
[2026年03月] 問題集練習試験問題学習ガイドはC-ARSUM-2508試験合格させます
C-ARSUM-2508問題集には練習試験問題解答
SAP C-ARSUM-2508 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
| トピック 5 |
|
| トピック 6 |
|
| トピック 7 |
|
質問 # 38
When using the template upgrade feature for Supplier Management projects, which conditions must be met? Note: There are 2 correct answers to this question.
- A. The supplier organization is active.
- B. Updates to project questionnaires pass a system significance check.
- C. The supplier has at least one qualification.
- D. None of the project's tasks have started or all of the project's tasks have completed.
正解:A、D
質問 # 39
A supplier is invited to start a qualification. Which activity does the supplier perform first before appearing in Qualified status?
- A. Participate in a sourcing event
- B. Submit a response to the questionnaire
- C. Upload certificates of insurance
- D. Select a region or commodity
正解:B
質問 # 40
Which of the following API types does SAP recommend to use to achieve clean core integrations? Note: There are 2 correct answers to this question.
- A. OData
- B. RFC
- C. SOAP
- D. IDoc
正解:A、C
質問 # 41
Which of the following are characteristics of recurring phases? Note: There are 2 correct answer to this question
- A. They can be triggered manually in between scheduled occurrences.
- B. They automatically stop after a set number of reoccurrences.
- C. The survey and scorecard documents must be recreated each time.
- D. They can be started automatically based on recurrence schedule.
正解:A、D
質問 # 42
Your customer wants to ask a different set of questions for supplier qualifications in North America, South America, and Europe.
How do you configure these questions in your customer's Supplier Qualification Project template?
- A. Assign region-based visibility conditions within the qualification questionnaire survey
- B. Add the questions to separate content documents mapped to each region
- C. Create a separate supplier qualification project template for each region
- D. Update the user matrix to assign the appropriate questionnaire based on the region selected
正解:A
質問 # 43
Which options are available to populate scorecard KPIs with data outside of a survey? Note: There are 2 correct answer to this question
- A. Map KPIs to an existing analytical report
- B. Manually enter the KPI value
- C. Sync values from SAP ERP
- D. Map KPIs to items in the supplier registration questionnaire
正解:A、B
質問 # 44
Which of the following is a benefit of using template questions in Supplier Performance Management projects?
- A. Submit consensus scores for surveys
- B. Control whether projects are upgraded to the latest version of the template
- C. Collect data for analytical reports
- D. Define project content added during creation
正解:C
質問 # 45
Your customer wants to automatically assign approvers to supplier requests based on the supplier's region.
Which option do you recommend according to SAP Ariba's best practice?
- A. Enable chain rules in each approval node within the approval task.
- B. Upload a user matrix file in the SM Administration area.
- C. Apply visibility conditions to region-specific project groups on the Team tab of the Supplier Request template.
- D. Create a team member rules file in the Supplier Request template.
正解:B
質問 # 46
Which of the following is a benefit of using template questions in Supplier Performance Management projects?
- A. Submit consensus scores for surveys
- B. Enable pre-grading for survey questions
- C. Control whether projects are upgraded to the latest version of the template
- D. Define project content added during creation
正解:D
質問 # 47
Which type of SAP Ariba project can engagement risk projects be associated with?
- A. Procurement contract workspace
- B. Supplier performance management project
- C. Supplier registration project
- D. Sourcing project
正解:B
質問 # 48
Which action is part of an advanced approval flow?
- A. Use the approval rule editor to add conditions to approval nodes.
- B. Enable the "repeat for each document draft" setting.
- C. Associate a folder containing multiple documents with the approval task.
- D. Specify project groups in the reviewer's field of the task.
正解:D
質問 # 49
You are a consultant on an SAP S/4HANA Cloud greenfield project.
Which of the following aspects should you focus on to achieve and maintain clean core data quality? Note: There are 2 correct answers to this question.
- A. Stability
- B. Efficiency
- C. Timeliness
- D. Accuracy
正解:A、D
質問 # 50
Which users can create engagement-level issues for control-based engagement risk assessment projects? Note: There are 2 correct answer to this question
- A. The engagement requesters
- B. Members of the Supplier Risk Engagement Governance Analyst group
- C. Approvers of the inherent risk screening questionnaire
- D. Decision makers for the related risk controls
正解:A、B
質問 # 51
You are creating a new Supplier Performance Management project template from scratch. Which elements does SAP Ariba support on the Documents tab? Note: There are 2 correct answer to this question
- A. Microsoft Word file
- B. Recurring phase
- C. Folder
- D. Analytical report
正解:C、D
質問 # 52
A supplier is invited to start a qualification.
Which activity does the supplier perform first before appearing in Qualified status?
- A. Participate in a sourcing event
- B. Select a region or commodity
- C. Upload certificates of insurance
- D. Submit a response to the questionnaire
正解:C
質問 # 53
Which actions are available to decision makers when all assessments for a control are approved? Note: There are 2 correct answers to this question.
- A. Assign an overall grade for the assessments.
- B. Mark the control as effective or ineffective.
- C. Correct erroneous information in the assessments.
- D. Create issues related to the control.
正解:A、B
質問 # 54
......
無料SAP Certified Associate C-ARSUM-2508試験問題:https://jp.fast2test.com/C-ARSUM-2508-premium-file.html
C-ARSUM-2508はSAP Certified Associate実際の無料試験練習テスト:https://drive.google.com/open?id=18RYFNVIj-FXcU1dlsIwKhF-r1wrhhK_L