質問 # 25
What is a key benefit of utilizing PowerSwitch in the planning phase of a network design project?
Response:

  • A. It helps in optimizing switch configurations and performance
  • B. It monitors traffic patterns in real time
  • C. It automates the deployment of security patches
  • D. It reduces the number of network devices needed

正解:A


質問 # 26
What are two roles of the accounts team on a network project?
Response:

  • A. The account technical sales representative works with the customer to prepare high-level design.
  • B. The account executive is the leader of the accounts team.
  • C. Network sales representative prepares a high-level network design.
  • D. An inside sales representative prepares high-level network design.

正解:B、C


質問 # 27
In which phase of networking design is the EPS tool most useful?
Response:

  • A. During the testing phase to verify performance metrics
  • B. During the deployment phase when devices are being installed
  • C. During the scoping phase when identifying business needs
  • D. During the planning phase to estimate environmental and power requirements

正解:D


質問 # 28
A project design requires documenting FCoE for an MX7000 chassis. What section should be used for defining the FCoE feature enablement on server NIC card?
Response:

  • A. Server Profiles
  • B. SmartFabric
  • C. Chassis Sleds
  • D. NPAR

正解:D


質問 # 29
The scoping phase is primarily focused on defining __________, deliverables, and requirements to ensure alignment with business goals.
Response:

  • A. Hardware specifications
  • B. Network configurations
  • C. Performance metrics
  • D. Project scope

正解:D


質問 # 30
A Design Architect is coordinating with a sales team to provide an example of the networking capabilities of a PowerEdge MX7000 for a customer. Which networking resource meets this requirement?
Response:

  • A. GNS3
  • B. Demo Center
  • C. VMware Hands-on Labs
  • D. Enablement Lab

正解:B


質問 # 31
Which of the following are critical in planning for network segmentation using Layer 2 technologies?
Response:

  • A. Subnetting and routing protocols
  • B. VLAN segmentation and MAC address management
  • C. Fibre Channel zoning and thin provisioning
  • D. IP address allocation and subnetting

正解:B


質問 # 32
What is the purpose of modifying a network design template?
Response:

  • A. To comply with all network security policies
  • B. To replace all static IP addresses
  • C. To increase the speed of network traffic
  • D. To ensure that it applies specifically to the current project's requirements

正解:D


質問 # 33
What are three design best practices when discussing the potential for a network replacement?
Response:

  • A. Remove and decommission the hardware.
  • B. Review existing network configurations for Dell, Cisco, and HP switches.
  • C. Document the replacement steps.
  • D. Provide support for onsite replacement.
  • E. Recommend the one-size-fits-all solutions in the Dell Portfolio.

正解:B、C、D


質問 # 34
What is the correct order of steps involved in OSPF troubleshooting?
Response:

  • A. 1. Check if the devices are in the same area and area type.
  • B. 1. Check if the devices are in the same area and area type.
  • C. 1. Check if the devices are in the same area and area type.
  • D. 1. Check if the devices are in the same area and area type.

正解:D


質問 # 35
Which planning process is focused on ensuring the availability of licenses for networking devices?
Response:

  • A. VxRail SFS planning
  • B. VLAN configuration
  • C. Layer 2 (L2) planning
  • D. OS10 Licensing

正解:D


質問 # 36
Which technology is essential for planning storage networks in conjunction with PowerMax arrays?
Response:

  • A. Data-at-Rest Encryption (D@RE)
  • B. Software-defined networking (SDN)
  • C. Fibre Channel over Ethernet (FCoE)
  • D. OS10 Licensing

正解:C


質問 # 37
What key aspect of the scoping phase helps ensure that the network design meets financial and technical requirements?
Response:

  • A. Cable management
  • B. Cost estimation using Financial Force
  • C. Network monitoring tools
  • D. Hardware configuration

正解:B


質問 # 38
What is a standard deployment method for an L3 network?
Response:

  • A. Device link detection protocol
  • B. Link aggregation control protocol
  • C. BGP neighborship
  • D. Unidirectional link detection

正解:C


質問 # 39
What is a key benefit of using FastScript in network automation?
Response:

  • A. It reduces the need for real-time network monitoring
  • B. It creates backups of network configurations
  • C. It provides in-depth traffic analysis for network optimization
  • D. It automatically generates and applies configurations across multiple devices

正解:D


質問 # 40
Under which use case is an Enterprise SONiC implementation recommended?
Response:

  • A. Cloud-level hyperscale implementation
  • B. Implementation that requires traditional SNMP monitoring
  • C. Small-to-medium business implementation
  • D. Multipurpose OS implementation

正解:A


質問 # 41
Which of the following steps should be taken when modifying a network design template for a specific project?
Response:

  • A. Customize the template to reflect the unique requirements of the current project
  • B. Add all devices to a single VLAN
  • C. Use a generic template without customization
  • D. Reuse the template from a previous project without changes

正解:A


質問 # 42
Which lab environment is most commonly used for verifying the correctness of scripts generated by FastScript?
Response:

  • A. Simulation Lab
  • B. EPS Tool
  • C. CloudIQ
  • D. Real-time Network Lab

正解:D


質問 # 43
Which of the following tasks can be automated using FastScript in a networking project?
Response:

  • A. Device monitoring
  • B. VLAN configuration
  • C. IP address assignment
  • D. Routing table updates

正解:B、C、D


質問 # 44
What are two roles of a design architect?
Response:

  • A. Communicating with sales and the delivery team
  • B. Creating a new order list while planning for a network change
  • C. Updating the PM and account team if additional orders are required
  • D. Planning for upgrading an existing network device in a customer's environment

正解:A、C


質問 # 45
Match the following planning phases with their descriptions:
Phase
Physical planning
Layer 2 (L2) planning
Layer 3 (L3) planning
OS10 Licensing
Description
A) Identifies hardware locations and cable paths
B) Focuses on VLANs, MAC addresses, and switching
C) Defines routing protocols, IP addressing, and topology
D) Ensures the correct software licensing for OS10 devices
Response:

  • A. Physical planning - D
  • B. Physical planning - B
  • C. Physical planning - A
  • D. Physical planning - A

正解:D


質問 # 46
......

テストエンジン練習D-NWG-DS-00テスト問題:https://jp.fast2test.com/D-NWG-DS-00-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어