[Q11-Q29] 究極のガイド準備問題C_IBP_2302には正確なPDF解答[2023年12月28日]

Share

究極のガイド準備問題C_IBP_2302には正確なPDF解答[2023年12月28日]

合格できるSAPの試験問題集


SAP C-IBP-2302試験は、サプライチェーン管理のためのSAP IBP(統合事業計画)の専門知識を実証したい個人向けに設計されています。この認定は、SAP IBPの候補者の知識とスキルを検証します。これは、組織がサプライチェーンプロセスを合理化するのに役立つ高度な計画と最適化ソリューションです。この試験では、需要計画、供給計画、在庫の最適化、販売および運用計画など、さまざまなトピックをカバーしています。

 

質問 # 11
Which of the following are features of lag-based snapshots?Note: There are 2 correct answers to this question.

  • A. The number of lag-based snapshots are limited to nine levels.
  • B. Target key figures for these snapshots must have lag as a root attribute in its base planning level.
  • C. Target key figures for these snapshots are exposed to the user in planning views.
  • D. Lag-based snapshots are created in the Configuration app for a fixed time range.

正解:B、D


質問 # 12
Time profiles are made out of levels, and levels are made out of periods.Which ways can SAP IBP identify profiles and periods?Note: There are 2 correct answers to this question.

  • A. Periods are identified by an integer and profiles by an alphanumeric prefix.
  • B. Both periods and profiles have start and end dates.
  • C. Periods are identified by an alphanumeric prefix and profiles by an integer.
  • D. Both periods and profiles are identified by a unique integer.

正解:A、C


質問 # 13
Which of the following solutions are feasible when using the time series supply optimizer?Note: There are 3 correct answers to this question.

  • A. Not adhering to maximum transport values
  • B. Violation of minimum resource utilization
  • C. Violation of minimum aggregated inventory values
  • D. Not respecting production capacity
  • E. Not-fully satisfied demands

正解:B、C、E


質問 # 14
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing.Which of the following parameters can you model to plan production with extra shift(s)?

  • A. Incremental production values
  • B. Adjusted production interactive values
  • C. Capacity expansion with additional costs
  • D. Production source validity at the start of seasonal peak

正解:C


質問 # 15
What are some of the available ABC segmentation methods in SAP IBP?Note: There are 2 correct answers to this question.

  • A. By Pareto Principle (Sorted and Calculated Values)
  • B. By Number of Items (Sorted Values)
  • C. By Number of Items (Sorted Average)
  • D. By Pareto Principle (Sorted and Cumulated %)

正解:A、B


質問 # 16
Which sets of chart types are provided within the Analytics Advanced application?Note: There are 3 correct answers to this question.

  • A. Simulation Chart Types
  • B. Geographic Chart Types
  • C. Trend Chart Types
  • D. Seasonal Chart Types
  • E. Comparison Chart Types

正解:C、D、E


質問 # 17
Which of the following are functions of SAP IBP for demand?Note: There are 2 correct answers to this question.

  • A. Detailed statistical analysis of demand data using predictive analytics tools
  • B. Consideration of demand-driven analysis for buffer positioning.
  • C. Embedded, on-the-fly demand analytics
  • D. Demand sensing of demand data using predictive analytics tools

正解:A、C


質問 # 18
A time profile is defined with these levels: day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?

  • A. IF("PERIODID2" ="$$PERIODID2CU$$...)
  • B. IF("PERIODID5" ="$$PERIODID5CU$$...)
  • C. IF("PERIODID3" ="$$PERIODID3CU$$...)
  • D. IF("PERIODID4" ="$$PERIODID4CU$$...)

正解:D


質問 # 19
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note: There are 3 correct answers to this question.

  • A. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
  • B. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
  • C. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
  • D. It checks whether the required planning level master data exists for a subset of input key figures.
  • E. It checks whether the sourcing in the Production Source Item Master Data type exists.

正解:B、C、D


質問 # 20
Analytics charts are created by the user in the Advanced Analytics application.What can the user do in the Advanced Analytics app?Note: There are 2 correct answers to this question.

  • A. Merge charts together.
  • B. Open graphics in Excel.
  • C. Group data.
  • D. Apply filters on your data.

正解:C、D


質問 # 21
Why would you set up a cascading filter in the planning view?Note: There are 2 correct answers to this question.

  • A. To filter attributes based on other attribute filters
  • B. To filter using attributes that have a large number of values
  • C. To filter data in an Application Job template
  • D. To filter attributes based on specific values

正解:B、D


質問 # 22
Which of the following are features of the S&OP process templates?Note: There are 2 correct answers to this question.

  • A. Each step depicted in the template can have tasks associated with it.
  • B. All process templates are assigned to dashboards.
  • C. New instances of templates allow for re-use of the same processes.
  • D. The S&OP process step can be started with an application job.

正解:A、C


質問 # 23
Which pre-processing steps can be used to cleanse historical sales data before generating a statistical forecast in SAP IBP?Note: There are 2 correct answers to this question.

  • A. Bias Detection and Correction in Sales History
  • B. Substitute Missing with Mean or Median in Sales History
  • C. Promotion Sales Lift Elimination
  • D. Intermittency Detection and Correction in Sales History

正解:B、C


質問 # 24
What are the ways to achieve rolling aggregation with SAP IBP?

  • A. Using a attribute as a key figure
  • B. Using a local member
  • C. Using a key figure calculation
  • D. Using a appropriate period weight factor

正解:D


質問 # 25
You need to use your resource cost effectively with a certain minimum use, even if it means producing more than demand.Which solutions would apply to this scenario?Note: There are 2 correct answers to this question.

  • A. Balance can be achieved between excessive prebuild and minimum use by incorporating violation costs.
  • B. Capacity leveling will be possible for production and storage resources.
  • C. Excess stock can be generated and will need to be staged in an overflow warehouse.
  • D. Minimum capacity utilization will result in pull production occurring.

正解:A、C


質問 # 26
Using the import/export functionality means working with groups of items that are organized into collections.What is the best practice for managing collections?

  • A. Configuration items should be bundled in the collections based on the SAP IBP project stream.
  • B. You should delete collections after they have been transported.
  • C. A planning area with the copy operators assigned must be bundled in one collection.
  • D. A planning area with its time profile must be bundled in one collection.

正解:C、D


質問 # 27
How can the SAP IBP scenario modeling functionality support business users in the S&OP planning cycle?Note: There are 2 correct answers to this question.

  • A. Simulate demand sensing inputs for Supply Review
  • B. Simulate statistical forecast at the Demand Review stage
  • C. Model inventory turns based on Target Safety stocks
  • D. Simulate heuristics run in Supply Review stage

正解:B、D


質問 # 28
You are developing the functionality and appearance of the Excel UI for SAP IBP business users.Which extensibility capabilities for SAP IBP, add-in for Microsoft Excel are provided by Custom VBA coding?Note: There are 2 correct answers to this question.

  • A. Changing the layout of the master data workbooks
  • B. SAP IBP ribbon extension
  • C. Changing the entries from the Name Manager
  • D. Changing the member names

正解:A、B


質問 # 29
......


SAP C_IBP_2302の試験に備えるには、IBPプラットフォームの包括的な理解が必要です。候補者は、IBPモジュール、主要なパフォーマンス指標(KPI)、および関連するデータモデルについて深い理解を持つ必要があります。また、SAPおよび非SAPシステムとのデータマッピング、データ統合、IBPユーザーインターフェースに関する知識も必要です。

 

最新C_IBP_2302試験問題集で有効で最新の問題集:https://jp.fast2test.com/C_IBP_2302-premium-file.html

完全版で最新のC_IBP_2302問題集で100%カバー率問題と解答があなたをリアル試験で合格させる:https://drive.google.com/open?id=1CYDFV1D5sk0CJgt5Kg5V0Qf2db83SagW


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어