質問 # 69
(Select 2) What are the ways to evolve the Solution Intent from variable to fixed scope?
- A. Adapting WIP limits
- B. Modeling
- C. Creating work breakdown structures.
- D. Building prototypes
正解:B、D
質問 # 70
What does innovation accounting mean?
- A. Being sure to account for the investment in new product initiatives on a P&L.
- B. Defining, empirically measuring, and communicating the true progress of innovation.
- C. Capitalizing the cost of software development using Story points.
- D. Demoing Stories that come out of the IP Iteration.
正解:B
質問 # 71
(Select 3) How do you demo a spike?
- A. Showing the knowledge gained by the spike.
- B. Showing the quantitative data that will prove useful in developing future user stories.
- C. Showing the functioning code in the production environment.
- D. Spikes are strictly for internal learning of the team and do not need to be demoed.
- E. Showing a prototype produced for the spike.
正解:A、B、E
質問 # 72
What are stretch objectives?
- A. Objectives that the business has promised to their Customers.
- B. Objectives that are identified during the PI.
- C. Objectives that are part of the team's capacity but not necessarily achievable during the PI.
- D. Objectives that are beyond the capacity of the team and so are uncommitted for the PI.
正解:C
質問 # 73
(Select 2) Why is Architectural Runway important?
- A. It supports a stable velocity.
- B. It iteratively evolves the architecture to meet changing needs.
- C. It allows for nontechnical changes
- D. It provides the documentation on which Features and Capabilities are built.
正解:A、B
質問 # 74
What is NOT a SAFe-recommended practice for DevOps?
- A. Continuously synchronize all Feature and team branches.
- B. Deploy to staging every sprint.
- C. Start automating the actual deployment process.
- D. Put everything under version control.
- E. Build and maintain a production-equivalent staging environment.
- F. Maintain development and test environments to better match production.
- G. Create the ability to automatically build environments.
正解:A
質問 # 75
Phase-gate Milestones are not a good predictor of project performance.
- A. True
- B. False
正解:A
質問 # 76
Select 3) Which behaviors are typically associated with Lean-Agile Leaders?
- A. Support decentralized decision-making.
- B. Emphasize lifelong learning.
- C. Establish clear objectives for managing.
- D. Develop Solutions.
- E. Protect subordinates from interference by outside stakeholders.
正解:A、B、E
質問 # 77
A Program Epic that originates from a Portfolio Epic takes precedence over all local priorities on that train.
- A. False
- B. True
正解:A
質問 # 78
What contributes to establishing trust in SAFe?
- A. Transparency.
- B. Reporting.
- C. Decentralization of control.
- D. U-curve optimization.
- E. Servant leadership.
正解:A
質問 # 79
A Program Epic requires budgetary approval and a lightweight business case only if it spans multiple PIs.
- A. False
- B. True
正解:A
質問 # 80
(Select 2) What are the characteristics of queues and backlogs?
- A. Queues are continuously refined and cannot be re-prioritized.
- B. Backlog items are estimated; queues are not.
- C. Backlogs are continuously refined and can be re-prioritized.
- D. Queues are processed in the order in which items are entered.
正解:C、D
質問 # 81
(Select 2) What would you examine when identifying Value Streams in an enterprise moving to SAFe?
- A. The project cost accounting procedures in place.
- B. The number of ARTs which would be contained in the Portfolio.
- C. The current products which the company sells.
- D. The internal departments which are supported.
正解:C、D
質問 # 82
You organization decided to thoroughly implement the SAFe Principle "Assume variability; preserve options."
What is the optimum path for success?
- A. Assume variability of scope and preserve options for the release date.
- B. Preserve flexibility in system functionality and design, but have fixed Solution intent.
- C. Assume variability of scope, but have fixed Solution Context.
- D. Preserve flexibility in both system functionality and design.
正解:D
質問 # 83
What is the primary purpose of the management meeting at the end of Day 1 of PI Planning?
- A. To assign business value to the teams' draft PI Objectives.
- B. To design the next generation of the product.
- C. To make adjustments to the PI scope and address program challenges.
- D. To evaluate the performance of teams.
正解:C