質問 # 16
Which of the following are HDCP authentication steps?
Select all that apply.
Response:

  • A. Locality check
  • B. Session exchange
  • C. Key exchange
  • D. Audio and video sync check

正解:A、B、C


質問 # 17
Write the correct name for each symbol in the column on the right.

Response:

  • A. D = Detail flag
  • B. C = Column lines
  • C. B = Section cut flag
  • D. A = Match line
  • E. E = Elevation flag

正解:A、B、C、D、E


質問 # 18
Raised bumps on the head of a bolt indicate which of the following?
Response:

  • A. Size of head
  • B. Length of bolt
  • C. Grade of bolt
  • D. Defect in manufacturing

正解:C


質問 # 19
The following image illustrates:
[Installing AV Systems/Terminate Cables]

Response:

  • A. A poorly prepared termination point for a DB-9 connection
  • B. A poorly stripped cable for use with a G type connector
  • C. A properly stripped cable for a linear compression BNC connector
  • D. A properly prepared connection for an RJ-45 termination

正解:C


質問 # 20
What are key considerations when determining projector placement?
Select all that apply.
Response:

  • A. Standard deviation
  • B. Offset value
  • C. Throw distance
  • D. Type of lens

正解:B、C、D


質問 # 21
In an electrical system, a ground fault is ___.
Response:

  • A. an electrical connection between any grounded conductor and any non-current-carrying metal object
  • B. an interruption of a cable shield connection
  • C. a continuous isolation between receptacles and electrical circuits
  • D. an electrically conductive area that has two or more ground reference connections

正解:A


質問 # 22
When mounting a 75 lb (34 kg) projector with a 15 lb (7 kg) mount, the substructure should be able to support a minimum weight of:
[Conducting Site Rough-In/First-Fix/Mount Substructure]
Response:

  • A. 450 lbs (204 kg)
  • B. 90 lbs (41 kg)
  • C. 180 lbs (82 kg)
  • D. 270 lbs (122 kg)

正解:A


質問 # 23
What assumptions should you make about an audio system when there is no audio output?
(Choose all that apply.)
Response:

  • A. The mixing desk channel for the microphone is switched to line input mode.
  • B. Make no assumptions at all and select a troubleshooting strategy
  • C. The gain on the main audio amplifier may be wound down to zero
  • D. The user is a complete idiot and did not switch the microphone on.

正解:B


質問 # 24
What is a dependency within a project task schedule?
Response:

  • A. A task that must be completed by a specific date
  • B. A task that cannot begin before another task has been completed
  • C. A task that will be required if specific conditions occur at the project site
  • D. An optional task that the client can determine is needed once the project is underway

正解:B


質問 # 25
A technician installs a condenser microphone. It is not picking up audio. What is the MOST LIKLEY cause?
Response:

  • A. The microphone is defective
  • B. The cable run is too long
  • C. Pins 2 and 3 are swapped at the XLR connector
  • D. Phantom power is turned off

正解:D


質問 # 26
Which statement accurately describes what you should do when de-installing existing equipment?
Response:

  • A. Dispose of equipment right away
  • B. Smash the hardware so that data cannot be stolen
  • C. Remove the connecting cables
  • D. Call an electronic waste recycling contractor

正解:C


質問 # 27
Which type of control system provides device operation by opening or closing an electrical current or voltage loop?
Response:

  • A. Contact closure
  • B. Serial control
  • C. IR control
  • D. RF control

正解:A


質問 # 28
What is a ground loop?
Response:

  • A. An electrically conductive area that has two or more ground reference connections
  • B. An interruption of a cable shield connection
  • C. An electrical connection between any grounded conductor and any non-current-carrying metal object
  • D. A continuous isolation between receptacles and electrical circuits

正解:A


質問 # 29
Why is it better to test control systems in the shop?
Select all that apply.
Response:

  • A. It allows more time to fix problems.
  • B. It prevents customers from asking questions.
  • C. It may provide better access to help from internal teams.
  • D. It allows time for longer breaks.

正解:A、C


質問 # 30
For an ethernet cable (UTP) to meet certification standards, the maximum length is Response:

  • A. 492, or 150m
  • B. 98, or 30m
  • C. 328, or 100m
  • D. 984, or 300m

正解:C


質問 # 31
What piece of test equipment is used to assist in setting up an equalizer in a room?
Response:

  • A. Impedance bridge
  • B. VTG
  • C. Real Time Analyzer
  • D. Volt meter

正解:C


質問 # 32
Which of these are layer 2 protocols commonly used to transport real-time media over a network?
Select all that apply.
Response:

  • A. TCP
  • B. CobraNet
  • C. UDP
  • D. AVB

正解:B、C、D


質問 # 33
Which of the following are elements of a control system?
Select all that apply.
Response:

  • A. Spyware
  • B. Hardware
  • C. Software
  • D. Firmware

正解:B、C、D


質問 # 34
What type of connector is shown in the following image?

Response:

  • A. VGA
  • B. BNC
  • C. RCA
  • D. XLR

正解:D


質問 # 35
Single-mode fiber-optic cables can transmit AV signals up to a distance of __________ before quality is compromised.
Response:

  • A. 656 feet (200 meters)
  • B. 984 feet (300 meters)
  • C. 9,840 feet (3,000 meters)
  • D. 6561 feet (2,000 meters)

正解:D


質問 # 36
How would a commissioning technician establish substantial completion/practical completion?
Response:

  • A. Generate a list of all damaged equipment, setting up the DSP
  • B. Complete all preliminary tests, confirm systems installation and readiness for final test
  • C. Generate a punch or defects list, getting architects to sign off on repairs
  • D. Complete a request for changes form, filing an RFQ

正解:B


質問 # 37
Before Installation begins, it is most important to:
Response:

  • A. Have the equipment delivered to site
  • B. Make sure the Client has made a deposit payment
  • C. Have a project plan created
  • D. Have a clear understanding of the scope of work

正解:D


質問 # 38
What are possible reasons for no picture on the screen?
Select all that apply.
Response:

  • A. The hot plug pin is unable to detect a display device.
  • B. The source device is unable to read EDID data packets.
  • C. A switcher is intercepting the hot plug detection.
  • D. The display device is not plugged in.

正解:A、B、C、D


質問 # 39
In an electrical power distribution installation, the safety earth/ground connects to___.
(Choose all that apply.)
Response:

  • A. equipment racks
  • B. the ground (planet Earth)
  • C. raceways, ducts, conduit, and cable trays
  • D. exposed conductive parts of the installation

正解:C


質問 # 40
......

最適な道は練習テストAVIXA CTS-I問題集:https://jp.fast2test.com/CTS-I-premium-file.html

CTS-I問題集が待ってます試験問題解答:https://drive.google.com/open?id=1qOOahx_sEeMjFqL12BWK_64LfsXjZWCR


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어