C_TS413_2020試験問題集、C_TS413_2020練習テスト問題
PDF問題(2022年最新)実際のSAP C_TS413_2020試験問題
質問 32
Which of the following is a prerequisite for external refurbishment?
- A. Define the order type for external refurbishment.
- B. Select the material group for externally refurbished materials.
- C. Create the purchasing info record for the external provider.
- D. Activate the subcontracting indicator in an external activity.
正解: D
質問 33
You want to have several plan dates calculated in a maintenance plan. Which scheduling parameter do you use?
- A. Offset
- B. Scheduling indicator
- C. Scheduling period
- D. Call horizon
正解: C
質問 34
You want to set up a scenario for regular maintenance. The first event should take place after 1 year; after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system?
- A. Maintenance package offset
- B. Scheduling indicator
- C. Shift factor
- D. Maintenance plan category
正解: A
質問 35
Which functionalities are available in the SAP Asset Manager for a maintenance worker? Note: There are
2 correct Answers to this question.
- A. Change BOM. Create a work order on the ESRI map
- B. Schedule resources. Change task list
- C. Display maps. Display and maintain technical objects
- D. Confirm time sheets. Attach documents
正解: C,D
質問 36
Which statements about the structure indicator are correct? Note: There are 2 correct Answers to this question.
- A. It defines which data is transferred to the lower levels of the hierarchy.
- B. It defines the allowed characters for a functional location.
- C. It can have a maximum length of 50 characters.
- D. It defines hierarchy levels of the functional location structure.
正解: B,D
質問 37
In which cases are projects (PS) used in the area of SAP S/4HANA Asset Management? Note: There are 2 correct Answers to this question.
- A. Condition-based maintenance
- B. Investments
- C. External refurbishment
- D. Shutdowns and overhaul
正解: B,D
質問 38
You create a revision for a Maintenance Event Builder (MEB) scenario. Which of the following statements are correct? Note: There are 2 correct Answers to this question.
- A. You must assign maintenance notifications to the revision.
- B. You must use hierarchical task lists for the MEB scenario.
- C. You can assign a network to a revision.
- D. You can assign a hierarchical task list to the revision.
正解: A,D
質問 39
Where can the maintenance planner perform a material availability check? Note: There are 2 correct Answers to this question.
- A. Via the SAP Fiori app "Maintenance Scheduling Board"
- B. Via the multi-level order list (SAP GUI)
- C. Within the SAP Fiori-based background job
- D. Via the SAP Fiori app "Manage Maintenance Order List"
正解: B,C
質問 40
Which statement is correct when planning maintenance work that is to be carried out by an external company?
- A. In the control key assigned to the order operation, the "Service" indicator must always be activated.
- B. If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.
- C. If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system.
- D. A service master record must always be assigned to the external order operation.
正解: B
質問 41
In which component do you have to perform most of the configuration to set up SAP Asset Manager?
- A. SAP ERP on HANA
- B. SAP BTP (formerly Cloud Platform)
- C. SAP Mobile Platform
- D. SAP S/4HANA
正解: B
質問 42
Which of the following statements about orders with operation account assignment (OAA) are correct?
Note: There are 3 correct Answers to this question.
- A. The settlement rule is maintained on the header level.
- B. A technical object must be assigned to an order operation.
- C. Overall costs are dynamically summed up on the header level.
- D. Purchase requisitions have the operation as account assignment.
- E. Costs are stored only for the operation object.
正解: B,C,E
質問 43
Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance order?
- A. Package offset
- B. Scheduling type
- C. Initial/subsequent buffer
- D. Call horizon
正解: C
質問 44
Which operations can the responsible person perform after a maintenance order is technically completed? Note: There are 3 correct Answers to this question.
- A. Lock or unlock the order.
- B. Change the settlement rule.
- C. Update the estimated costs.
- D. Create an invoice receipt for delivered materials.
- E. Change the planned costs.
正解: A,B,D
質問 45
Which statements related to the creation of maintenance orders are correct? Note: There are 2 correct Answers to this question.
- A. The long text of the reference notification can be automatically copied as the long text of the order.
- B. The document within the document management system can be assigned only at operational level.
- C. The assignment of the header notification to an order CANNOT be deleted.
- D. When an order is created based on a single notification, this notification becomes the header notification.
正解: A,D
質問 46
You require stock material to carry out maintenance tasks. Which of the following statements regarding material planning in the maintenance order are correct? Note: There are 3 correct Answers to this question.
- A. Material can be assigned at the order operation level.
- B. A control key for internal workforce is required when assigning stock material to an order operation.
- C. A goods receipt can be entered for a technically completed maintenance order.
- D. The pick list for materials can be printed before order release.
- E. Material can be assigned at the order header level.
正解: A,B,C
質問 47
How do you map a counter replacement in SAP S/4HANA Asset Management?
- A. Deactivate the current counter and create a new counter.
- B. Create a new measurement document marked as a counter replacement.
- C. Create a new measurement document and assign a valuation code for counter replacement.
- D. Replace the defective piece of equipment to which a counter is assigned.
正解: B
質問 48
Which SAP UI technology is used for the Report and Repair Malfunction app?
- A. SAP GUI for Windows
- B. Web Dynpro
- C. SAPUI5
- D. SAP GUI for HTML
正解: B
質問 49
You want to create a new functional location. Which configuration steps are required? Note: There are 2 correct Answers to this question.
- A. Define the number range for the functional location category.
- B. Define the reference functional location.
- C. Define the functional location category.
- D. Define the structure indicator.
正解: C,D
質問 50
You need to create a new functional location. Which actions can you perform with the SAP Fiori app
"Create Technical Object"? Note: There are 3 correct Answers to this question.
- A. Assign a subordinate piece of equipment.
- B. Edit classification data and characteristics.
- C. Assign documents.
- D. Change a reference location.
- E. Create a task list for functional location.
正解: B,C,D
質問 51
In which maintenance object can you use an activity type? Note: There are 2 correct Answers to this question.
- A. Maintenance order header
- B. Notification activity
- C. Maintenance order operation
- D. Work center
正解: C,D
質問 52
Which steps are available for the maintenance technician when using the Report Malfunction tile? Note:
There are 3 correct Answers to this question.
- A. View details of the technical object by navigating to the Asset Viewer.
- B. Input estimated costs for repair malfunction.
- C. Select and print the maintenance order shop papers.
- D. Display the current location of the technical object.
- E. Add a URL to provide further information.
正解: A,D,E
質問 53
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct Answers to this question.
- A. Factory calendar
- B. Scheduling indicator
- C. Start date
- D. Scheduling period
正解: C,D
質問 54
Which of the following statements are correct regarding a cross-plant planning scenario?
- A. Multiple planning plants are assigned to a maintenance plant (m:1).
- B. It is not supported in SAP S/4HANA.
- C. Multiple maintenance plants are assigned to a planning plant (n:1).
- D. An n:m relationship between maintenance plant and planning plant can be maintained in SAP S/4HANA.
正解: A
質問 55
......