTS-I試験完全版問題で試験学習ガイド
質問 # 16
Which of the following are HDCP authentication steps?
Select all that apply.
Response:
- A. Locality check
- B. Session exchange
- C. Key exchange
- D. Audio and video sync check
正解:A、B、C
質問 # 17
Write the correct name for each symbol in the column on the right.
Response:
- A. D = Detail flag
- B. C = Column lines
- C. B = Section cut flag
- D. A = Match line
- E. E = Elevation flag
正解:A、B、C、D、E
質問 # 18
Raised bumps on the head of a bolt indicate which of the following?
Response:
- A. Size of head
- B. Length of bolt
- C. Grade of bolt
- D. Defect in manufacturing
正解:C
質問 # 19
The following image illustrates:
[Installing AV Systems/Terminate Cables]
Response:
- A. A poorly prepared termination point for a DB-9 connection
- B. A poorly stripped cable for use with a G type connector
- C. A properly stripped cable for a linear compression BNC connector
- D. A properly prepared connection for an RJ-45 termination
正解:C
質問 # 20
What are key considerations when determining projector placement?
Select all that apply.
Response:
- A. Standard deviation
- B. Offset value
- C. Throw distance
- D. Type of lens
正解:B、C、D
質問 # 21
In an electrical system, a ground fault is ___.
Response:
- A. an electrical connection between any grounded conductor and any non-current-carrying metal object
- B. an interruption of a cable shield connection
- C. a continuous isolation between receptacles and electrical circuits
- D. an electrically conductive area that has two or more ground reference connections
正解:A
質問 # 22
When mounting a 75 lb (34 kg) projector with a 15 lb (7 kg) mount, the substructure should be able to support a minimum weight of:
[Conducting Site Rough-In/First-Fix/Mount Substructure]
Response:
- A. 450 lbs (204 kg)
- B. 90 lbs (41 kg)
- C. 180 lbs (82 kg)
- D. 270 lbs (122 kg)
正解:A
質問 # 23
What assumptions should you make about an audio system when there is no audio output?
(Choose all that apply.)
Response:
- A. The mixing desk channel for the microphone is switched to line input mode.
- B. Make no assumptions at all and select a troubleshooting strategy
- C. The gain on the main audio amplifier may be wound down to zero
- D. The user is a complete idiot and did not switch the microphone on.
正解:B
質問 # 24
What is a dependency within a project task schedule?
Response:
- A. A task that must be completed by a specific date
- B. A task that cannot begin before another task has been completed
- C. A task that will be required if specific conditions occur at the project site
- D. An optional task that the client can determine is needed once the project is underway
正解:B
質問 # 25
A technician installs a condenser microphone. It is not picking up audio. What is the MOST LIKLEY cause?
Response:
- A. The microphone is defective
- B. The cable run is too long
- C. Pins 2 and 3 are swapped at the XLR connector
- D. Phantom power is turned off
正解:D
質問 # 26
Which statement accurately describes what you should do when de-installing existing equipment?
Response:
- A. Dispose of equipment right away
- B. Smash the hardware so that data cannot be stolen
- C. Remove the connecting cables
- D. Call an electronic waste recycling contractor
正解:C
質問 # 27
Which type of control system provides device operation by opening or closing an electrical current or voltage loop?
Response:
- A. Contact closure
- B. Serial control
- C. IR control
- D. RF control
正解:A
質問 # 28
What is a ground loop?
Response:
- A. An electrically conductive area that has two or more ground reference connections
- B. An interruption of a cable shield connection
- C. An electrical connection between any grounded conductor and any non-current-carrying metal object
- D. A continuous isolation between receptacles and electrical circuits
正解:A
質問 # 29
Why is it better to test control systems in the shop?
Select all that apply.
Response:
- A. It allows more time to fix problems.
- B. It prevents customers from asking questions.
- C. It may provide better access to help from internal teams.
- D. It allows time for longer breaks.
正解:A、C
質問 # 30
For an ethernet cable (UTP) to meet certification standards, the maximum length is Response:
- A. 492, or 150m
- B. 98, or 30m
- C. 328, or 100m
- D. 984, or 300m
正解:C
質問 # 31
What piece of test equipment is used to assist in setting up an equalizer in a room?
Response:
- A. Impedance bridge
- B. VTG
- C. Real Time Analyzer
- D. Volt meter
正解:C
質問 # 32
Which of these are layer 2 protocols commonly used to transport real-time media over a network?
Select all that apply.
Response:
- A. TCP
- B. CobraNet
- C. UDP
- D. AVB
正解:B、C、D
質問 # 33
Which of the following are elements of a control system?
Select all that apply.
Response:
- A. Spyware
- B. Hardware
- C. Software
- D. Firmware
正解:B、C、D
質問 # 34
What type of connector is shown in the following image?
Response:
- A. VGA
- B. BNC
- C. RCA
- D. XLR
正解:D
質問 # 35
Single-mode fiber-optic cables can transmit AV signals up to a distance of __________ before quality is compromised.
Response:
- A. 656 feet (200 meters)
- B. 984 feet (300 meters)
- C. 9,840 feet (3,000 meters)
- D. 6561 feet (2,000 meters)
正解:D
質問 # 36
How would a commissioning technician establish substantial completion/practical completion?
Response:
- A. Generate a list of all damaged equipment, setting up the DSP
- B. Complete all preliminary tests, confirm systems installation and readiness for final test
- C. Generate a punch or defects list, getting architects to sign off on repairs
- D. Complete a request for changes form, filing an RFQ
正解:B
質問 # 37
Before Installation begins, it is most important to:
Response:
- A. Have the equipment delivered to site
- B. Make sure the Client has made a deposit payment
- C. Have a project plan created
- D. Have a clear understanding of the scope of work
正解:D
質問 # 38
What are possible reasons for no picture on the screen?
Select all that apply.
Response:
- A. The hot plug pin is unable to detect a display device.
- B. The source device is unable to read EDID data packets.
- C. A switcher is intercepting the hot plug detection.
- D. The display device is not plugged in.
正解:A、B、C、D
質問 # 39
In an electrical power distribution installation, the safety earth/ground connects to___.
(Choose all that apply.)
Response:
- A. equipment racks
- B. the ground (planet Earth)
- C. raceways, ducts, conduit, and cable trays
- D. exposed conductive parts of the installation
正解:C
質問 # 40
......
最適な道は練習テストAVIXA CTS-I問題集:https://jp.fast2test.com/CTS-I-premium-file.html
CTS-I問題集が待ってます試験問題解答:https://drive.google.com/open?id=1qOOahx_sEeMjFqL12BWK_64LfsXjZWCR