2024年最新のに更新されたのはC-IBP-2311テストエンジンとPDFで完全版無料問題集保証! [Q27-Q46]

Share

2024年最新のに更新されたのはC-IBP-2311テストエンジンとPDFで完全版無料問題集保証!

最新のSAP Certified Application Associate C-IBP-2311実際の無料試験問題

質問 # 27
What are the S&OP operator (optimizer) parameters associated with demand fair share?

  • A. Number of fair share segments Additional tiering costs (default) Number of fair share segments late delivery
  • B. Number of fair share segments Maximum days of coverage Number of fair share segments late delivery
  • C. Number of fair share segments Additional tiering costs (default) Inventory days of supply
  • D. Number of fair share segments Additional tiering costs (default) Maximum inventory

正解:A


質問 # 28
Which type of master data represents the Master Data Type Component?

  • A. Virtual mater data type
  • B. External Master Data Type
  • C. Compound Master Data Type
  • D. Reference Master data type

正解:D


質問 # 29
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note:
There are 2 correct answers to this question.

  • A. Necessary target key figures value are disaggregated
  • B. Necessary source key figures values are disaggregated.
  • C. Copying multiple key figures can be processed sequentially
  • D. Copying multiple key figures on different planning levels is not possible.

正解:A、C


質問 # 30
What actions can be performed in the Advanced Dashboards application? Note: There are 3 correct answers to this question.

  • A. Rename the charts
  • B. Use drill-down functionality
  • C. Add Process instances
  • D. Display all assigned analytics on a single UI
  • E. Link two analytics charts.

正解:B、C、D


質問 # 31
Which sourcing methods are required to identify the product flow through the network? Note:
There are 3 correct answers to this question.

  • A. Sourcing via Demand Prioritization
  • B. Customer sourcing Rule
  • C. Sorucing via Costs
  • D. Unspecified Sourcing
  • E. Sourcing via Production

正解:B、C、E


質問 # 32
What is a prerequisite for modelling outsourced manufacturers with production capacity using the Supply Optimizer?

  • A. Use production lead times and offsets to manage components at the outsourced manufacturing location
  • B. Model relative production costs across internal locations and outsourced manufacturing locations
  • C. Model target inventory and stocks at the outsourced manufacturing location
  • D. Ensure that the outsourced manufacturing locations have a separate subnetwork

正解:B


質問 # 33
A time profile is defined with these levels: day, technical week, week, month, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?

  • A. IF (,,PERIODID2"="SSPERIODID2CUSS...)
  • B. IF ("PERIODID4"="SSPERIODIDICUSS...)
  • C. IF ("PERIODIDl"="SSPERIODIDICUSS...)
  • D. IF (,,PERIODID3"="SSPERIODID2CUSS...)

正解:B


質問 # 34
How many different time levels can be selected within one planning view?

  • A. All time levels available in the time profile, restricted by global configuration parameter
  • B. All time levels available in the time profile
  • C. The number of time levels is restricted to four to avoid negative effects on performance
  • D. Only time levels from the base planning level of selected key figures

正解:A


質問 # 35
How do you achieve rolling aggregation with SAP IBP?

  • A. Using an appropriate period weight factor
  • B. Using a local member
  • C. Using a key figure calculation
  • D. Using an attribute as a key figure

正解:C


質問 # 36
The Planner Workspaces is an important User Interface of SAP IBP for Supply Chain. What are the value drivers to use this as a planner? Note: There are 3 correct answers to this question

  • A. It combines various components into one user interface
  • B. It combine the data from multiple planning area into one user interface
  • C. Issues can be identified and solved with special functions
  • D. Application job can be started from this user interface
  • E. It can trigger SAP S/4HANA transactions in real time.

正解:B、C、D


質問 # 37
You are implementing SAP IBP for sales and operations and are researching forecast mode algorithms. What are some of the algorithms that can be used? Note: There are 2 correct answers to this question

  • A. Sporadic demand models algorithms
  • B. Trend models algorithms
  • C. Naive models algorithms
  • D. Data-cleansing algorithms

正解:B、C


質問 # 38
What are some of the prerequisites for configuring a planning area that results in a successful consistency check? Note: There are 2 correct answers to this question.

  • A. Assign the compound master data type and its component master data types
  • B. Specify a planning horizon in the planning area for each level of the assigned time profile
  • C. Configure at most two input key figures on the same planning level in a key figure calculation
  • D. Configure at least one calculated key figure for the planning area

正解:A、B


質問 # 39
Which of the following data can be tracked using a change-history-enabled key figure? Note: There are 3correct answers to this question

  • A. Attributes
  • B. Modified code
  • C. Reason code
  • D. Key figure type
  • E. Scenario ID

正解:A、B、C


質問 # 40
Which SAP IBP planning operator can be run to delete planning objects in a certain version?

  • A. Purge Key Figure Data Outside Planning Area Planning Horizon
  • B. Purge Master Data
  • C. Purge Key Figure Data
  • D. Purge Non-Confirming Data

正解:C


質問 # 41
What is an example of a commonly used time-independent key figure?

  • A. A currency conversion key figure, such as Exchange Rate
  • B. A unit of measure key figure, such as UoM Conversion Factor
  • C. Any attribute as a key figure
  • D. A Special key figure marked as an aggregate key figure (aggregate constraint)

正解:B、C


質問 # 42
What is the feature of the weighted average key figure calculation?

  • A. The first parameter of the formula acts as a weight
  • B. The numerator's value should include multiplication by the weight.
  • C. The numerator of the calculation should be stored.
  • D. Attributes can be used in weighted average key figure calculation

正解:B


質問 # 43
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)? Note: There are 3 correct answers to this question

  • A. Maximum lot size
  • B. Aggregated constraints
  • C. Minimum lot size
  • D. Transportation lead time
  • E. Adjusted transportation receipts

正解:C、D、E


質問 # 44
You are starting a new implementation project for SAP IBP and are considering the possible system architecture. What are the possible approaches for setting up the system landscape? Note: There are 2correct answers to this question

  • A. Setup the two-tier landscape and have the configuration for development system regularly - updated from the production system
  • B. Create additional planning areas in the test system to support training needs.
  • C. Set up a three-tier landscape using transport, starting from the development system to test and - production
  • D. Create additional test planning areas in the production system to support cutover needs

正解:B、C


質問 # 45
You are configuring disaggregation for the KF 1 key figure in the Planning Areas Model Configuration app. Which methods can you use? Note: There are 3 correct answers to this question

  • A. Disaggregation in batch triggered by an application job
  • B. Disaggregation according to a helper key figure
  • C. Proportional disaggregation by using KF2 in the expression
  • D. Disaggregation according to an equal split
  • E. Disaggregation according to user-defined expression

正解:C、D、E


質問 # 46
......


SAP C-IBP-2311 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Describe how IBP extends the logic of S&OP in the network using advanced demand
  • Display, create, copy, edit, check, and activate a planning area
トピック 2
  • Create and use key figures and attributes to model the supply chain
  • Define and view information with user-defined charts and dashboards
トピック 3
  • General Configuration of a Planning Area
  • Optimize inventory in the supply chain utilizing algorithms that derive inventory targets
トピック 4
  • Solution Architecture & Data Integration
  • Configure and use Planning Operators to automate processes in your planning model

 

C-IBP-2311問題集には更新された練習テストと80独特な問題:https://jp.fast2test.com/C-IBP-2311-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어