SAP C_ARSOR_2404テストエンジン練習テスト問題、試験問題集
100%無料C_ARSOR_2404日常練習試験には169問があります
質問 # 63
What are some of the limitations of a large event? There are 2 correct answers to this question.
- A. The system limit is 30 terms per line.
- B. The system limit is 125 suppliers.
- C. The system limit is 2000 line items.
- D. The system limits the bidding through Microsoft Excel only.
正解:A、D
質問 # 64
Which auction types must include "Serial" for the event rule "Specify how lot bidding will begin and end"?
Note: there are 2 correct answers to this question.
- A. Traffic light auction
- B. Japanese reverse auction
- C. English reverse auction
- D. Dutch reverse auction
正解:C、D
質問 # 65
How are due dates set?
- A. Dates are set relative to the completition of the previous task
- B. Dates are set relative to the start of the parent phase
- C. Dates are set relative to the start of the project
- D. Fixed dates are manually set by the project owner;
正解:B、D
質問 # 66
How can you limit the number of instances of the dForm that can be created within a sourcing project?
- A. Update task settings
- B. Update the template with an ad hoc create limit
- C. Update system parameters
- D. Update the dForm
正解:B
質問 # 67
On which tab of the enablement workbook do you update custom event message verbiage?
- A. Appendix tab for enablement languages
- B. Instructions
- C. Company logo & Custom Messages
- D. Worksheet Descriptions
正解:A
質問 # 68
What documentation is provided by the Shared Services team during an SAP Ariba Sourcing deployment?
There are 3 correct answers to this question.
- A. Standard project plan
- B. Functional design specification
- C. Weekly steering committee updates presentation
- D. Deployment summary/wrap-up collateral
- E. Kick-off presentation
正解:B、D、E
質問 # 69
What is a sourcing request?
- A. A project that automatically becomes a full sourcing project upon approval
- B. A document sent to a supplier to obtain information prior to a sourcing event
- C. A document that is used to ask the company authorized sourcing team to bid a product or service
- D. A copy of an existing sourcing project used as a staring point for a new sourcing project
正解:C
質問 # 70
What solutions are included in the SAP Ariba Strategic Sourcing Suite? Note: There are 2 correct answers to this question.
- A. SAP Ariba Spend Analysis
- B. SAP Ariba Supplier Lifecycle and Performance
- C. SAP Ariba Buying and Invoicing
- D. SAP Ariba Contracts
正解:B、D
質問 # 71
Which of the following integration options leverages comma-separated values (CSV) upload over HTTPS?
- A. SAP direct connectivity
- B. Batch file channel transfer with the integration toolkit (ITK)
- C. Web services (SOAP)
- D. Mediated connectivity (Customer middleware)
正解:B
質問 # 72
What functionality allows you to send the same event to multiple contacts of one supplier?
- A. Supplier response team
- B. Supplier research posting
- C. Mass invitation
- D. Incumbent suppliers
正解:A
質問 # 73
What deployment activities are performed by Shared Services?
- A. Onsite project management
- B. Project kick-off
- C. End-of-project quality review;
- D. Project go live
正解:B、C
質問 # 74
Which of the following event templates are intended to sell goods that you have in stock?
- A. RFP
- B. RFI
- C. Reverse auction
- D. Forward auction
正解:D
質問 # 75
How do suppliers bid in a Dutch reverse auction?
- A. They submit progressively lower bids to beat their competitors
- B. They submit technical qualifications only with no pricing data
- C. They watch the buyer increase the price periodically and bid at their lowest acceptable price
- D. They read the buyers specifications and submit their best price
正解:C
質問 # 76
Which event timing is represented by the attached graphic?
- A. Staggered
- B. Serial
- C. Dutch
- D. Parallel
正解:A
質問 # 77
In a multistage event, what is the purpose of running an RFI before conducting an RFP or an auction? Note:
There are 2 correct answers to this question.
- A. To verify if suppliers can meet the specifications
- B. To narrow the list of suppliers to invite to later events
- C. To gain a preliminary bid from each supplier
- D. To gather pricing and capability information
正解:A、B
質問 # 78
What options are available to split or partially award lots with multiple line items?
- A. All line items in the lot split by percentage
- B. Only a partial percentage of the lot awarded
- C. All line items in the lot split by a quantity
- D. Each line item awarded to a different supplier
正解:A、B
質問 # 79
What are the available event types when creating a quick project? Note: there are 3 correct answers to this question.
- A. Auction
- B. RFI
- C. RFx
- D. RFP
- E. RFQ