質問 # 35
What is the recommended clearance space required for hot and cold aisles in a data center?

  • A. 1-2 feet
  • B. 7-8 feet
  • C. 5-6 feet
  • D. 3-4 feet

正解:D


質問 # 36
What types of electrical equipment is typically located inside the computer room

  • A. Circuit Breakers only
  • B. Uninterrupted Power Supply (UPS) only
  • C. power distribution units, not power distribution equipment, remote power panels, and power strips
  • D. transformers only

正解:C

解説:
Explanation:


質問 # 37
Where is the recommended location for remote power panels?

  • A. suspended from ceiling
  • B. inside a sealed room
  • C. at one or both ends of an equipment row
  • D. outside the building

正解:C


質問 # 38
What type of power utility service is desired?

  • A. Renewable energy-based utility service
  • B. Underground or overhead utility service
  • C. Overhead utility service
  • D. Direct Current (DC) utility service

正解:B


質問 # 39
What electrical service feed options are there for a data center?

  • A. Dual Entrance/Dual Pathway
  • B. All of the above
  • C. Single Entrance/Single Pathway
  • D. Single Entrance/Dual Pathway

正解:B


質問 # 40
What is the appropriate fire rating requirements for an electrical room?

  • A. 3 hours
  • B. 1 hour
  • C. 1/2 hour
  • D. 2 hours

正解:B


質問 # 41
What is the recommended floor loading capacity for a data center?

  • A. 1500 lbs per sq. ft.
  • B. 1000 lbs per sq. ft.
  • C. 1250 lbs per sq. ft.
  • D. 1750 lbs per sq. ft.
  • E. 2000 lbs per sq. ft.

正解:A


質問 # 42
What is the formula to find the maximum allowable cable depth in a non-solid bottom cable tray?

  • A. H = 100/1 + (L * 0.0007)
  • B. H = 50/1 + (L * 0.0007)
  • C. H = 200/1 + (L * 0.0007)
  • D. H = 150/1 + (L * 0.0007)

正解:D


質問 # 43
What IBC occupancy category are data centers placed in if they don't have to operate after an earthquake?

  • A. Category3
  • B. Category2
  • C. Category 4
  • D. Category1

正解:B


質問 # 44
What is the most common type of automatic transfer switch?

  • A. Open transition
  • B. Delayed transition
  • C. Soft load transition
  • D. Closed transition

正解:A


質問 # 45
what additional fuel filtering is required for generators in class F3 and F4 facilities

  • A. three stage, spin-on-type fuel filters
  • B. four stage, paper-type fuel filters
  • C. two-stage, spin-on-type fuel filters
  • D. five stage, mesh type fuel filters

正解:A


質問 # 46
Which areas should generate a history of all access attempts and monitored by CCTV Security System?

  • A. Any concealed places
  • B. Computer rooms, Loading docks, storage areas, Staging areas and Vendor Storage
  • C. Storage Areas
  • D. Only computer rooms
  • E. Loading Docks

正解:B


質問 # 47
What is an automatic static transfer switch used for?

  • A. Switching between different generator power sources
  • B. Switching between multiple utility power sources
  • C. Switching between AC and DC power sources
  • D. Switching between utility and generator power sources

正解:D


質問 # 48
What is the smoke development rating required for all materials hosted in a containment system?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

正解:B


質問 # 49
What is the recommended height of a ceiling in a data center or telecommunications room?

  • A. 0
  • B. 1015ft(correct)
  • C. 1112ft
  • D. 012 ft

正解:B


質問 # 50
What is the United States Average Power Utility Outage Annually And What Is The Average Repair Time?

  • A. Three outages annually, with an unknown average repair time
  • B. 2.5 outages annually, with average repair time of approximately 7 hours
  • C. 1 outage annually, with average repair time of approximately eight hours
  • D. 1.86 outages annually, with average repair time of four hours

正解:D


質問 # 51
What is the clearance required for the hot aisle width?

  • A. 4 ft
  • B. 6 ft
  • C. 2 ft
  • D. 8 ft

正解:A


質問 # 52
what are the dead loads of a structure?

  • A. Loads due to snow, wash
  • B. Dynamic loads due to external forces like suction winds and rain
  • C. Temperature fluctuations leading to expansion and contraction
  • D. Static loads due to force of gravity on fixed building elements (correct)

正解:D


質問 # 53
What are the speed and distance limitations of ESCON?

  • A. 10 Gbps @ up to 40km
  • B. 17 MB/s @ up to 60km
  • C. 1 Gbps @ up to 100m
  • D. 100 Mbps @ up to 20km

正解:B


質問 # 54
What is the recommended range of temperature for a data center?

  • A. 22-26°C (72-79°F)
  • B. 20-24°C (68-75°F)
  • C. 18-22°C (64-72°F)
  • D. 26-30°C (79-86°F)
  • E. 24-28°C (75-82°F)

正解:B


質問 # 55
What is a possible downside to customer-owned maintenance holes?

  • A. leaks leading to water infiltration into data center
  • B. susceptibility to theft or damage by unauthorized personnel
  • C. poor aesthetic appearance around facility exterior
  • D. fire risk near data center property

正解:A


質問 # 56
What is the NEBS GR-3028-CORE recommended operational temperature.

  • A. -25°F to +125°F (-32°C to +52°C)
  • B. -20°F/-28° C minimum and up to a maximum of104 ° Fahrenheit/40° Celsius
  • C. Up To140 Degrees Fahrenheit /60 Degrees Celsius
  • D. -30°F to +110°F (-34°C to +43°C)

正解:B


質問 # 57
......

DCDC-003.1試験問題集簡単なまとめ:https://jp.fast2test.com/DCDC-003.1-premium-file.html

DCDC-003.1最新DCDC Certificationトレーニングと認定をゲット:https://drive.google.com/open?id=1n9Bl2w8pZ8ZQf1GYelQU6-vUwSio4JkZ


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어