質問 # 11
What is the key advantage of canary deployment compared to other zero downtime deployment models?

  • A. It eliminates the need for automated testing
  • B. It ensures that all users experience the new version simultaneously
  • C. It requires no additional infrastructure setup
  • D. It allows for instant rollbacks in case of issues

正解:D


質問 # 12
How does troubleshooting fit into the SRE role? (Select all that apply)

  • A. SREs are responsible for identifying and resolving system issues
  • B. Troubleshooting is not part of the SRE role
  • C. SREs focus solely on writing code and developing new features
  • D. SREs collaborate with other teams to troubleshoot complex problems

正解:A、D


質問 # 13
What does data recovery and restoration planning involve on IBM Cloud?

  • A. Creating multiple copies of the data in different formats
  • B. Storing data in different data centers around the world
  • C. Performing regular backups without any restoration planning
  • D. Documenting procedures to recover data in case of data loss

正解:D


質問 # 14
What are the five tenets of Service Management and Operation as it relates to microservice architecture? (Select all that apply)

  • A. Ensuring observability and monitoring
  • B. Applying chaos engineering for resilience
  • C. Implementing a monolithic architecture
  • D. Designing stateful microservices

正解:A、B


質問 # 15
Which metric is commonly used to measure the availability of a service?

  • A. Uptime percentage
  • B. Memory utilization
  • C. CPU usage percentage
  • D. Disk space usage

正解:A


質問 # 16
What are failure domains in the context of ensuring high availability?

  • A. Physical locations where failures never occur
  • B. Redundant infrastructure used to avoid failure altogether
  • C. Virtual environments that are isolated from the main system
  • D. Logical divisions of an application that are prone to failures

正解:D


質問 # 17
What is the primary difference between blue-green deployment and rolling deployment?

  • A. Blue-green deployment is suitable for small applications, while rolling deployment is ideal for large applications
  • B. Blue-green deployment requires manual intervention, while rolling deployment is fully automated
  • C. Rolling deployment switches traffic between two versions, while blue-green deployment keeps both versions running simultaneously
  • D. Rolling deployment is slower than blue-green deployment in terms of releasing new features

正解:C


質問 # 18
Which type of monitoring focuses on measuring the response time of a service or application?

  • A. White-box monitoring
  • B. Reactive monitoring
  • C. Proactive monitoring
  • D. Black-box monitoring

正解:D


質問 # 19
What is the primary objective of disaster recovery planning?

  • A. To minimize the impact of a disaster on the organization
  • B. To eliminate the need for data replication
  • C. To achieve 100% uptime for all services
  • D. To prevent all types of disasters from occurring

正解:A


質問 # 20
When looking at IBM Cloud Monitoring as a solution, which is a measure of the number of handled requests?

  • A. Throughput
  • B. Durability
  • C. Correctness
  • D. Availability

正解:A


質問 # 21
When is it appropriate to use alerts in monitoring systems?

  • A. Only during business hours
  • B. When a service violates its defined SLO
  • C. Only during planned maintenance windows
  • D. When engineers want to test the alerting system

正解:B


質問 # 22
How does data replication help achieve high availability in various platforms and solutions?

  • A. It reduces the need for data backups
  • B. It ensures data is available in multiple locations simultaneously
  • C. It allows for data recovery from a single location
  • D. It increases the complexity of the system

正解:B


質問 # 23
Which of the following represents the five tenets of Service Management and Operation in a microservice architecture?

  • A. Availability, Redundancy, Scalability, Performance, Security
  • B. Scalability, Performance, Load Balancing, Reliability, Security
  • C. Scalability, Availability, Manageability, Security, Observability
  • D. Observability, Resilience, Agility, Manageability, Performance

正解:D


質問 # 24
What are post-incident review concepts? (Select all that apply)

  • A. Identifying action items and follow-up tasks
  • B. Documenting the incident response process
  • C. Holding individuals accountable for incidents
  • D. Reviewing the incident's impact on SLAs

正解:A、B、D


質問 # 25
What is the primary goal of SREs in monitoring security issues?

  • A. To generate false positives to test the security monitoring system
  • B. To escalate all security incidents to the security team without investigation
  • C. To detect security threats and vulnerabilities before they impact the system
  • D. To focus only on the performance and availability of the system

正解:C


質問 # 26
......

認定トレーニングはC1000-169試験問題集テストエンジン:https://jp.fast2test.com/C1000-169-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어