質問 # 63
What are some of the limitations of a large event? There are 2 correct answers to this question.

  • A. The system limit is 30 terms per line.
  • B. The system limit is 125 suppliers.
  • C. The system limit is 2000 line items.
  • D. The system limits the bidding through Microsoft Excel only.

正解:A、D


質問 # 64
Which auction types must include "Serial" for the event rule "Specify how lot bidding will begin and end"?
Note: there are 2 correct answers to this question.

  • A. Traffic light auction
  • B. Japanese reverse auction
  • C. English reverse auction
  • D. Dutch reverse auction

正解:C、D


質問 # 65
How are due dates set?

  • A. Dates are set relative to the completition of the previous task
  • B. Dates are set relative to the start of the parent phase
  • C. Dates are set relative to the start of the project
  • D. Fixed dates are manually set by the project owner;

正解:B、D


質問 # 66
How can you limit the number of instances of the dForm that can be created within a sourcing project?

  • A. Update task settings
  • B. Update the template with an ad hoc create limit
  • C. Update system parameters
  • D. Update the dForm

正解:B


質問 # 67
On which tab of the enablement workbook do you update custom event message verbiage?

  • A. Appendix tab for enablement languages
  • B. Instructions
  • C. Company logo & Custom Messages
  • D. Worksheet Descriptions

正解:A


質問 # 68
What documentation is provided by the Shared Services team during an SAP Ariba Sourcing deployment?
There are 3 correct answers to this question.

  • A. Standard project plan
  • B. Functional design specification
  • C. Weekly steering committee updates presentation
  • D. Deployment summary/wrap-up collateral
  • E. Kick-off presentation

正解:B、D、E


質問 # 69
What is a sourcing request?

  • A. A project that automatically becomes a full sourcing project upon approval
  • B. A document sent to a supplier to obtain information prior to a sourcing event
  • C. A document that is used to ask the company authorized sourcing team to bid a product or service
  • D. A copy of an existing sourcing project used as a staring point for a new sourcing project

正解:C


質問 # 70
What solutions are included in the SAP Ariba Strategic Sourcing Suite? Note: There are 2 correct answers to this question.

  • A. SAP Ariba Spend Analysis
  • B. SAP Ariba Supplier Lifecycle and Performance
  • C. SAP Ariba Buying and Invoicing
  • D. SAP Ariba Contracts

正解:B、D


質問 # 71
Which of the following integration options leverages comma-separated values (CSV) upload over HTTPS?

  • A. SAP direct connectivity
  • B. Batch file channel transfer with the integration toolkit (ITK)
  • C. Web services (SOAP)
  • D. Mediated connectivity (Customer middleware)

正解:B


質問 # 72
What functionality allows you to send the same event to multiple contacts of one supplier?

  • A. Supplier response team
  • B. Supplier research posting
  • C. Mass invitation
  • D. Incumbent suppliers

正解:A


質問 # 73
What deployment activities are performed by Shared Services?

  • A. Onsite project management
  • B. Project kick-off
  • C. End-of-project quality review;
  • D. Project go live

正解:B、C


質問 # 74
Which of the following event templates are intended to sell goods that you have in stock?

  • A. RFP
  • B. RFI
  • C. Reverse auction
  • D. Forward auction

正解:D


質問 # 75
How do suppliers bid in a Dutch reverse auction?

  • A. They submit progressively lower bids to beat their competitors
  • B. They submit technical qualifications only with no pricing data
  • C. They watch the buyer increase the price periodically and bid at their lowest acceptable price
  • D. They read the buyers specifications and submit their best price

正解:C


質問 # 76
Which event timing is represented by the attached graphic?

  • A. Staggered
  • B. Serial
  • C. Dutch
  • D. Parallel

正解:A


質問 # 77
In a multistage event, what is the purpose of running an RFI before conducting an RFP or an auction? Note:
There are 2 correct answers to this question.

  • A. To verify if suppliers can meet the specifications
  • B. To narrow the list of suppliers to invite to later events
  • C. To gain a preliminary bid from each supplier
  • D. To gather pricing and capability information

正解:A、B


質問 # 78
What options are available to split or partially award lots with multiple line items?

  • A. All line items in the lot split by percentage
  • B. Only a partial percentage of the lot awarded
  • C. All line items in the lot split by a quantity
  • D. Each line item awarded to a different supplier

正解:A、B


質問 # 79
What are the available event types when creating a quick project? Note: there are 3 correct answers to this question.

  • A. Auction
  • B. RFI
  • C. RFx
  • D. RFP
  • E. RFQ

正解:A、B、D


質問 # 80
......

有効な問題最新版を試そうC_ARSOR_2404テスト解釈C_ARSOR_2404有効な試験ガイド:https://jp.fast2test.com/C_ARSOR_2404-premium-file.html

C_ARSOR_2404試験資料SAP学習ガイド:https://drive.google.com/open?id=1rFbWNvVbS2Br1a7oiPsOtabYUzWDNFDE


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어