質問 # 11
Which of the following are features of lag-based snapshots?Note: There are 2 correct answers to this question.
- A. The number of lag-based snapshots are limited to nine levels.
- B. Target key figures for these snapshots must have lag as a root attribute in its base planning level.
- C. Target key figures for these snapshots are exposed to the user in planning views.
- D. Lag-based snapshots are created in the Configuration app for a fixed time range.
正解:B、D
質問 # 12
Time profiles are made out of levels, and levels are made out of periods.Which ways can SAP IBP identify profiles and periods?Note: There are 2 correct answers to this question.
- A. Periods are identified by an integer and profiles by an alphanumeric prefix.
- B. Both periods and profiles have start and end dates.
- C. Periods are identified by an alphanumeric prefix and profiles by an integer.
- D. Both periods and profiles are identified by a unique integer.
正解:A、C
質問 # 13
Which of the following solutions are feasible when using the time series supply optimizer?Note: There are 3 correct answers to this question.
- A. Not adhering to maximum transport values
- B. Violation of minimum resource utilization
- C. Violation of minimum aggregated inventory values
- D. Not respecting production capacity
- E. Not-fully satisfied demands
正解:B、C、E
質問 # 14
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing.Which of the following parameters can you model to plan production with extra shift(s)?
- A. Incremental production values
- B. Adjusted production interactive values
- C. Capacity expansion with additional costs
- D. Production source validity at the start of seasonal peak
正解:C
質問 # 15
What are some of the available ABC segmentation methods in SAP IBP?Note: There are 2 correct answers to this question.
- A. By Pareto Principle (Sorted and Calculated Values)
- B. By Number of Items (Sorted Values)
- C. By Number of Items (Sorted Average)
- D. By Pareto Principle (Sorted and Cumulated %)
正解:A、B
質問 # 16
Which sets of chart types are provided within the Analytics Advanced application?Note: There are 3 correct answers to this question.
- A. Simulation Chart Types
- B. Geographic Chart Types
- C. Trend Chart Types
- D. Seasonal Chart Types
- E. Comparison Chart Types
正解:C、D、E
質問 # 17
Which of the following are functions of SAP IBP for demand?Note: There are 2 correct answers to this question.
- A. Detailed statistical analysis of demand data using predictive analytics tools
- B. Consideration of demand-driven analysis for buffer positioning.
- C. Embedded, on-the-fly demand analytics
- D. Demand sensing of demand data using predictive analytics tools
正解:A、C
質問 # 18
A time profile is defined with these levels: day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?
- A. IF("PERIODID2" ="$$PERIODID2CU$$...)
- B. IF("PERIODID5" ="$$PERIODID5CU$$...)
- C. IF("PERIODID3" ="$$PERIODID3CU$$...)
- D. IF("PERIODID4" ="$$PERIODID4CU$$...)
正解:D
質問 # 19
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note: There are 3 correct answers to this question.
- A. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
- B. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
- C. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
- D. It checks whether the required planning level master data exists for a subset of input key figures.
- E. It checks whether the sourcing in the Production Source Item Master Data type exists.
正解:B、C、D
質問 # 20
Analytics charts are created by the user in the Advanced Analytics application.What can the user do in the Advanced Analytics app?Note: There are 2 correct answers to this question.
- A. Merge charts together.
- B. Open graphics in Excel.
- C. Group data.
- D. Apply filters on your data.
正解:C、D
質問 # 21
Why would you set up a cascading filter in the planning view?Note: There are 2 correct answers to this question.
- A. To filter attributes based on other attribute filters
- B. To filter using attributes that have a large number of values
- C. To filter data in an Application Job template
- D. To filter attributes based on specific values
正解:B、D
質問 # 22
Which of the following are features of the S&OP process templates?Note: There are 2 correct answers to this question.
- A. Each step depicted in the template can have tasks associated with it.
- B. All process templates are assigned to dashboards.
- C. New instances of templates allow for re-use of the same processes.
- D. The S&OP process step can be started with an application job.
正解:A、C
質問 # 23
Which pre-processing steps can be used to cleanse historical sales data before generating a statistical forecast in SAP IBP?Note: There are 2 correct answers to this question.
- A. Bias Detection and Correction in Sales History
- B. Substitute Missing with Mean or Median in Sales History
- C. Promotion Sales Lift Elimination
- D. Intermittency Detection and Correction in Sales History
正解:B、C
質問 # 24
What are the ways to achieve rolling aggregation with SAP IBP?
- A. Using a attribute as a key figure
- B. Using a local member
- C. Using a key figure calculation
- D. Using a appropriate period weight factor
正解:D
質問 # 25
You need to use your resource cost effectively with a certain minimum use, even if it means producing more than demand.Which solutions would apply to this scenario?Note: There are 2 correct answers to this question.
- A. Balance can be achieved between excessive prebuild and minimum use by incorporating violation costs.
- B. Capacity leveling will be possible for production and storage resources.
- C. Excess stock can be generated and will need to be staged in an overflow warehouse.
- D. Minimum capacity utilization will result in pull production occurring.
正解:A、C
質問 # 26
Using the import/export functionality means working with groups of items that are organized into collections.What is the best practice for managing collections?
- A. Configuration items should be bundled in the collections based on the SAP IBP project stream.
- B. You should delete collections after they have been transported.
- C. A planning area with the copy operators assigned must be bundled in one collection.
- D. A planning area with its time profile must be bundled in one collection.
正解:C、D
質問 # 27
How can the SAP IBP scenario modeling functionality support business users in the S&OP planning cycle?Note: There are 2 correct answers to this question.
- A. Simulate demand sensing inputs for Supply Review
- B. Simulate statistical forecast at the Demand Review stage
- C. Model inventory turns based on Target Safety stocks
- D. Simulate heuristics run in Supply Review stage
正解:B、D
質問 # 28
You are developing the functionality and appearance of the Excel UI for SAP IBP business users.Which extensibility capabilities for SAP IBP, add-in for Microsoft Excel are provided by Custom VBA coding?Note: There are 2 correct answers to this question.
- A. Changing the layout of the master data workbooks
- B. SAP IBP ribbon extension
- C. Changing the entries from the Name Manager
- D. Changing the member names
正解:A、B
質問 # 29
......
SAP C_IBP_2302の試験に備えるには、IBPプラットフォームの包括的な理解が必要です。候補者は、IBPモジュール、主要なパフォーマンス指標(KPI)、および関連するデータモデルについて深い理解を持つ必要があります。また、SAPおよび非SAPシステムとのデータマッピング、データ統合、IBPユーザーインターフェースに関する知識も必要です。