
[2025年11月]更新のOracle 1z0-1066-24試験練習テスト問題
更新された認定試験1z0-1066-24問題集で練習テスト問題
質問 # 78
Which two statements are true when using Measure catalogs? (Choose two.)
- A. You can restrict access to Measure Catalogs using Administer Data Security.
- B. Measure catalogs are defined in the system to improve the performance of the plan.
- C. You can add or remove measures from a measure catalog.
- D. You navigate to Configure Measure Catalogs to edit the Catalog.
- E. The measure catalog has a collection of measures that you can enable for use in a single plan in the Planning Central work area.
- F. The predefined measure catalog is not the system default.
正解:C、E
質問 # 79
Which statement is correct regarding S&OP?
- A. S&OP supply requirements are based on Bills of Resources (BOR) if available; otherwise, the Work Definitions are used.
- B. If Bills of Resources are used, the only way to make one available is via import using a dedicated template.
- C. S&OP supply requirements are only based on Bills of Resources (BOR).
- D. Sourcing cannot be maintained directly in S&OP, but must be collected.
正解:A
解説:
In Sales and Operations Planning (S&OP), supply requirements are primarily based on Bills of Resources (BOR) when available, and Work Definitions serve as a fallback option when BOR is not present. This flexibility enables S&OP to utilize the most specific resource information for planning without limiting sourcing data to imported templates only NAVIGATE YOUR NEXT
.
質問 # 80
Cost accounting captures costed transactions that are picked up by the cost processor. Which is not picked up by the cost processor?
- A. period close adjusting journal entries for Payroll
- B. invoices and revenue interfaced from Cloud Receivables
- C. supplier invoices interfaced from Cloud Payables
- D. shipping, receiving, and inventory transactions from manufacturing
正解:B
質問 # 81
As Materials Manager, you are always attentive to Finance's concern about high inventory levels. To that end, you arranged to off-load procurement and storage of several expensive components to become the responsibility of your contract manufacturer. You modified the bills of material accordingly. You thought this would satisfy Finance, but they complained to you that even though production levels have remained flat, they are not seeing a reduction in inventory.
What is the problem?
- A. The "supplier" box on the Organization tab in Maintain Supply Network Model has not been deselected.
- B. The "supplier" box in Manage Plant Parameters has not been deselected.
- C. The supply type has not been changed to "supplier" for the affected components in the Item Structures of the contracted items.
- D. The "supplier" box for the "Supply Types to Include" plan option of Manage Plans has not been deselected.
正解:C
解説:
When transitioning procurement responsibility to a contract manufacturer, it is essential to adjust the supply type of the contracted items to "supplier" within the item structures. This change ensures that the inventory associated with these components reflects their new procurement source, helping reduce your reported inventory levels. Without this adjustment, Oracle Planning may still consider these items as being managed internally, thus failing to reflect the reduction in inventory as anticipated
MY ORACLE SUPPORT
.
質問 # 82
You have run a plan for your organization and there were sales orders that have been set up for drop shipment that you cannot see in the plan.
Which two options explain why the sales orders cannot be seen in the plan? (Choose two.)
- A. Supplier not configured in Manage Planning Source Systems
- B. Drop Ship Item Validation Org has not been set up.
- C. Include drop ship demands and supplies flag has not been checked on your plan options.
- D. Drop Ship Demand Class has not be set up.
- E. Planning Profile 'Enable Planning for Drop Shipments' has not been set to 'Yes'.
正解:A、D
質問 # 83
Which three steps are required so that a supply plan can use different service-level percentages for different groupings of items when calculating safety stock?
- A. Create segment groups.
- B. Assign the percentage on the Safety Stock tab of plan options.
- C. Create a supply planning policy assignment set.
- D. Create a safety stock policy assignment set.
- E. Execute segmentation.
正解:A、C、E
解説:
To apply different service-level percentages to item groupings, you first need to create a supply planning policy assignment set that defines the rules for various segments. Next, define segment groups to categorize items based on shared attributes. Finally, execute segmentation to assign items to the correct segments and apply the desired safety stock policies. This process ensures service-level percentages are customized per grouping as documented in Oracle's guidelines on safety stock policies and segmentation
質問 # 84
Your client has reviewed all of the current graphs available for the plans, but cannot find one that shows them exactly what they want for the Days of Supply. How can this key performance indicator be added?
- A. Go to Configure Planning Analytics > Actions > Manage Tables, Graphs, and Analysis Sets, and add a new graph with the requested data.
- B. Open the plan and go to Actions > Manage Tables, Graphs, and Analysis Sets, and edit the current 'Days of Supply' graph to meet the client needs.
- C. Go to Configure Planning Analytics > Actions > Manage Tables, Graphs, and Analysis Sets, and edit the current 'Days of Supply' graph to meet the client needs.
- D. Open the plan and go to Actions > Manage Tables, Graphs, and Analysis Sets, and add a new graph with the requested data.
- E. It is not possible to add new or change the current graphs.
正解:D
質問 # 85
Which is not a potential source for a planning attribute?
- A. A standard attribute for purchase orders
- B. A descriptive flexfield for purchase requisitions or work orders
- C. An extensible flexfield for sales orders
- D. A key flexfield for items
正解:D
解説:
Key flexfields are not typically used as a source for planning attributes in Oracle Planning and Collaboration Cloud. Instead, extensible and descriptive flexfields are more commonly utilized as planning attributes for various transactions and items, such as sales orders and purchase requisitions
.
質問 # 86
Your client has high-priority customers with frequent, small volume orders.
Which two steps should a backlog planner consider if a backlog run does not produce the desired results? (Choose two.)
- A. Activate more intricate Demand Priority rules.
- B. Edit the "Enforce Current Commit" or "Pull-in Enabled' demand attributes.
- C. Edit the "Pull-in Disabled" demand attribute.
- D. Isolate the problematic customer in its own Backlog Planning run.
- E. Consider simulation.
正解:B、E
質問 # 87
When analyzing demand fulfillment, what are the three types of recommendations that users can review and accept for expediting? (Choose three.)
- A. Expedite transfer orders
- B. Expedite make orders
- C. Expedite make to stock orders
- D. Expedite drop ship orders
- E. Expedite buy orders
正解:A、B、E
質問 # 88
Which set of transaction types data are uploaded in Contract Manufacturing Collaboration?
- A. Work-order Completions
- B. Planned orders, Planned Order Commits
- C. Component Material Issues, Work-order Completions
- D. Component Material Issues, Work-order Completions, Shipment Confirmations
正解:C
質問 # 89
It is now January 2023. Your customer has loaded 3 years worth of shipment history (for 1/1/20 through 12/31/22) and wants to generate a monthly forecast for 2023 based on two years of shipment history.
When creating a demand plan, which two plan scope and demand plan options should your customer use? (Choose two.)
- A. For demand plan option, add forecast shipments as forecasting profile, enter historical buckets as 24. and enter forecast buckets as 12.
- B. For demand plan option, add forecast shipments as forecasting profile, enter history start date as 1/1/21. enter history end date as 12/31/22. and enter forecast start date as 1/1/23.
- C. For demand plan option, add forecast shipments as forecasting profile, and enter historical buckets as 24.
- D. For demand plan option, add forecast shipments as forecasting profile, enter history start date as 1/1/21. forecast start date as 1/1/23. and enter forecast end date as 12/31/23.
- E. For plan scope, select plan horizon as 12 months, forecasting calendar as Gregorian, and forecasting time level as month.
- F. For plan scope, select plan horizon days as 365. forecasting calendar as Gregorian, and forecasting time level as month.
正解:A、E
質問 # 90
Identify two ways you can track performance against goals when defining measure goals. (Choose two.)
- A. Value
- B. Aggregation
- C. Quantity
- D. Range
- E. Attribute
- F. Specification
正解:A、E
質問 # 91
As the planner, you have made some changes to a few of the specifications for items in your simulation sets. You would like to run one of your existing Demand and Supply Plans that contains this simulation set to see how these changes impact the plan.
Which option shows the steps you must complete in order to ensure that when you run your existing Demand and Supply plan, it contains your changes to the simulation set?
- A. You are only able to update one item attribute at a time. Since you have changed multiple attributes, you will be unable to update and run this plan.
- B. When the Demand and Supply Plan is run, verify that 'Recalculate Safety Stock' is selected in the Details section.
- C. No additional steps are necessary. Any plans that contain your simulation set will automatically be updated with the changes.
- D. When the Demand and Supply Plan is run, verify that 'Refresh with current data' is selected in the Details section.
正解:D
質問 # 92
Your Manufacturing Organization makes bicycles and ships 50% of its output directly to large chain retailer customers. Your organization also ships products to your Distribution Center so that it can fulfill many other smaller customers. Your Manufacturing Organizations uses Oracle SCM Planning Cloud, but your Distribution Center does not.
Which setups should you recommend to the Manufacturing Organization?
- A. In Edit Plan Options, ensure both organizations are included in plan scope, and select, 'include transfer orders'.
- B. Map the Manufacturing Organization as a supplier in Maintain Supply Network Model; Select 'Include transfer orders' in Edit Plan Options.
- C. Map the Distribution Center as a customer in Maintain Supply Network Model; Select 'include transfer orders' in Edit Plan Options.
- D. Select 'include transfer orders' in Edit Plan Options' advanced supply options.
正解:C
質問 # 93
Which two statements are true regarding Planning Business Flows? (Choose two.)
- A. You can analyze and adjust data at any stage of the process.
- B. Planners can set up automatic release rules or release orders manually as part of the plan execution.
- C. In automated plans, all release rules must be automatic.
- D. Inventory Planning cannot run in the Planning Business Flows.
- E. Demand and Supply Planning have to be run in separate business flows.
正解:A、B
質問 # 94
Which option outlines changes you can make a simulation plan when evaluating demand and supply?
- A. Change item specification values, change item lead times, change item-organization specification values
- B. Add demands, cancel demands, reschedule demands, add new planned orders, reschedule supplies
- C. Change item specification values, change item lead times, create mass changes for items
- D. Change item specification values, change item lead times, create mass changes for items all at once, change item-organization specification values
- E. Add demands, cancel demands, reschedule demands, and supply, cancel supply, reschedule supplies
正解:E
質問 # 95
A new product has no similar items on which to base a forecast. Which approach is a temporary solution for supply planning?
- A. Consider a simulation of the supply plan's calculated safety stock.
- B. Use safety stock as demand, until enough shipment history is available.
- C. There is no temporary solution.
- D. Consider safety stock based on a days-of-cover calculation.
正解:B
質問 # 96
Which two are valid settings when defining a replenishment planning cluster?
- A. Sweep location (required)
- B. Location hierarchy (required)
- C. Reserved safety stock percentage (optional)
- D. Source system (required)
正解:B、D
解説:
When setting up a replenishment planning cluster, the location hierarchy is necessary for structuring replenishment relationships, while specifying a reserved safety stock percentage is optional. The Source system setting is not required within the cluster definition context but is typically a part of the broader replenishment configuration ORACLE
質問 # 97
When creating a new replenishment plan, what are the required plan options?
- A. Segment Group. Segments. Policy Assignment Set
- B. Segment Group. Segments. Inventory Policies. Policy Assignment Set
- C. Segment Group. Segments. Inventory Policies
- D. Segment Group. Inventory Policies. Policy Assignment Set
正解:A
質問 # 98
Which four options can be set as a Demand Schedule in Supply Planning plan options? (Choose four.)
- A. Approved Final Transfer Order Forecast
- B. Final Bookings Forecast
- C. Approved Final Bookings Forecast
- D. Final Transfer Order Forecast
- E. Approved Final Shipments Forecast
- F. Final Shipments Forecast
正解:B、C、E、F
質問 # 99
A global company is subject to differing regulations regarding hazardous materials in a product. Version 1 of the product can be sold in North America and Europe. Version 2 of the product can only be sold in Europe.
Which sequence of setups could help a planner ensure that supply is available in a timely fashion per these constraints?
- A. Define region and version as planning attributes; create an attribute-based netting rule using region and version; associate the rule to a supply plan; run the plan.
- B. Define region and version as planning attributes; map them to collectible attributes; create an attribute-based netting rule using region and version; associate the rule to a supply plan; run the plan.
- C. Create an attribute-based netting rule using region and version; map the rule to collectible attributes; associate the rule to a supply plan; run the plan.
- D. Define segment groups based on region and version; execute segmentation; map the segmentation results to an attribute-based netting rule; associate the rule to a supply plan; run the plan.
正解:D
質問 # 100
What does the Advanced Plan Option check box "Consider currency conversion rates to plan revenue" do?
- A. It enables supply plans with planning method constrained to prioritize constrained products based on higher price and to consider exchange rates.
- B. It enables backlog plans to prioritize constrained products based on higher price and to consider exchange rates.
- C. For supply and sales and operations plans, it enables prioritization of constrained products based on higher price and to consider exchange rates.
- D. It enables sales and operations plans with constrained products to prioritize products based on higher price and to consider exchange rates.
正解:C
解説:
The "Consider currency conversion rates to plan revenue" option allows both supply and sales and operations plans to factor in currency conversion rates. This enables prioritization based on product pricing in different currencies, which is particularly useful in multinational operations where pricing and revenue planning depend on exchange rate variations
質問 # 101
Your client uses product categories and global sourcing rules for supply planning. However, their newest product doesn't follow these rules. For a specific item in the category, it needs to be sourced from a different supplier globally.
How should they set this up for the easiest maintenance, going forward?
- A. Create a new global sourcing rule for the item; assign it to the assignment set at the item-organization level; leave the category as is for the remainder of the products.
- B. Create a new global sourcing rule for the item; assign it to the assignment set at the item-organization level; alter the category to be category-organization for the remainder of the products.
- C. Create a new local sourcing rule for the item; assign it to the assignment set at the item level; leave the category as is for the remainder of the products.
- D. Create a new global sourcing rule for the item; remove the category level assignments and create new item level assignments for all items in the category pointing each to the correct global sourcing rule.
- E. Create a new global sourcing rule for the item; assign it to the assignment set at the item level; leave the category as is for the remainder of the products.
正解:E
質問 # 102
Which two are valid settings when defining a replenishment planning cluster?
- A. Source system (required)
- B. Reserved safety stock percentage (optional)
- C. Sweep location (required)
- D. Location hierarchy (required)
正解:B、D
解説:
When setting up a replenishment planning cluster, the location hierarchy is necessary for structuring replenishment relationships, while specifying a reserved safety stock percentage is optional. The Source system setting is not required within the cluster definition context but is typically a part of the broader replenishment configuration
ORACLE
.
質問 # 103
......
更新された検証済みの1z0-1066-24問題集と解答で合格保証もしくは全額返金:https://jp.fast2test.com/1z0-1066-24-premium-file.html