LEED-AP-O-M認定ガイドPDFは100%カバー率でリアル試験問題が使える [Q40-Q61]

Share

LEED-AP-O-M認定ガイドPDFは100%カバー率でリアル試験問題が使える

合格させるLEED-AP-O-M試験にはリアル問題解答

質問 # 40
What public health risk must be balanced with water efficiency and chemical usage in every water treatment program?

  • A. Iron poisoning
  • B. Legionella outbreak
  • C. Botulism
  • D. Mold growth

正解:B

解説:
Legionella outbreak is a significant public health risk that must be balanced with water efficiency and chemical usage in every water treatment program. Legionella bacteria can grow in water systems, particularly in warm, stagnant water. If not properly managed, it can lead to Legionnaires' disease, a severe form of pneumonia. Therefore, while striving for water efficiency and minimizing chemical usage, it's crucial to ensure that the conditions do not favor the growth of Legionella.
References: LEED AP Operations + Maintenance (LEED AP O+M) V4.1 by usgbc.org1.


質問 # 41
Which of the following standards is applicable in order to comply with Indoor Environmental Quality Credit, Thermal Comfort?

  • A. SCAQMD Rule #1113
  • B. ASHRAE 52.2-2007
  • C. ASHRAE 55-2010
  • D. SCAQMD Rule #1168

正解:C

解説:
ASHRAE 55-2010 is the standard applicable for compliance with the Indoor Environmental Quality Credit, Thermal Comfort. This standard outlines the conditions for acceptable thermal environments and is used for the design, evaluation, and operation of buildings to meet thermal comfort requirements.
References: The LEED v4.1 O+M reference guide specifies that ASHRAE 55-2010 is the standard for thermal comfort, focusing on ensuring quality thermal environments conducive to occupants' comfort and well-being1.


質問 # 42
Which refrigerant was phased out due to the Montreal Protocol?

  • A. HFC-134a
  • B. HCFC-22
  • C. HCFC-123
  • D. CFC-11

正解:D

解説:
CFC-11 was phased out due to the Montreal Protocol because it is a chlorofluorocarbon (CFC) that contributes to ozone depletion. The protocol aimed to phase out substances with high ozone-depleting potential (ODP).
References: The Montreal Protocol on Substances that Deplete the Ozone Layer is a global agreement that regulates the production and consumption of nearly 100 man-made chemicals referred to as ozone-depleting substances (ODS), including CFCs1.


質問 # 43
Who is the best person to serve as the Indoor Environmental Quality Manager to successfully implement Indoor Environmental Quality Credit, Indoor Environmental Quality Management Program?

  • A. The LEED AP
  • B. A general contractor
  • C. A commissioning (Cx) agent
  • D. The building engineer

正解:D

解説:
The building engineer is ideally positioned to serve as the Indoor Environmental Quality Manager for implementing the Indoor Environmental Quality Credit, Indoor Environmental Quality Management Program.
Their expertise in building systems and operations ensures that indoor environmental quality strategies are effectively integrated into the building's daily maintenance and operation procedures, enhancing the well-being of occupants.
References:The role and responsibilities of the Indoor Environmental Quality Manager in implementing the Indoor Environmental Quality Management Program are detailed in the LEED AP Operations + Maintenance reference materials. These resources underline the importance of having a dedicated professional, like a building engineer, oversee indoor environmental quality initiatives.


質問 # 44
What credit or prerequisite requires a plan for a hazardous spill cleanup?

  • A. Materials and Resources Credit, Solid Waste Management - Ongoing
  • B. Indoor Environmental Quality Prerequisite, Green Cleaning Policy
  • C. Indoor Environmental Quality Credit, Indoor Environmental Quality Management Program
  • D. Indoor Environmental Quality Credit, Enhanced Indoor Environmental Quality Strategies

正解:B

解説:
The Indoor Environmental Quality Prerequisite, Green Cleaning Policy, requires a plan for hazardous spill cleanup. This prerequisite focuses on reducing the exposure of building occupants and maintenance personnel to potentially hazardous chemical, biological, and particulate contaminants, which adversely affect air quality, human health, building finishes, building systems, and the environment. A well-defined spill cleanup plan is crucial for maintaining a safe and healthy indoor environment.References:LEED AP Operations + Maintenance Reference Guide, Indoor Environmental Quality section.


質問 # 45
Which of the following strategies reduces the impact of materials used in building operation and maintenance on indoor air quality?

  • A. Install VOC sensors
  • B. Use products with low emissions
  • C. Comply with ASHRAE 55-2010
  • D. Document all emissions

正解:B

解説:
The use of products with low emissions is a strategy that reduces the impact of materials used in building operation and maintenance on indoor air quality. These products, which include paints, adhesives, furniture, and flooring, emit fewer volatile organic compounds (VOCs) and other harmful substances into the indoor environment, thereby improving indoor air quality.
References: LEED v4: Building Operations + Maintenance Guide, LEED v4 | U.S. Green Building Council, Improving Indoor Air Quality | US EPA, Sustainable O&M Practices | WBDG - Whole Building Design Guide


質問 # 46
A LEED project is considering converting 75% of its existing composite roof to a vegetated roof. The project's landscape architect also suggests an open-grid pavement system for 30% of the site paving, and colored concrete for 25% of the site paving. Which of the following factors must be considered when selecting the materials for these strategies?

  • A. The SRI of the vegetated roof system, and the unbound percentage of the open-grid pavement system
  • B. The Solar Reflectance Index (SRI) of the colored concrete, and the unbound percentage of the open-grid pavement system
  • C. The SRI of the vegetated roof system, and the SRI of the colored concrete
  • D. The SRI of the colored concrete, and the SRI of the open-grid pavement system

正解:B

解説:
This answer is correct because these are the two factors that affect the heat island reduction potential of the materials. The SRI is a measure of how well a material reflects solar radiation and stays cool in the sun. The higher the SRI, the lower the surface temperature and the less heat absorbed by the material. The unbound percentage of the open-grid pavement system is the ratio of the area that is not covered by the paving material to the total area of the system. The higher the unbound percentage, the more permeable the system and the more water infiltration and evaporation, which also reduce the surface temperature. The vegetated roof system does not need to have a specific SRI value, as long as it uses native or adapted plant species that provide shade and evapotranspiration. The open-grid pavement system does not need to have a specific SRI value, as long as it has at least 50% unbound area.
References: =LEED v4.1 OPERATIONS AND MAINTENANCE - WAP Sustainability Consulting, page
26;SpecTopics: Heat Island Reduction Credit and LEED V4/V4.1 - Carlisle SynTec;LEED AP O+M - Heat Island Reduction - GBES


質問 # 47
The maximum number of points in the Innovation Category that can be achieved by exemplary performance is

  • A. four points
  • B. two points
  • C. one point
  • D. three points

正解:B

解説:
The maximum number of points that can be achieved by exemplary performance in the Innovation Category is two points. This is clarified by the LEED documentation, which outlines the combinations of points available for innovation and exemplary performance. Projects can select to achieve a combination of innovation and exemplary performance points, with a maximum of two points for exemplary performance. Therefore, the correct answer is "B: two points."


質問 # 48
When developing a transportation survey, a LEED AP must make certain that the survey instrument collects information

  • A. from non-consecutive days over a calendar month
  • B. from the morning and evening commute only
  • C. on every mode of transportation in a multi-mode daily commute
  • D. in a consistent manner from all respondents

正解:D

解説:
When developing a transportation survey, it is crucial that the survey instrument collects information in a consistent manner from all respondents. This ensures that the data collected is reliable and can be accurately analyzed to inform decisions about transportation strategies. Collecting data consistently allows for a fair comparison of responses and helps to identify trends or patterns in the data.
References: LEED v4: Building Operations + Maintenance Guide1, LEED v4.1 OPERATIONS AND MAINTENANCE - WAP Sustainability Consulting


質問 # 49
In densely populated rooms, CO2 monitors must be located a minimum of how many feet (meters) above the floor?

  • A. 4 ft. (1.2 m)
  • B. 5 ft. (1.5 m)
  • C. 3 ft. (0.9 m)
  • D. 2 ft. (0.6 m)

正解:A

解説:
In densely populated rooms, CO2 monitors must be located a minimum of 4 feet (1.2 meters) above the floor.
This is to ensure that the monitors are able to accurately measurethe CO2 levels in the breathing zone of the occupants, which can help in maintaining good indoor air quality.
References: LEED v4: Building Operations + Maintenance Guide, LEED certification for existing buildings and spaces.
In rooms that are densely populated, CO2 monitors must be located a minimum of 4 feet (1.2 meters) above the floor. This placement ensures that the monitors can accurately measure the concentration of CO2 in the breathing zone of the occupants, providing reliable data that can be used to assess and control indoor air quality. Proper placement of CO2 monitors is critical for effective ventilation and for maintaining a healthy indoor environment, especially in areas with high occupancy where CO2 levels can rise quickly and impact comfort and well-being.


質問 # 50
What type of Credential does the principal participant of a project need to earn in order to achieve one point in the innovation credit?

  • A. LEED Fellow
  • B. LEED Accredited Professional (AP) with a specialty appropriate for the project
  • C. LEED Green Rater
  • D. LEED Green Associate

正解:B

解説:
The LEED AP with a specialty credential signifies advanced knowledge in green building and a specific LEED rating system. This credential is required for a principal participant of a project to earn one point in the innovation credit. The specialty should be appropriate for the project, indicating that the professional has the necessary expertise to contribute to the LEED certification process of the project12.
References:
* LEED AP with specialty | U.S. Green Building Council
* LEED O+M Certification & Credentials | Existing Buildings | GBES
Earning an innovation credit in LEED requires demonstrating exceptional performance or innovative strategies. Having a principal participant who is a LEED AP with a specialty appropriate for the project shows advanced knowledge in green building practices tailored to the project's specific needs, contributing to innovative approaches and sustainability goals. This credential demonstrates the individual's commitment and expertise in LEED and sustainable building practices, aligning with the innovation credit's intent.References:The innovation credit's criteria are detailed in the LEED O+M Reference Guide, which emphasizes the value of specialized knowledge in advancing sustainability goals and innovative practices within the LEED framework.


質問 # 51
What is the required frequency for conducting a waste stream audit in maintaining a high-performing solid waste management program?

  • A. Twice a year
  • B. At least once every three years
  • C. Annually
  • D. At least once every five years

正解:C

解説:
The required frequency for conducting a waste stream audit in maintaining a high-performing solid waste management program is annually. Regular annual audits help in evaluating the effectiveness of waste management strategies, identifying areas for improvement, and ensuring continued progress towards waste reduction and sustainability goals.References:LEED Operations and Maintenance Reference Guide, Materials and Resources section.


質問 # 52
Which of the following strategies is most important for achieving economic and environmental performance in a LEED project?

  • A. Perform a full life-cycle assessment
  • B. Retain a LEED AP
  • C. Bring the project team together in the performance phase
  • D. Take an integrative approach

正解:D

解説:
An integrative approach is most important for achieving economic and environmental performance in a LEED project. This strategy involves collaboration among all stakeholders from the project's inception through its operation, ensuring that sustainability goals are woven into every aspect of the project.
References: The integrative process is a fundamental principle of LEED, emphasizing the importance of early and continuous collaboration for sustainable design and construction.It is highlighted in the LEED v4 guidelines as a key to achieving high performance in both economic and environmental aspects1234.
The most important strategy for achieving economic and environmental performance in a LEED project is to take an integrative approach. This approach involves collaborative, multidisciplinary teamwork from the project's inception through its operation. It emphasizes the importance of considering all aspects of building design, construction, and operation holistically to achieve sustainability goals effectively and efficiently.


質問 # 53
At a minimum, which two factors must be continuously monitored by the system in order to achieveIndoor Environmental Quality Credit, Thermal Comfort?

  • A. Air speed and air temperature
  • B. Radiant temperature and air speed
  • C. Humidity and air temperature
  • D. Air speed and humidity

正解:C

解説:
For the Indoor Environmental Quality Credit, Thermal Comfort, the system must continuously monitor both humidity and air temperature. These two factors are crucial for maintaining thermal comfort within the building environment.
References: The LEED v4.1 O+M reference materials specify the importance of monitoring humidity and air temperature as part of the requirements for achieving the Thermal Comfort credit12.
To achieve the Indoor Environmental Quality Credit, Thermal Comfort, the system must continuously monitor at least two key factors: humidity and air temperature. These factors are critical for maintaining thermal comfort within a building, as they directly affect the perceived comfort levels of the occupants. Proper monitoring and management of humidity and air temperature ensure that the indoor environment remains within comfortable ranges for occupants, contributing to their well-being and productivity.
References:This requirement is specified in the LEED AP Operations + Maintenance reference guide within the section on Indoor Environmental Quality Credit, Thermal Comfort. The guide emphasizes the importance of maintaining optimal levels of humidity and air temperature for achieving thermal comfort in indoor spaces.


質問 # 54
Which of the following is a feature of the ENERGY STAR Portfolio Manager?

  • A. Requires input of 36 months of data
  • B. Requires California Title 24 compliance
  • C. Requires calculation and input of site energy usage
  • D. Requires ISO 14001 compliance

正解:C


質問 # 55
In order to earn Indoor Environmental Quality Credit, Green Cleaning - Custodial Effectiveness Assessment, what is the highest APPA Leadership in Educational Facilities' Custodial Staffing Guidelines score a facility may achieve?

  • A. A score of 7
  • B. A score of 9
  • C. A score of 5.5
  • D. A score of 2.5

正解:D

解説:
This answer is correct because the APPA Leadership in Educational Facilities' Custodial Staffing Guidelines score is a measure of the level of cleanliness achieved by the custodial staff, based on a visual inspection of various types of spaces. The score ranges from 1 to 5, with 1 being the highest level of cleanliness and 5 being the lowest.A score of 2.5 corresponds to the APPA Level 2, which is the minimum level of cleanliness required by the Indoor Environmental Quality Credit, Green Cleaning - Custodial Effectiveness Assessment1.
The other options are incorrect because they either exceed the maximum score of 5 or do not meet the minimum level of cleanliness for the credit.
References: =LEED v4.1 OPERATIONS AND MAINTENANCE - WAP Sustainability Consulting, page
46;Operational Guidelines for Educational Facilities - Custodial - APPA, page 38;Custodial Staffing Guidelines for Educational Facilities, Second ... - ERIC, page 5.


質問 # 56
A building is installing outdoor light fixtures that will directly emit light into the night sky. What is the minimum lamp lumens of the fixtures that must be partially or fully shielded to achieve a point for Sustainable Sites Credit, Light Pollution Reduction?

  • A. 650 lumens
  • B. 550 lumens
  • C. 2,500 lumens
  • D. 1,500 lumens

正解:D

解説:
For the Sustainable Sites Credit, Light Pollution Reduction, fixtures with a minimum of 1,500 lumens must be partially or fully shielded. This requirement helps to minimize light trespass and sky glow, contributing to the reduction of light pollution.
References: The LEED v4.1 O+M reference guide specifies the need for shielding on outdoor light fixtures to control light pollution.The threshold for lumens is set to ensure that lighting is designed to conserve the night sky1.
For the Sustainable Sites Credit, Light Pollution Reduction, outdoor light fixtures that directly emit light into the night sky and have a minimum lamp lumens exceeding 1,500 must be partially or fully shielded. This requirement is aimed at reducing light pollution by ensuring that outdoor lighting fixtures are designed and installed in a manner that minimizes sky glow and light trespass, thereby preserving the natural night environment.


質問 # 57
What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

  • A. Compile meter data into daily and weekly summaries
  • B. Use Labs21 Energy Benchmarking tool to calculate minimum energy performance
  • C. Establish an ENERGY STAR Portfolio Manager profile
  • D. Benchmark building site energy data of at least three similar buildings

正解:C

解説:
For the Energy and Atmosphere Prerequisite, Minimum Energy Performance, the project team must establish an ENERGY STAR Portfolio Manager profile. This is a requirement for all building types to benchmark energy performance and track improvements over time.
References: The LEED v4.1 reference materials outline the necessity of establishing an ENERGY STAR Portfolio Manager profile as part of the prerequisite for Minimum Energy Performance123.
Regardless of the building type, for the Energy and Atmosphere Prerequisite, Minimum Energy Performance, the project team must establish an ENERGY STAR Portfolio Manager profile. This platform is used to benchmark the building's energy performance against similar buildings and track energy consumption over time. The ENERGY STAR Portfolio Manager is a critical tool for understanding and improving a building's energy efficiency, serving as a standardized framework for measuring and reporting energy use.
References:This requirement is highlighted in the LEED AP Operations + Maintenance reference guide, particularly in the section covering the Energy and Atmosphere Prerequisite, Minimum Energy Performance.
The guide outlines the steps for setting up an ENERGY STAR Portfolio Manager profile and its importance in the LEED certification process.


質問 # 58
Which of the following environmental concerns is exacerbated by impervious surfaces?

  • A. Indoor Environmental Quality decreases
  • B. Retention pond diminishment
  • C. Contaminated runoff harming aquatic life
  • D. Increase in light pollution

正解:C

解説:
Impervious surfaces exacerbate the environmental concern of contaminated runoff harming aquatic life. These surfaces prevent rainwater from soaking into the ground, leading to increased runoff that can carry pollutants into water bodies, negatively affecting aquatic ecosystems.
References: Impervious surfaces are known to alter natural hydrology, leading to increased runoff and potential contamination of water bodies, which can harm aquatic life123.


質問 # 59
What is the diversion percentage of ongoing consumables in order to achieve exemplary performance as specified in Materials and Resources Credit, Solid Waste Management - Ongoing?

  • A. 85%
  • B. 50%
  • C. 75%
  • D. 90%

正解:D

解説:
To achieve exemplary performance in the Materials and Resources Credit, Solid Waste Management - Ongoing, a diversion percentage of 90% for ongoing consumables is required. This high level of diversion demonstrates an advanced commitment to reducing waste and promoting recycling and composting. By diverting 90% of ongoing consumables from the landfill, projects significantly contribute to sustainability goals by minimizing their environmental footprint related to waste.
References:The LEED AP Operations + Maintenance reference guide specifies the criteria for exemplary performance in waste management, including the 90% diversion target. This ambitious goal underscores the importance of comprehensive waste reduction strategies in LEED-certified projects.


質問 # 60
What is the maximum number of points possible for the Exemplary Performance option of the Innovation Credit, Innovation?
Calculator

  • A. 1 point
  • B. 4 points
  • C. 2 points
  • D. 3 points

正解:C

解説:
The maximum number of points possible for the Exemplary Performance option of the Innovation Credit, Innovation in LEED AP O+M v4.1 is 2 points. This is part of the overall potential to earn up to 5 points in the Innovation category, which can include pilot credits, innovation credits, and exemplary performance credits.
References: The LEED credit library and other resources provide information on the point distribution for various credits within the LEED system, including the Innovation Credit, Innovation1.
For the Exemplary Performance option of the Innovation Credit, Innovation, the maximum number of points possible is two. This option is designed to recognize and incentivize projects that achieve performance levels significantly beyond the prerequisite standard or credit requirements in the LEED rating system.


質問 # 61
......

100%無料LEED-AP-O-M日常練習試験には167問があります:https://jp.fast2test.com/LEED-AP-O-M-premium-file.html

合格させるLEED-AP-O-Mレビューガイド、信頼され続けるLEED-AP-O-Mテストエンジン:https://drive.google.com/open?id=1SpK2-Rw4sUggx1TeLnBylUr2KmUkHYH4


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어