You want to use automatic conversion of purchase requisitions into purchase orders for some raw materials.
What are the prerequisites?
Note: There are 3 correct answers to this question.
- A. The Automatic Purchase Order indicator is set in the plant-specific purchasing data of the material master record.
- B. A source of supply containing valid conditions is assigned to the purchase requisition.
- C. The Automatic Purchase Order indicator is set in the purchasing data of the business partner master record.
- D. A contract with plant-specific conditions exists for the material and the vendor.
- E. A plant-specific source list entry exists for the material.
正解:A、C、E
質問 # 36
Which of the following tasks does the system perform during reorder point planning? Note: There are 2 correct answers to this question.
- A. Flag materials that have been subject to an activity relevant to MRP
- B. Carry out a net requirement calculation for every material included in the planning run
- C. Carry out a lot-size calculation for every material with net requirements
- D. Perform backward scheduling to determine the availability dates of purchase requisitions
正解:B、C
解説:
Explanation
During reorder point planning, the system performs a net requirement calculation for every material included in the planning run and carries out a lot-size calculation for every material with net requirements. The system does not flag materials that have been subject to an activity relevant to MRP or perform backward scheduling to determine the availability dates of purchase requisitions2 References: SAP Help Portal - Reorder Point Planning
質問 # 37
What are some advantages of a stock transport order compared to a stock transfer posting between two plants?
Note; There are 3 correct answers to this question.
- A. You can post goods receipt in consignment.
- B. You can post goods receipt to consumption.
- C. You can plan delivery costs.
- D. You can issue from inspection stock.
- E. You can create stock transport requisitions via MRP.
正解:B、C、E
解説:
Explanation
A stock transport order is a special type of purchase order that allows you to transfer stock between two plants.
Compared to a stock transfer posting, a stock transport order has some advantages, such as:
You can create stock transport requisitions via MRP, which means you can plan the stock transfer based on the demand and supply situation of the plants1.
You can post goods receipt to consumption, which means you can directly consume the transferred stock without updating the inventory2.
You can plan delivery costs, which means you can include the transportation costs in the valuation of the transferred stock. References: SAP Help Portal, SAP Community, [SAP Blogs]
質問 # 38
What are some of the prerequisites to use a stock determination strategy for a material in inventory management? Note: There are 3 correct answers to this question.
- A. Customize a stock determination rule and assign it to the storage type
- B. Assign a stock determination group in the material master record
- C. Assign a stock determination strategy to the material type in Customizing
- D. Assign a stock determination rule to the business transaction in Customizing
- E. Customize a cross-application strategy for stock determination
正解:B、D、E
質問 # 39
Your purchasing department is interested in working with scheduling agreements. What valid information can you share with them regarding release creation profiles? Note; There are 3 correct answers to this question.
- A. A release creation profile controls the aggregation of schedule line quantities in a delivery schedule.
- B. A release creation profile controls the periodicity of delivery schedule
- C. You can enter a release creation profile in the supplier master data.
- D. You can enter a release creation profile in a purchasing info record.
- E. A release creation profile triggers the creation of scheduling agreement schedule lines.
正解:A、B、D
質問 # 40
What is the effect of setting the Freeze Book Inventory indicator in a physical Inventory document header?
- A. The system blocks all inventory management units of the physical inventory document for ^ procurement.
- B. The system blocks all inventory management units of the physical inventory document for ^ goods movements.
- C. The book inventory is determined and fixed in the physical inventory document at the ^ beginning of the count.
- D. The book inventory is determined and fixed in the physical inventory document at the time of ^ the difference posting.
正解:C
解説:
Explanation
The Freeze Book Inventory indicator in a physical inventory document header fixes the book inventory in the physical inventory document at the beginning of the count. This means that any goods movements that occur after the count date are not reflected in the book inventory quantity. References: SAP S/4HANA Sourcing and Procurement | SAP Learning, Course S4510, Unit 5, Lesson 1.
質問 # 41
Where does SAP S/4HANA store low-level code? Note:There are 2 correct answers to this question.
- A. Planning file
- B. Bill of material
- C. Production version
- D. Material Master
正解:A、B
解説:
Explanation
SAP S/4HANA stores low-level code in the following objects:
Bill of material (BOM), which is a structured list of components that make up a product or assembly.
Planning file, which is an internal table that contains information about materials that need to be planned by MRP. References: SAP S/4HANA Sourcing and Procurement | SAP Learning, Course S4525, Unit 1, Lesson 1.
質問 # 42
In your project, you need to make sure that consignment purchase orders utilize a different number range than other purchase orders. What must you do?
- A. Customize a new document category, assign a new number range, and assign the item category for consignment only to this category
- B. Customize a new document type, assign a new number range, and assign the item category for consignment only to this type
- C. Customize a new document type, assign a new number range object, and assign the item category for consignment to this type
- D. Customize a new document category, assign a new number range object and assign the item category for consignment only to this category
正解:B
質問 # 43
Your purchasing department wants to monitor overdue purchase orders. What are the prerequisites for issuing delivery reminders for a purchase order? Note: There are 3 correct answers to this question.
- A. Submit purchase order to the supplier
- B. Maintain a confirmation control key in the supplier master
- C. Maintain purchasing value keys in the purchase order item
- D. Configure message determination and maintain message records
- E. Maintain reminder periods in the purchase order item
正解:B、D、E
質問 # 44
You create a contract item for a material group. You want to prevent certain materials that belong to this material group frorn being ordered with reference to this contract item.
How can you ensure this?
- A. Create material-specilic source lists for the contract item ana set tne Exclusion indicator.
- B. Create material -specilk: source lists for the supplier and set the Blocked indicator.
- C. Create material.-specific source lists for the contract item and set the Fix indicator.
- D. Create material -specific source lists outside the validity peftod of tie contract.
正解:C
解説:
Explanation
To prevent certain materials that belong to a material group from being ordered with reference to a contract item, you can use the following method:
Create material-specific source lists for the contract item and set the Fix indicator, which means that you specify the materials that are allowed to be ordered with reference to the contract item and make them mandatory. References: SAP S/4HANA Sourcing and Procurement | SAP Learning, Course S4520, Unit
2, Lesson 1.
質問 # 45
Whal must you do to implement split valuation?
Note: There are 2 correct answers to this Question
- A. Create additional accounting data for the relevant materials.
- B. Customize valuation categories and valuation types.
- C. Assign valuation types to stock types.
- D. Add valuation types to all open purchase order iterns.
正解:A、B
解説:
Explanation
To implement split valuation, you must do the following:
Customize valuation categories and valuation types, which are the key elements of split valuation. A valuation category defines the criteria for splitting the valuation of a material, such as origin or quality.
A valuation type is a subdivision of a valuation category that represents a specific stock type, such as country of origin A or B. You can customize valuation categories and valuation types in Customizing under Materials Management -> Valuation and Account Assignment -> Split Valuation -> Configure Split Valuation.
Create additional accounting data for the relevant materials, which means that you must maintain the valuation data for each valuation type at valuation-area level. The valuation data includes the valuation price, total stock quantity, and total stock value for each valuation type. You can create additional accounting data for the relevant materials in the material master under Accounting 1 view.
References: Split Valuation in Inventory Management | SAP Help Portal
質問 # 46
Inventory Management and Physical Inventory
What are some characteristics of a goods issue posting to a production order?
Note: There are 2 correct answers to this question.
- A. The reservation is deleted as a result of the goods issue.
- B. The goods issue can only be a planned goods issue.
- C. Actual costs are allocated to the production order.
- D. The goods issue can be posted as a backflush.
正解:C、D
質問 # 47
You have concluded a cleaning contract with a supplier for your operating facility. You aQreed on a monthly amount for which you want to automatically create a credit note every month. What do you usein this scenario?
- A. Scheduling agreement
- B. Invoicing plan
- C. Value contract
- D. Blanket purchase order
正解:B
解説:
Explanation
You use an invoicing plan in this scenario. An invoicing plan is a method of creating invoicesautomatically at predefined intervals or dates without referring to any service entry sheets or goods receipts. You can use an invoicing plan for blanket purchase orders or contracts that have a fixed amount and validity period.
References: [SAP S/4HANA Sourcing and Procurement | SAP Learning], Course S4520, Unit 2, Lesson 1.
質問 # 48
You send newly created purchase orders to a supplier via EDI. whereas quantity or price changes are transmitted by email.What prerequisites must be met if you are using the condition technique for message determination? Note: There are 3 correct answers to this question.
- A. The dispatch time related to the change message needs to be set to 1 (send with periodically scheduled job).
- B. The condition record contains the Price and Quantity fields.
- C. The Price and Quantity fields are relevant for printout changes.
- D. You have configured different message types for the New and Change print options.
- E. The New Message Determination Process for Change Messages indicator is flagged in Customizing.
正解:C、D、E
質問 # 49
What are the different types of SAP Fiori apps? Note: answers to this question.
- A. Interactive
- B. Analytical
- C. Transactional
- D. Fact sheet
- E. KPI report
正解:B、C、D
解説:
Explanation
The different types of SAP Fiori apps are analytical, fact sheet, and transactional. Analytical apps provide real-time insights into key performance indicators, fact sheet apps display contextual information and key facts about central objects, and transactional apps allow users to perform transactions or change settings. KPI report and interactive are not valid types of SAP Fiori apps.References: [SAP Help Portal - Types of SAP Fiori Apps]
質問 # 50
......
試験合格保証付きのSAP Certified Application Associate C-TS452-2022試験問題集:https://jp.fast2test.com/C-TS452-2022-premium-file.html
SAP C-TS452-2022日常練習試験は2025年最新のに更新された82問あります:https://drive.google.com/open?id=1huQOadzqKCMwDpw53ehfvpjCLmS0XMam