質問 # 29
A customer has purchased a FlashArray//XL. What power cables are required in order to connect this array to rack PDUs?

  • A. 4 x C13/14
  • B. 2 x C13/14
  • C. 4 x C19/20

正解:A

解説:
FlashArray//XL arrays require four power cables with C19 (receptacle) to C20 (plug) connectors to connect properly to rack PDUs, supporting redundant power supplies and higher power demands.


質問 # 30
What slot does a PCIe SAS card need to be installed in a FlashArray//XR2/3?

  • A. 0
  • B. 1
  • C. 2

正解:A

解説:
In FlashArray//XR2 and //XR3 models, the PCIe slot 2 is designated for the installation of a 4-port SAS card. This configuration is essential for connecting to SAS expansion shelves, ensuring proper data path redundancy and performance.


質問 # 31
Before leaving the site after an install, who is required to provide completion sign-off?

  • A. Account team
  • B. Support
  • C. Customer

正解:C

解説:
The customer's completion sign-off is required to confirm that the installation meets their expectations and requirements before the engineer leaves the site.


質問 # 32
Upon completion of a hardware upgrade activity, which command should be used to unset the maintenance tag?

  • A. purealert tag --cancel
  • B. purealert --unset
  • C. purealert untag --maintenance

正解:C

解説:
The command purealert untag --maintenance removes the maintenance tag after a hardware upgrade, signaling the system that maintenance mode has ended.


質問 # 33
After running puredb run giveback --safe command once CT0 has been upgraded, how long should the Implementation Engineer wait before continuing with the controller upgrade?

  • A. 10 minutes
  • B. 3 minutes
  • C. 5 minutes

正解:A

解説:
Waiting 10 minutes after running puredb run giveback --safe ensures the system completes safe resource rebalancing and stabilizes before proceeding with the next controller upgrade step.


質問 # 34
An Implementation Engineer is scheduled to install a FlashArray and a DirectFlash Shelf (DFS).
What action should the Implementation Engineer perform?

  • A. Refer to the "Recommended DFS Versions for Purity Releases" KB and upgrade Purity on the FlashArray and DFS.
  • B. Only upgrade the Purity on the FlashArray and then attach the DFS.
  • C. Install the Array and DFS with the Purity that shipped and have Support upgrade remotely.

正解:A

解説:
To ensure compatibility and optimal performance, the Implementation Engineer should consult the recommended DFS versions for the installed Purity release and upgrade both the FlashArray and DirectFlash Shelf accordingly.


質問 # 35
Which Purity command can be used to validate I/O is balanced across initiators?

  • A. purehost list --balance
  • B. purehost monitor --balance
  • C. purehost iobalance --check

正解:C

解説:
The purehost iobalance --check command validates whether I/O is balanced evenly across initiators, helping ensure optimal performance and distribution.


質問 # 36
A customer would like to consolidate their SAS shelves and wants to evacuate multiple shelves in parallel. What is a prerequisite for this procedure?

  • A. The array usage percentage must be lower than 60%
  • B. Purity must be upgraded to 6.x
  • C. The array chassis must be fully populated with modules.

正解:A

解説:
To evacuate multiple shelves in parallel safely during consolidation, the array's usage must be sufficiently low (under 60%) to ensure enough free capacity for data movement.


質問 # 37
A customer has filled out the Installation Workbook. The management IP information netmask is specified as "255.255.255.223" and the gateway is specified as "10.24.18.1". What corrective action should be taken to reconcile the IP configuration?

  • A. The netmask value should be changed to /23.
  • B. The gateway information should be changed to 10.24.18.223.
  • C. The netmask value should be changed to 255.255.255.0.

正解:C

解説:
The provided netmask "255.255.255.223" is invalid. Changing it to the standard subnet mask "255.255.255.0" aligns correctly with the gateway "10.24.18.1" for proper network configuration.


質問 # 38
A FlashArray arrives with Purity 5.3.8 applied out of the factory. The account team requests that the array configured with Purity 6.1.21. Which steps should the Implementation Engineer select to meet this requirement?

  • A. Create a bootable USB stick from the 6.1.21 ISO file and reimage both controllers with it.
  • B. Copy the PPKG and SHA1 files to a USB stick and upgrade the controllers.
  • C. Configure the array with the current code and then open a case with Support to upgrade.

正解:A

解説:
To upgrade from Purity 5.3.8 to 6.1.21 on a new array, the Implementation Engineer should create a bootable USB installer from the target ISO and reimage both controllers to ensure a clean and supported upgrade.


質問 # 39
What is the rack unit height of a FlashArray//XR2/3?

  • A. 0
  • B. 1
  • C. 2

正解:C

解説:
The FlashArray//XR2 and //XR3 models each occupy 3 rack units (RU) in height. This is specified in the FlashArray//XR2 and //XR3 Site Planning Guide, which outlines the physical requirements for rack space, clearance, and weight for these models.


質問 # 40
What is the speed of the Ethernet ports to connect a FlashArray //E to a DFS?

  • A. 100G
  • B. 40G
  • C. 25G

正解:C

解説:
FlashArray//E models utilize 25Gb Ethernet (25G) ports for connecting to DirectFlash Shelves (DFS). These 25G ports are designed to handle the high throughput demands of DFS, providing efficient data transfer between the storage array and expansion shelves. This configuration ensures optimal performance and scalability for FlashArray//E systems.


質問 # 41
What is the rack unit height of a FlashArray//XL?

  • A. 0
  • B. 1
  • C. 2

正解:B

解説:
The FlashArray//XL models are designed to fit into a 5U rack space, which is equivalent to 5 rack units. Each rack unit (U) is 1.75 inches in height, so a 5U chassis would be 8.75 inches tall. However, the FlashArray//XL chassis is designed to be 5U in height, providing a compact and efficient form factor for enterprise storage needs.


質問 # 42
An Implementation Engineer is onsite to add two 4-port FC cards to a FlashArray//X20R3. In what state should the controller be in before performing the card add procedure?

  • A. Primary
  • B. Secondary
  • C. Standby

正解:B

解説:
The controller should be in the Secondary state before adding FC cards to ensure the primary controller remains operational and the procedure can be performed safely without disrupting services.


質問 # 43
A dark site customer requests an evacuation of SH01 on a FlashArray/M50. What is an appropriate next step?

  • A. Ensure that usable capacity is less than 90%.
  • B. Ensure that usable capacity is less than 80%.
  • C. Use the evac_checks script.

正解:B

解説:
Before evacuating a shelf on a FlashArray/M50, usable capacity should be below 80% to provide enough free space for safe data migration.


質問 # 44
If a Technical Support Engineer (TSE) is not available to perform health checks after an installation, what action should the Implementation Engineer take?

  • A. Email the account team
  • B. Update and close the case.
  • C. Verify that Remote Assist (RA) is open and update the case.

正解:C

解説:
Ensuring Remote Assist is enabled allows Support to perform remote health checks, and updating the case keeps all parties informed for follow-up.


質問 # 45
For FlashArray//XL, which 2 PCIe slots should be used for DFS connectivity?

  • A. 0 and 4
  • B. 0 and 6
  • C. 1 and 7

正解:B

解説:
On FlashArray//XL, PCIe slots 0 and 6 are designated for DirectFlash Shelf (DFS) connectivity to optimize data throughput and redundancy.


質問 # 46
What should an Implementation Engineer do when installing rails in a threaded-hole rack?

  • A. Use the positioning studs
  • B. Make an adjustment to the rack
  • C. Install the rails as is

正解:A

解説:
Positioning studs are used to align and secure the rails correctly in a threaded-hole rack, ensuring proper installation and stability of the FlashArray.


質問 # 47
In a situation where FC cards need to be re-used during a controller upgrade, which is a valid transfer path?

  • A. M > XR2/3
  • B. XR2 > XR3
  • C. M > XR2

正解:A

解説:
FC cards from an M-series array can be reused in XR2 or XR3 controllers, allowing hardware continuity during controller upgrades.


質問 # 48
An Implementation Engineer is performing a capacity consolidation on an X50R3.
Which command is needed for the engineer to determine whether the customer's FlashArray supports SAS Flash Modules?

  • A. purehw list --type controller --all
  • B. purehw list --type drive --all
  • C. puredrive list --total --type controller

正解:B

解説:
This command reports every installed drive module, identifying SAS Flash Modules if present, whereas the other commands do not enumerate individual drive types.


質問 # 49
When should a FlashArray support case be opened?

  • A. Once install is completed
  • B. Before starting install
  • C. Once an issue arises

正解:B

解説:
Opening a support case before starting the installation ensures timely assistance and coordination with support throughout the deployment process.


質問 # 50
......


Pure Storage FlashArray-Implementation-Specialist 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Installation: This section of the exam measures the skills of Enterprise Infrastructure Technicians and focuses on executing a successful installation of FlashArray systems. It tests the ability to perform physical setup, cabling, configuration of network settings, and the application of initial system configurations necessary for full deployment.
トピック 2
  • Upgrades: This section of the exam measures the skills of FlashArray Implementation Specialists and focuses on tasks involved in managing firmware and software upgrades. Candidates must demonstrate knowledge of upgrade planning, verification steps, and rollback procedures, ensuring that systems are updated with minimal disruption to service.
トピック 3
  • Pre-Installation
  • Upgrade: This section of the exam measures the skills of Enterprise Infrastructure Technicians and covers all preparation activities before deploying or upgrading a Pure Storage FlashArray. It includes understanding environmental requirements, verifying prerequisites, checking compatibility, and validating system readiness through appropriate tools and documentation.
トピック 4
  • Post-Installation
  • Upgrade: This section of the exam measures the skills of FlashArray Implementation Specialists and evaluates how professionals confirm system functionality after installation or an upgrade. It involves validating connectivity, running health checks, confirming configurations, and ensuring that the deployment meets operational expectations.

 

FlashArray-Implementation-Specialist問題集には100%厳密検証された問題と解答で合格保証付きもしくは全額返金:https://jp.fast2test.com/FlashArray-Implementation-Specialist-premium-file.html

最新FlashArray-Implementation-SpecialistPDF問題集リアル無料テスト本日更新です:https://drive.google.com/open?id=1FjmmlLvP0WHWJH6jtNJnCaEa80Cx6dW-


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어