[2024年01月09日] 合格率取得する秘訣はASDEV01認定試験エンジンPDF
ASDEV01試験問題集合格できるには更新された2024年01月テスト問題集
ASDEV01試験は、Blue Prismプラットフォームの機能、機能、および能力を含む知識をテストするために設計されています。Blue Prismを使用してソフトウェアロボットを開発、設計、展開する能力、およびロボットプロセス自動化のためのベストプラクティスや業界標準の方法論に関する知識もテストされます。
質問 # 27
Drag and drop the Blue Prism stage names on the left into the placement boxes (A - E) so that the dropped stage names correspond with the image of the Blue Prism stage beside it:
正解:
解説:
Explanation
A. Note Stage B. Process Stage C. Action Stage D. Block Stage E. Multi Calc The note stage has an icon of a yellow sticky note, the process stage has an icon of a blue circle with a white arrow, the action stage has an icon of a blue circle with a white lightning bolt, the block stage has an icon of a blue rectangle with a white X, and the multi calc stage has an icon of a blue circle with a white calculator1.
References: 1 https://bpdocs.blueprism.com/bp-6-8/en-us/stage-types.htm
質問 # 28
In Blue Prism, what is a stage Expression?
- A. An output from a Decision stage
- B. A formula which is used to produce a value
- C. The description of a Blue Prism stage
- D. The output from a Calculation stage
正解:B
解説:
Explanation
A stage expression is a formula that can be entered into any stage in Blue Prism to produce a value or perform an action. It can use variables, functions, operators and constants to create complex expressions that can manipulate data or control the flow of the process
https://portal.blueprism.com/sites/default/files/2021-05/Blue%20Prism%20Certification%20-%20Associate%20
質問 # 29
What is the difference between a Collection and an Undefined Collection?
- A. A Collection is added to a Process flow diagram during development, whereas an Undefined Collection is added to the diagram dynamically when the Process runs
- B. A Collection has the column name and data types assigned during development whereas with an Undefined Collection, column names and data types are automatically assigned when the Process runs
- C. There is no difference between a Collection and an Undefined Collection
正解:B
解説:
Explanation
This is the correct difference between a Collection and an Undefined Collection. The other options are either incorrect or describe the same feature of both types of collections. References:
https://portal.blueprism.com/sites/default/files/2021-05/Blue%20Prism%20Certification%20-%20Associate%20D (page 14)
質問 # 30
Which of the following statements best describes a Blue Prism Local Data Item?
- A. Blue Prism Data items which can be accessed from any Page in the same Process
- B. Blue Prism Data items which can be accessed from any Page in any Process in the same local environment
- C. Blue Prism Data items which can only be accessed from the Page in the Process where the item is placed
- D. Blue Prism Data items which can only be accessed from the Mam Page of the Process
正解:C
解説:
Explanation
This is the correct definition of a local data item. The other options are either incorrect or describe different types of data items. References:
https://portal.blueprism.com/sites/default/files/2021-05/Blue%20Prism%20Certification%20-%20Associate%20D (page 13)
質問 # 31
User name and password information which is used by a Blue Prism Process to log into a business application, should be stored where?
- A. In a local hidden file
- B. In Data Items in the Process
- C. In a password protected file
- D. Environment Variable
- E. In Credential Manager
- F. In a shared Excel file
正解:E
解説:
Explanation
This is the correct place to store user name and password information that is used by a Blue Prism process to log into a business application. It allows the developer to securely store and manage credentials that can be used by multiple processes and objects. The other options are either insecure or not supported by Blue Prism.
References:
https://bpdocs.blueprism.com/bp-6-10/en-us/helpDebug.htm?TocPath=Interface%7CStudio%7CProcess%20stud (page 4)
質問 # 32
Which of the following statements are correct when considering an element's attributes in Application Modeller?
(Select all items which apply)
- A. Attributes which are included in the element match criteria contain a tick in the Match column of Application Modeller
- B. The attribute list will always contain the same entries regardless of the target application or element
- C. The attributes displayed in Application Modeller are provided to Blue Prism by the target business application
- D. The initial selection of attributes made by Blue Prism will always be the optimum attribute set to use to match the element
正解:A、C
解説:
Explanation
These statements are correct because they describe how Blue Prism identifies and interacts with the elements of the target application using the attributes provided by the application. The other statements are incorrect because Blue Prism does not always select the optimum attribute set and the attribute list may vary depending on the application or element type. References:
https://portal.blueprism.com/sites/default/files/2021-05/Blue%20Prism%20Certification%20-%20Associate%20D (page 12)
質問 # 33
Examine the following Business Object Action diagram:
The purpose of the Action is to process new orders through the order processing system. Order details of provided to the Action by the Process and stored in the 'Order Data' Collection According to Blue Prism best practices, what is wrong with this Action?
- A. A Wait stage is missing after the 'Write Order Details' stage
- B. A Wait stage is missing between the 'Click Submit' stage and the 'End' stage
- C. An Action description has not been provided
- D. A Single Row Collection cannot receive data from a Process
- E. A Wait stage is missing between the 'Start' stage and the 'Write Order Details' stage
正解:A
解説:
Explanation
A Wait stage is needed after the 'Write Order Details' stage to ensure that the application has time to process the order details before clicking the Submit button. Without a Wait stage, the automation may fail due to timing issues. References:
https://portal.blueprism.com/sites/default/files/2021-05/Blue%20Prism%20Certification%20-%20Associate%20D (page 11)
質問 # 34
Which of the following are benefits of using a Blue Prism Work Queue in a Process design?
(Select all items which apply)
- A. All Work Queue data is available to view by all Blue Prism users through Control Room
- B. Provides data which can be used for effective reporting about items which have been processed
- C. Enables secure storage and management of items being processed
- D. Enables robust audit information about items which have been processed
- E. Enables the same Work Queue item to be processed by the multiple Digital Workers at the same time
正解:B、C、D
解説:
Explanation
These are the correct benefits of using a Blue Prism work queue in a process design. They allow the process to handle large volumes of data efficiently and securely, and provide useful information for analysis and improvement. The other options are incorrect because work queue data is not available to all users, and work queue items cannot be processed by multiple digital workers at the same time. References:
https://portal.blueprism.com/sites/default/files/2021-05/Blue%20Prism%20Certification%20-%20Associate%20D (page 16)
質問 # 35
Examine the following Process flow:
The data item 'City V is configured as a Text data item and has an initial value of 'LiverpooI'.
The data item 'City 2' is configured as a Text data item and has an initial value of 'Manchester'.
The data item 'City 3* is configured as a Text data item and has an initial value of 'London'.
The data item 'List of Cities' is configured as a Text data item and has no initial value.
The 'Calc 1' stage is configured as follows:
What will the value of the list of Cities' data item be after the Process flow has run?
- A. Manchester. London
- B. An Exception will be thrown as a data item with a Text data type cannot store a list of text values
- C. Liverpool Manchester.London
正解:C
解説:
Explanation
The calculation stage will append the values of City 1, City 2 and City 3 to the List of Cities data item, separated by spaces. The text data type can store words or phrases as well as numerical identifiers, and it has no character limit if the data is input by another method than manual1. References: 1
https://bpdocs.blueprism.com/bp-7-0/en-us/helpDatatypes.htm
質問 # 36
Which of the following activities can be performed via the Queues area of Blue Prism Control Room*?
(Select all items which apply)
- A. Review the Work Queue Status
- B. Update a Work Queue item to Complete
- C. Lock a Work Queue item
- D. Update an Work Queue item to Exception
- E. Unlock a Work Queue item
- F. Change a Work Queue item 'Deferral Date'
正解:A、B、D、E、F
解説:
Explanation
These are the correct activities that can be performed via the Queues area of Blue Prism Control Room. They allow the user to monitor and manage the work queue items manually or based on business rules. The other option is incorrect because a work queue item can only be locked by the process that is processing it.
References:
https://portal.blueprism.com/sites/default/files/2021-05/Blue%20Prism%20Certification%20-%20Associate%20D (page 16)
質問 # 37
Process rules or logic are evaluated in Blue Prism using which type of stage?
- A. Validate
- B. Logic
- C. Calculation
- D. Decision
- E. Evaluate
正解:D
解説:
Explanation
A decision stage is used to evaluate process rules or logic and branch the process flow based on the outcome of the evaluation. A decision stage can have multiple outcomes and can use expressions to compare values or check conditions1. References: 1
https://portal.blueprism.com/sites/default/files/2021-05/Blue%20Prism%20Certification%20-%20Associate%20
質問 # 38
Which of the following values are valid Blue Prism Control Room session status values'?
- A. Paused
- B. Running
- C. Terminated
- D. Finished
- E. Faulted
- F. Pending
- G. Suspended
正解:B、C、D、E、F
解説:
Explanation
They indicate the current state of a process session that is being executed by a digital worker. The other options are either invalid or not related to session status. References:
https://bpdocs.blueprism.com/bp-6-10/en-us/helpDebug.htm?TocPath=Interface%7CStudio%7CProcess%20stud (page 3)
質問 # 39
What is a Blue Prism Process?
- A. A graphical representation of a working computer program which automates manual repetitive tasks
- B. A business flow diagram
- C. A computer application
- D. A business flow chart
正解:A
解説:
Explanation
A Blue Prism process is a graphical representation of a working computer program that automates manual repetitive tasks using business objects and stages. A process can be run by an operator or scheduled by a control room2. References: 2 https://www.koenig-solutions.com/blue-prism-associate-developer-course
質問 # 40
A Blue Prism Decision stage needs to test the value of a column in the current row of a Collection The Collection is named 'Account Data' The Column is named 'Account Type' What is the correct way to reference the required column value in the Collection row. from within the Decision stage?
- A. [Account Type]
- B. {Account Type}
- C. Collection="Account Data. Column=Account Type,"
- D. {Account Data Account Type)
- E. [Account Data Account Type]
正解:E
解説:
Explanation
This is the correct way to reference the required column value in the collection row from within the decision stage. It uses square brackets to enclose the collection name and the column name. The other options are either incorrect or used for different purposes. References:
https://portal.blueprism.com/sites/default/files/2021-05/Blue%20Prism%20Certification%20-%20Associate%20D (page 14)
質問 # 41
Which of the following are true about the use of Blue Pnsm Process templates'?
(Select all items which apply)
- A. There is no requirement to train Process Developers in Blue Prism development
- B. Process development time is reduced by using a template
- C. Templates are auto generated scripts that perform interactions with business applications therefore there is no additional development time
- D. They promote proven Blue Prism Best Practices
- E. They provide consistency across all processes, making processes easier to understand and support
正解:B、D、E
解説:
Explanation
These are the correct benefits of using a Blue Prism process template. It allows the developer to follow a standard structure and design for all processes, and save time and effort by reusing common elements. The other options are either incorrect or describe different scenarios. References:
https://portal.blueprism.com/sites/default/files/2021-05/Blue%20Prism%20Certification%20-%20Associate%20D (page 9)
質問 # 42
......
Blue Prism ASDEV01認定試験は世界的に認識されており、RPA業界で非常に価値があります。この認定プログラムは、卓越性のマークと見なされており、Blue Prism RPAテクノロジーの個人の習熟度を示しています。世界中の雇用主は、この認定の価値を認識し、RPA関連の職に雇用する際にこの認定を保持している個人を多くの人を探します。
ASDEV01テスト問題練習は2024年最新のに更新された51問あります:https://jp.fast2test.com/ASDEV01-premium-file.html