[2024年12月04日] 合格SAP Certified Associate C-TS4CO-2023試験問題集には85問があります [Q35-Q55]

Share

[2024年12月04日] 合格SAP Certified Associate C-TS4CO-2023試験問題集には85問があります

究極ガイドの無料準備SAP C-TS4CO-2023試験問題と解答


SAP C-TS4CO-2023 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Organizational Assignments and Process Integration: The topic focuses on cross-company code design, production execution, sales pricing, inbound freight, stock transfers, and transfer pricing.
トピック 2
  • Managing Clean Core: The topic discusses process agility, adaptation efforts, and acceleration of innovation.
トピック 3
  • Cost Object Controlling: This topic addresses the concepts of determining and configuring cost object controlling. It also discusses cost object controlling, WIP, results analysis, variances and revenue recognition.
トピック 4
  • Profit Center Accounting: It covers organizational charts, Profit Centers, data assignments, and period-end closing for PCA.
トピック 5
  • Profitability Analysis: It includes sub-topics related to fields, characteristics, actual and process flow and security requirements, currency, chart of accounts, result analysis and revenue recognition.
トピック 6
  • Internal Order Accounting: This topic focuses on order category, order type, commitments, internal orders, settlement rules, and period-end closing for IOA.
トピック 7
  • Product Cost Planning: This topic discusses product cost planning, cost elements structure, cost component structure, planning requirements, costing variants and multi-level costings.

 

質問 # 35
How does SAP S/4HANA capture costs? Note: There are 2 correct answers to this question.

  • A. Only primary costs are captured in general ledger accounts.
  • B. Primary and secondary costs are captured in general ledger accounts.
  • C. Secondary costs are captured as secondary cost element, and not as general ledger accounts.
  • D. All primary and secondary costs are captured by creating them as cost elements.

正解:B、D


質問 # 36
Which scenarios can be covered by one single costing run? Note: There are 2 correct answers to this question.

  • A. Standard cost estimate of all the materials in all plants of a controlling area
  • B. Current cost estimate of all the materials in all controlling area
  • C. Inventory cost estimate of all the materials in one plant
  • D. Product cost collector cost estimate in one plant

正解:C、D


質問 # 37
In the Product Cost by Order process, what does the system calculate depending on the order status?

  • A. WIP at target costs or variances
  • B. WIP at percentage of completion (PoC) method or variances
  • C. WIP at actual costs or variances
  • D. Both WIP and variances

正解:C


質問 # 38
You are implementing SAP S/4HANA and you want to run analytical reports off a single data model. Which statement best describes reporting in SAP S/4HANA?

  • A. Reporting can be either broad and deep for analysis, or speedy and simple, but not both.
  • B. Reporting on data in real time is difficult, and complex to design.
  • C. Reporting on data is available in real-time at every level of detail.
  • D. Reporting analytical data is always done in a business warehouse system.

正解:C


質問 # 39
How can you configure the transfer price solution in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Use separate currency types within the same ledger for each valuation.
  • B. Use separate segments for each valuation.
  • C. Use separate CO versions for each valuation.
  • D. Use separate ledgers for each valuation.

正解:C、D


質問 # 40
You are setting up costing-based Profitability Analysis for your organization. How do you configure the deferent market segments?

  • A. As divisions
  • B. As value fields
  • C. As characteristics
  • D. As key Figures

正解:C


質問 # 41
In SAP S/4HANA, you have decided to activate only account-based profitability analysis for your organization. You want to settle costs and revenue of a sales order item to a profitability segment. What do you need to configure?

  • A. Cost component structure
  • B. Source structure
  • C. Allocation structure
  • D. PA transfer structure

正解:D


質問 # 42
For which of the following situations would you need to implement the transfer price solution in SAP S4/NANA?

  • A. Parallel variation views of the same logistical flows are needed to differentiate between legal and profit center valuation.
  • B. Parallel accounting is needed in order to be compliant with different accounting principles.
  • C. Parallel costing is needed in order to calculate separate costs of goods manufactured for different accounting principles.
  • D. Parallel price calculation and invoicing are needed to facilitate intercompany reconciliation.

正解:A


質問 # 43
You want to understand why cost are collected on sales order item level. What do you need to in the configuration? Note: There are 3 correct answers to this question.

  • A. Requirement type
  • B. Account assignment category
  • C. Requirements class
  • D. Valuation variant
  • E. Costing type

正解:A、B、C


質問 # 44
You are setting up a direct internal activity allocation in SAP S4/HANA. What is valid receivers for the activity? Note: There are 3 correct answers to this question.

  • A. Sales order item
  • B. Profit center
  • C. WBS element
  • D. General ledger account
  • E. Internal order

正解:A、C、E


質問 # 45
Which parameters are controlled by the costing type in a costing variant? Note: There are 2 correct answers to this question.

  • A. Save with date key
  • B. Price for materials
  • C. Price updates
  • D. Costing sheet

正解:A、C


質問 # 46
You would like to allocate primary and secondary costs from a cost center to another cost center. Which allocation method will you use?

  • A. Periodic reposting
  • B. Direct activity allocation
  • C. Assessment
  • D. Distribution

正解:C


質問 # 47
Which type(s) of Profitability Analysis update (s) the cost of goods sold at the time of delivery only?

  • A. Margin analysis
  • B. Both margin analysis and costing-based
  • C. Combined profitability analysis
  • D. Costing-based

正解:A


質問 # 48
What are some of the characteristics of planning for internal orders? Note: There are 2 correct answers to this question.

  • A. Availability control can check against plan values.
  • B. You can enter costs and revenues.
  • C. You can define tolerance limits for plan overspend.
  • D. You can plan multiple versions.

正解:B、D


質問 # 49
What are some of the objectives of Profitability Analysis? Note: There are 2 correct answers to this question.

  • A. Provide the company with a detailed view of its financial statements by areas of responsibilities.
  • B. Allow the company to determine standard costs and revenues according to the period accounting method.
  • C. Provide the company with information on the performance of its market segments.
  • D. Allow the company to determine if the sales force achieved their contribution margin goals.

正解:C、D


質問 # 50
Which setting in the cost center master data do you use to assign the same attributes to similar cost center?

  • A. Standard hierarchy node
  • B. Object class
  • C. Cost center category
  • D. Cost center type

正解:C


質問 # 51
Which of the following objects can be selected in templates for activity-based costing? Note: There are 2 correct answers to this question.

  • A. Cost center/activity type
  • B. Business process
  • C. WBS element
  • D. Internal order

正解:C、D


質問 # 52
You post a billing document for a sales order with sales order controlling. What data flows to Profit Center Accounting? Note: There are 2 correct answers to this question.

  • A. Sales deductions
  • B. Order quantity
  • C. Payment Discount
  • D. Revenues

正解:A、D


質問 # 53
You want to prevent reporting extreme periodic fluctuations in your P&L statement. Which Management Accounting activity should you choose to help spread irregular expenses throughout the fiscal year?

  • A. Indirect activity allocation
  • B. Accrual calculation
  • C. Budget availability control
  • D. Periodic reporting

正解:B


質問 # 54
What can you configure in the settlement profile? Note: There are 2 correct answers to this question.

  • A. Define a number range for settlement document.
  • B. Determine an overhead key.
  • C. Define document management parameters.
  • D. Determine whether settlement is required.

正解:C、D


質問 # 55
......

合格させるC-TS4CO-2023テストエンジンとPDFで完全版無料問題集:https://jp.fast2test.com/C-TS4CO-2023-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어