E_S4HCON2022 PDFで合格させるスゴ問題集でE_S4HCON2022最新のリアル試験問題 [Q15-Q39]

Share

E_S4HCON2022 PDFで合格させるスゴ問題集でE_S4HCON2022最新のリアル試験問題

有効なE_S4HCON2022テスト解答E_S4HCON2022試験PDF問題を試そう

質問 15
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:

  • A. Conversion of application tables (PARCONVJJPG)
  • B. Switch to new repository (EU_SWITCH)
  • C. Modification adjustment (SPDD)
  • D. Activation of dictionary objects (ACT_UPG)

正解: C,D

 

質問 16
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
There is correct answers to this question.
Response:

  • A. Check the dump size of the database export on disk
  • B. Check the log files written under "SUM\abap\log"
  • C. Check logs for jobs starting with "RSUPG_SGEN" in the system
  • D. Check the "Charts Control Center" in the SUM UI

正解: B,D

 

質問 17
During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?

  • A. SUM continues with the next phase and your modifications are kept as In the start release
  • B. SUM continues with the next phase and your modifications are lost
  • C. Before continuing with the next phase SUM asks for a modification adjustment transport
  • D. SUM refuses to continue unless you have marked a transport request as modification adjustment transport

正解: A

 

質問 18
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

  • A. Unicode conversion SAP S/4HANA conversion without database migration Database migration
  • B. SAP S/4HANA conversion including database migration and Unicode conversion
  • C. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration
  • D. Unicode conversion SAP S/4HANA conversion including database migration
  • E. Unicode conversion Database migration SAP S/4HANA conversion without database migration

正解: C,D,E

 

質問 19
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:

  • A. It contains a troubleshooting section
  • B. It is target release specific
  • C. It contains a section "free space requirements"
  • D. It is a database-specific document

正解: B,C

 

質問 20
You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question

  • A. PARDIST_SHD
  • B. TABIM_SHADOW_*
  • C. PARMVNT_UPG
  • D. TABIMJJPG

正解: D

 

質問 21
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?

  • A. A Standalone SAP system with ABAP 7.51 or above
  • B. An SAP S4HANA 1709 sandbox system
  • C. AA

正解: A,B

 

質問 22
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
Please choose the correct answer.
Response:

  • A. It performs a comparison on selected tables using check sum.
  • B. It does NOT perform any table comparison.
  • C. It performs a comparison of all tables using check sum.
  • D. It performs a comparison on all tables using row counts.

正解: D

 

質問 23
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:

  • A. SWPM using the Backup / Restore procedure
  • B. SUM without DMO
  • C. SWPM using the Load procedure
  • D. SUM with DMO

正解: C

 

質問 24
You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.

  • A. Conversion
  • B. Main import
  • C. Software update
  • D. Migration

正解: A,D

 

質問 25
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?

  • A. EU_CLONE_MIG_DT_CREATE
  • B. EU_CLONE_MIG_DT_RUN
  • C. EU_IMPORT_ALL
  • D. EU_CLONE_MIG_SOT_RUN

正解: B

 

質問 26
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:

  • A. Phases EU_IMPORT*
  • B. Phase RUN_RSDBSCPY
  • C. Phases DIFF*
  • D. Phase RUN_RSPTBFIL _ISUTABU
  • E. Phase DOWNCONF_DTTRANS

正解: A,C,E

 

質問 27
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:

  • A. Run the database migration to the SAP HANA database
  • B. Apply the recommendations of the simplification list
  • C. Check the compatibility of custom code with SAP S/4HANA
  • D. Perform the migration of data into the new data structure

正解: B,C

 

質問 28
You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?
Please choose the correct answer.

  • A. Credentials of a named user in client 000 of the shadow system
  • B. Credentials of user DDIC in the development client of the development system
  • C. Credentials of a named user in the development client of the development system
  • D. Credentials of user DDIC in client 000 of the shadow system

正解: C

 

質問 29
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.

  • A. The target database size increases temporarily because of the Shadow Repository.
  • B. The source system is non-Unicode and the target database is a scale-out system.
  • C. Network capacity between exporting and importing R3load processes must be.
  • D. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • E. SAP HANA Landscape Reorganization required a manual step to edit a file.

正解: D,E

 

質問 30
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.

  • A. Prerequisite check
  • B. SAP S/4HANA conversion including DMO
  • C. Benchmark tool
  • D. DMO without system update
  • E. SAP S/4HANA conversion without DMO

正解: A,B,E

 

質問 31
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

正解: B

 

質問 32
ICNV initialization does 3

  • A. Build index on flag column
  • B. Creation of views
  • C. Creation of flag
  • D. AA

正解: A,B,C

 

質問 33
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:

  • A. Activate the required business functions manually in the production system.
  • B. Import a transport request from the development system that contains the recording of the activation.
  • C. During conversion, SUM delivers some business functions already activated.
  • D. Specify the business functions that need to be switched on during the prepare part of SUM.

正解: B,C

 

質問 34
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?
There are 2 correct answers to this question.
Response:

  • A. Check for running R31oad processes on the host of the primary application server
  • B. Check for running batch jobs in the shadow system via Job Overview (SM37)
  • C. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
  • D. Check for running R3trans processes on the host of the primary application server

正解: C,D

 

質問 35
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:

  • A. Delete client 066 (Early Watch Client)
  • B. Uninstall industry extensions not supported by SAP S/4HANA
  • C. Uninstall Fiori apps not released for SAP_UI 7.50
  • D. Install add-on SAP Gateway 7.50

正解: A,C

 

質問 36
What is the benefit of using the file UPGANA.XML from a previous SUM run?
Please choose the correct answer.
Response:

  • A. To make the progress information within SUM UI more accurate
  • B. To repeat specific phases during the SUM run
  • C. To auto-fill specific fields on selected screens on the SUM UI
  • D. To skip selected phases during the SUM run

正解: A

 

質問 37
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:

  • A. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
  • B. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
  • C. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
  • D. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.

正解: C

 

質問 38
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:

  • A. At the end of the downtime
  • B. As part of the cleanup process
  • C. Early in the downtime
  • D. Before the downtime starts

正解: D

 

質問 39
......

E_S4HCON2022問題集はあなたの合格を必ず保証します:https://jp.fast2test.com/E_S4HCON2022-premium-file.html

E_S4HCON2022テスト問題集とオンライン試験エンジン:https://drive.google.com/open?id=1ZTPRpHKbjTNEtU8pmHNuKQyLP4arNKkK


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어