質問 # 69
(Select 2) What are the ways to evolve the Solution Intent from variable to fixed scope?

  • A. Adapting WIP limits
  • B. Modeling
  • C. Creating work breakdown structures.
  • D. Building prototypes

正解:B、D


質問 # 70
What does innovation accounting mean?

  • A. Being sure to account for the investment in new product initiatives on a P&L.
  • B. Defining, empirically measuring, and communicating the true progress of innovation.
  • C. Capitalizing the cost of software development using Story points.
  • D. Demoing Stories that come out of the IP Iteration.

正解:B


質問 # 71
(Select 3) How do you demo a spike?

  • A. Showing the knowledge gained by the spike.
  • B. Showing the quantitative data that will prove useful in developing future user stories.
  • C. Showing the functioning code in the production environment.
  • D. Spikes are strictly for internal learning of the team and do not need to be demoed.
  • E. Showing a prototype produced for the spike.

正解:A、B、E


質問 # 72
What are stretch objectives?

  • A. Objectives that the business has promised to their Customers.
  • B. Objectives that are identified during the PI.
  • C. Objectives that are part of the team's capacity but not necessarily achievable during the PI.
  • D. Objectives that are beyond the capacity of the team and so are uncommitted for the PI.

正解:C


質問 # 73
(Select 2) Why is Architectural Runway important?

  • A. It supports a stable velocity.
  • B. It iteratively evolves the architecture to meet changing needs.
  • C. It allows for nontechnical changes
  • D. It provides the documentation on which Features and Capabilities are built.

正解:A、B


質問 # 74
What is NOT a SAFe-recommended practice for DevOps?

  • A. Continuously synchronize all Feature and team branches.
  • B. Deploy to staging every sprint.
  • C. Start automating the actual deployment process.
  • D. Put everything under version control.
  • E. Build and maintain a production-equivalent staging environment.
  • F. Maintain development and test environments to better match production.
  • G. Create the ability to automatically build environments.

正解:A


質問 # 75
Phase-gate Milestones are not a good predictor of project performance.

  • A. True
  • B. False

正解:A


質問 # 76
Select 3) Which behaviors are typically associated with Lean-Agile Leaders?

  • A. Support decentralized decision-making.
  • B. Emphasize lifelong learning.
  • C. Establish clear objectives for managing.
  • D. Develop Solutions.
  • E. Protect subordinates from interference by outside stakeholders.

正解:A、B、E


質問 # 77
A Program Epic that originates from a Portfolio Epic takes precedence over all local priorities on that train.

  • A. False
  • B. True

正解:A


質問 # 78
What contributes to establishing trust in SAFe?

  • A. Transparency.
  • B. Reporting.
  • C. Decentralization of control.
  • D. U-curve optimization.
  • E. Servant leadership.

正解:A


質問 # 79
A Program Epic requires budgetary approval and a lightweight business case only if it spans multiple PIs.

  • A. False
  • B. True

正解:A


質問 # 80
(Select 2) What are the characteristics of queues and backlogs?

  • A. Queues are continuously refined and cannot be re-prioritized.
  • B. Backlog items are estimated; queues are not.
  • C. Backlogs are continuously refined and can be re-prioritized.
  • D. Queues are processed in the order in which items are entered.

正解:C、D


質問 # 81
(Select 2) What would you examine when identifying Value Streams in an enterprise moving to SAFe?

  • A. The project cost accounting procedures in place.
  • B. The number of ARTs which would be contained in the Portfolio.
  • C. The current products which the company sells.
  • D. The internal departments which are supported.

正解:C、D


質問 # 82
You organization decided to thoroughly implement the SAFe Principle "Assume variability; preserve options."
What is the optimum path for success?

  • A. Assume variability of scope and preserve options for the release date.
  • B. Preserve flexibility in system functionality and design, but have fixed Solution intent.
  • C. Assume variability of scope, but have fixed Solution Context.
  • D. Preserve flexibility in both system functionality and design.

正解:D


質問 # 83
What is the primary purpose of the management meeting at the end of Day 1 of PI Planning?

  • A. To assign business value to the teams' draft PI Objectives.
  • B. To design the next generation of the product.
  • C. To make adjustments to the PI scope and address program challenges.
  • D. To evaluate the performance of teams.

正解:C


質問 # 84
......

Scaled Agile SAFe-SPC問題集PDFのベストを目指すなら問題集を使おう 目指そう高得点:https://jp.fast2test.com/SAFe-SPC-premium-file.html

SAFe Practice Consultant SAFe-SPC試験と認定テストエンジン:https://drive.google.com/open?id=1SA3U7spmNYLsQW5QQ3NEUY7mg7KiNSsq


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어