
SAP C_S4CMA_2308テストエンジン問題集トレーニングには162問あります
C_S4CMA_2308問題一発合格させる問題集はSAP Certified Application Associate認定
質問 # 17
A customer needs detailed customization to the standard forms and email templates. What solution should the consultant propose?
- A. Use the corresponding configuration items to modify elements of the form template
- B. Use the Adobe Livecycle Designer tool to edit a standard template
- C. Create a custom UI with the Custom Filds and Logic app
- D. Use the Output Management apps to customize a standard template
正解:D
質問 # 18
How can you determine the configuration in the Make-to-Order Production with Variant Configuration (1YT) scope item?
- A. By defining the different component characteristics in the sales order
- B. By defining a variant based on characteristic planning
- C. By characteristics-based planning and a Material Requirements Planning run
- D. By consumption using the descriptive characteristic "customer"
正解:A
質問 # 19
What are some responsibilities of a Customer Center of Expertise (CCOE)? Note:
There are 3 correct answers to this question
- A. Conduct risk-based assessments to determine the value of activating new processes.
- B. Determine KPIs that will support a continuous improvement mindset.
- C. Ensure the resources necessary for the project's success are available.
- D. Reduce the total cost of ownership for IT.
- E. Serve as a central contact for SAP and manage interactions with the SAP Service Center.
正解:A、B、D
質問 # 20
To which system do you upload the Extensibility Templates with the Import Extensibility Template app?
- A. All System
- B. Trial System
- C. Production System
- D. Quality System
正解:D
質問 # 21
For which extensibility approach do you use SAP Cloud Platform?
- A. Side-by-side extensibility
- B. Key user extensibility
- C. Managed extensibility
- D. Classic extensibility
正解:A
質問 # 22
In the SAP Best Practices Scenario Make-to-Stock Production - Discrete Manufacturing (BJ5), which role can perform the following actions?
Create Planned Independent Requirements (PIRs) / Execute Material Requirements Planning / Evaluate Stock-Requirements Situation
- A. Production Planner
- B. Production Operator
- C. Production Supervisor
- D. Warehouse Clerk
正解:A
質問 # 23
Which capabilities are included in the SAP Fiori app Maintain PIRs in the SAP Best Practices Scenario Make to-Stock Production - Repetitive Manufacturing (BJH)? (2 correct) *
- A. Find materials with issues regarding the material status
- B. Open a list of goods movements for a material
- C. Preview the effects of proposed shortage solutions
- D. Create planned independent requirements
正解:C、D
質問 # 24
What are customers able to scope in SAP S/4 HANA Cloud with Central Business Configuration (CBC)? (3 correct)
- A. Public sector processes
- B. Countries where business processes will run
- C. Non-standard scenarios
- D. Scope extensions
- E. Pre-defined scenario bundles
正解:B、C、E
質問 # 25
In SAP Central Business Configuration, which activities can you perform in the Product-Specific Configuration Phase? Note: There are 3 correct answers to this question.
- A. Change approval thresholds
- B. Add new sales organizations.
- C. Add blocking reasons for billing.
- D. Modify building blocks
- E. Create new scope items.
正解:A、B、E
質問 # 26
You have launched the Manage Your Solution app in SAP S/4HANA C correct)
- A. Migrate Your Data
- B. Manage Orders and Notifications in Information Center
- C. Confirm Jobs
- D. View Solution Scope
- E. Configure Your Solution
正解:A、D、E
質問 # 27
Which organizational units can form a sales area in SAP S/4HANA Cloud?
- A. The sales organization, the delivering plant, and the division
- B. The sales organization, the distribution channel, and the division
- C. The sales organization, the distribution channel, and the shipping point
- D. The company code, the plant, and the sales organization
正解:B
質問 # 28
Which organizational units are directly linked to a plant? (2 correct)
- A. Storage location
- B. Sales office
- C. Credit control area
- D. Company code
正解:A、D
質問 # 29
What are some production execution tasks? (3 correct) *
- A. Staging material before production starts
- B. Reporting goods withdrawals
- C. Defining quality-related data for generic master data records
- D. Setting up the MRP run
- E. Entering goods receipt information on completion of the product
正解:A、C、D
質問 # 30
Which ways of posting goods issues does the Make-to-Stock Production - Process Manufacturing (2UG) scope item support? (3 correct)
- A. Component backflush during production confirmation
- B. Goods issue via backlog list and post processing records
- C. Order-specific goods issue posting via action control key
- D. Goods issue of batch managed components via pick list
- E. Goods issue of batch managed components manually
正解:A、D、E
質問 # 31
You reviewed the project scope and identified the corresponding resources. Based on the SAP Activate methodology, which activities must you perform in the Explore phase? (2 correct)
- A. Conduct the Fit-to-Standard workshops to identify fits, gaps, and perceived gaps
- B. Use the Quality system to demonstrate SAP Best Practices processes
- C. Configure the organizational structure and chart of accounts in the system
- D. Use the Starter system to demonstrate SAP Best Practices processes
正解:B、D
質問 # 32
In the Enabling Manufacturing Subsidiary to Handle Assembly for Headquarters (2WL) scope item, which billing settings can you make in the Billing Documents app so the system does the following actions automatically when you create billing documents? (2 correct)
- A. Post components backflush with billing automatically
- B. Enter billing type and date before billing
- C. Post billing documents automatically
- D. Collect billing documents for common posting
正解:B、C
質問 # 33
......
C_S4CMA_2308練習テストPDF試験材料:https://jp.fast2test.com/C_S4CMA_2308-premium-file.html