
80試験解答はC_IBP_2208最新版 テストエンジン
合格確定C_IBP_2208試験問最新のC_IBP_2208試験問題集PDF2022年更新
SAP C_IBP_2208 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
| トピック 5 |
|
質問 40
What are some of the properties of filter blocks?Note: There are 3 correct answers to this question.
- A. Filter blocks are imposed when modeling cross-period calculations.
- B. Filter blocks can be visualized in SAP IBP, add-in for Microsoft Excel
- C. Filter blocks are imposed when modeling attribute transformations.
- D. Filter blocks can be visualized in the Key Figure Calculations app.
- E. Filter blocks are imposed when modeling an attribute as a key figure.
正解: B,C,E
質問 41
You are implementing SAP IBP to plan for a supply chain that experiences high seasonality.What supply planning operators can be used in your model to plan stock pre-builds?
- A. Supply optimizer only
- B. Finite heuristics only
- C. Supply optimizer and supply heuristics
- D. Finite and infinite heuristics
正解: C
質問 42
What are the S&OP operator (optimizer) parameters associated with demand fair share?
- A. Number of fair share segments Maximum days of coverage Number of fair share segments late delivery
- B. Number of fair share segments Additional tiering costs (default) Number of fair share segments late delivery
- C. Number of fair share segments Additional tiering costs (default) Maximum inventory
- D. Number of fair share segments Additional tiering costs (default) Inventory days of supply
正解: B
質問 43
You define fixing for a key figure.Which of the following functions are available for this key figure? Note: There are 2 correct answers to this question.
- A. Fixing is possible for manually editable key figures.
- B. Fixing is possible for a certain period, including all child values in the hierarchy.
- C. Fixing is possible for a certain quantity of a key figure value.
- D. Fixing is possible for system editable key figures.
正解: B,D
質問 44
Which of the following are inputs to Demand Sensing with Gradient Boosting (Full) algorithm?Note: There are 2 correct answers to this question.
- A. Future Consensus Forecasts and Lagged Forecast Snapshots
- B. Forecast Error CV Calculated by Manage Forecast Error Calculations app
- C. Sales Order Quantities (both historical and future open orders)
- D. Recommended Safety Stocks from Multistage Inventory Optimization
正解: A,D
質問 45
What are some of the available ABC segmentation methods in SAP IBP?Note: There are 2 correct answers to this question.
- A. By Number of Items (Sorted Average)
- B. By Pareto Principle (Sorted and Calculated Values)
- C. By Number of Items (Sorted Values)
- D. By Pareto Principle (Sorted and Cumulated %)
正解: B,C
質問 46
You are working with inventory key figures.What are some of the business scenarios where you can use the Last Period Aggregation function?Note: There are 2 correct answers to this question.
- A. Calculating how many periods inventory is going to last based on the planned demand
- B. Calculating the value of inventory on any time profile level ensuring flexibility of calculation
- C. Search for and return the last not null value of the inventory key figure
- D. Calculating the value of inventory on a weekly basis, using static aggregation from the daily level
正解: A,C
質問 47
You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed?Note: There are 2 correct answers to this question.
- A. Planning results can be generated faster by the optimizer.
- B. Push and Pull production models are used by the optimizer.
- C. Prioritization of demand elements one by one is achieved by unconstrained heuristics.
- D. Finite heuristics can achieve demand prioritization and pegging.
正解: B,D
質問 48
What function would you use to configure a year-to-date calculation?
- A. Rolling Aggregation
- B. Dynamic Rolling Aggregation
- C. Last Period Aggregation
- D. Cumulative Aggregation
正解: D
質問 49
How many different time levels can be selected within one planning view?
- A. Only base time levels of the planning area
- B. All time levels available in the time profile, restricted by global configuration parameter
- C. Only time levels from the base planning level of selected key figures
- D. All time levels available in the time profile
正解: D
質問 50
You are starting a new implementation project for SAP IBP and are considering the possible system architecture.What are the possible approaches for setting up the system landscape?Note: There are 2 correct answers to this question.
- A. Create additional test planning areas in the production system to support cutover needs.
- B. Create additional planning areas in the test system to support training needs.
- C. Set up a two-tier landscape, and have the configuration of the development system regularly updated from the production system.
- D. Set up a three-tier landscape using transport, starting from the development system to test and production.
正解: C,D
質問 51
Which of the following key functions are supported by SAP IBP for sales and operations?Note: There are 2 correct answers to this question.
- A. Time series analysis
- B. Scenario analysis for operational supply planning
- C. Simple statistical forecast
- D. Multi-Level Supply Planning Heuristics
正解: C,D
質問 52
What are the ways to achieve rolling aggregation with SAP IBP?
- A. Using a key figure calculation
- B. Using a appropriate period weight factor
- C. Using a attribute as a key figure
- D. Using a local member
正解: B
質問 53
Which of the following data can be tracked using a change-history-enabled key figure?Note: There are 3 correct answers to this question.
- A. Modified date
- B. Scenario ID
- C. Key figure type
- D. Reason code
- E. Attributes
正解: A,D,E
質問 54
You need to make manual adjustments to your S&OP plan.Which are possible ways of making these changes?Note: There are 2 correct answers to this question.
- A. Leveraging the functionality of SAP Workzone
- B. Using Driver-Based planning
- C. Leveraging the web-based planning capability
- D. Using Microsoft Excel planning views
正解: C,D
質問 55
You need to create time periods for the time profile in a planning area.What should you be aware of when running the Create Time Periods application job?
- A. In the Parameter Section of the application job, choose the Time Profile ID and Planning Area.
- B. A time profile has to be activated so that the application job can proceed.
- C. The assigned Planning Area must be active.
- D. This application job can be run for multiple time profiles at once.
正解: A
質問 56
How can the SAP IBP scenario modeling functionality support business users in the S&OP planning cycle?Note: There are 2 correct answers to this question.
- A. Simulate heuristics run in Supply Review stage
- B. Simulate demand sensing inputs for Supply Review
- C. Model inventory turns based on Target Safety stocks
- D. Simulate statistical forecast at the Demand Review stage
正解: A,D
質問 57
Model configuration allows the attributes of a master data type to be assigned as key figures.Which features are relevant for this type of object?
- A. This object contains user-defined criteria that monitor the running of business plans.
- B. This type of key figure is not usually stored and it cannot be set to editable.
- C. This object is not exposed to the user in planning views or modeling.
- D. This object provides a single value for a unique planning combination.
正解: D
質問 58
The S&OP Operator Profiles app is used to configure different types of algorithms.Which algorithm-specific settings are unique for only the Time Series-based Supply Optimizer?Note: There are 2 correct answers to this question.
- A. Time profile level
- B. Global cost factors
- C. Discretization
- D. Processing mode
正解: B,D
質問 59
......
C_IBP_2208試験問題集無料サンプル365日更新:https://jp.fast2test.com/C_IBP_2208-premium-file.html
まもなく無料セール終了!- リアルC_IBP_2208のPDF解答を試そう:https://drive.google.com/open?id=1f3o17wVvXJ13EKR_Pq6KJs6_duJHUNv_