
[2023年12月11日] 最速合格には素晴らしいC_TS414_2021無料テストPDF本日更新です
無料でゲット!最新の2023年最新の有効な練習SAP Certified Application Associate C_TS414_2021問題と解答でテストエンジン
SAPのC-TS414-2021試験には80問の多肢選択問題があり、制限時間は180分です。試験合格率は65%です。この試験は英語、日本語、韓国語、簡体字中国語で利用可能です。
質問 # 49
Which following inspection origin are directly related to sale and distribution (SD) functions 3 correct answers
- A. Plant maintenance
- B. Good receipts
- C. Delivery to customer with customer order
- D. General delivery
- E. Goods issue
正解:B、C、D
質問 # 50
For what type of cost collector does an inspection lot capture appraisal and non conformity costing?
- A. A company code general ledger
- B. A quality management order
- C. A quality Notification
- D. A controlling general ledger
正解:B
質問 # 51
What causes the system to issue a message to prevent you from closing a notification?
- A. Open tasks
- B. Open activities
- C. Missing complaint quantity
- D. Missing catalog profile
正解:A
質問 # 52
During which of the following steps in a business process does a dynamic modification rule change severely
- A. The creation of a inspection Lot
- B. The creation of a notification
- C. The creation of a certification
- D. Creation of a batch
正解:A
質問 # 53
Which Status allows you to make a usage decision without using the force inspection competition function for all mandatory characteristic results.
- A. 0
- B. 1
- C. 2
- D. 3
正解:B
質問 # 54
You have determined a new business inspection process and need to customize a new inspection type Which of the following activities must you complete? Correct 2
- A. Assign Task list type to material types
- B. Define goods movement type
- C. Assign inspection type to inspection lot origin
- D. Define default values for inspection type
正解:C、D
質問 # 55
Which process step can automatically create a quality notification?
- A. Creation of an inspection Lot
- B. Creation of quality info record
- C. Making a UD
- D. Characteristics result recording
正解:D
質問 # 56
Your customer plan to use Test Equipment Management as part of QM.
What event triggers the creation of an inspection lot for calibration inspection?
- A. Release of a maintenance order
- B. Assignment of Equipment to a maintenance plan
- C. Creation of maintenance order
- D. Scheduling a maintenance plan
正解:A
質問 # 57
During an inspection the lab technicians record the same test values for an inspection characteristic.
Which of the following do they assign to the products?
- A. As an inspection point
- B. As a batch
- C. As a sample size
- D. As a partial lot
正解:A
質問 # 58
Which QM master data must you maintain to separate a sample into a primary and reserve sample?
- A. Sample drawing procedure
- B. Sample size
- C. Sample determination
- D. Sample processes
正解:A
質問 # 59
Which automatic interface does the system use to record results during production with notification
- A. Quality management information system (QMIS)
- B. Process industry - process control system (PI-PCS)
- C. Quality management -impaction data interface (QM-IDI)
- D. Quality management =- statistical interface (QM-ST)
正解:C
質問 # 60
Your customer requires the lab to use quantitate characteristics during a production result recording.
Which result confirmation control indicators are available for quantitative results
- A. Summarized
- B. Class confirmation
- C. Mean value
- D. Tolerance keys
- E. Single value
正解:A、B、E
質問 # 61
What are the prerequisites for automatic creation of an inspection lot when your customer returns goods? Note : 2 correct answer
- A. \/ O Qm is active in relevant movement type
- B. V HZ! The relevant inspection type is active in the material
- C. O Qm is active in customer master
- D. Qm is active in Quality info record
正解:A、B
質問 # 62
You create a supplier claim notification with reference to material document year, number and item from a goods receipt for the PO What information is copied to the notification?
Note : 3 correct answer
- A. Purchasing document number and item
- B. Advanced Shipping number
- C. Material number
- D. Quantity and unit
- E. Inspection lot number
正解:A、C、D
質問 # 63
You want to print a certificate for an outbound delivery, at which level is a certificate printed?
- A. material level
- B. Delivery Item level
- C. Shipping point level
- D. Delivery header level
正解:B
質問 # 64
In the material master, at which organizational level do you create Quality management (QM) data for inspection type.
- A. Client level
- B. Business area level
- C. Plant level
- D. Company code level
正解:C
質問 # 65
Which object must combined in test scheduling in the stability study Correct 3
- A. Physical samples
- B. Strategy
- C. Physical drawing procedure
- D. Initial sample
- E. Inspection plans
正解:A、B、E
質問 # 66
You have assigned a dynamic modification level to an inspection plan, which dynamic modification criterion is pre-defined and not editable?
- A. Customer
- B. Material
- C. Manufacturer
- D. Vendor
正解:A
質問 # 67
......
C_TS414_2021問題集PDFで100%合格保証付き:https://jp.fast2test.com/C_TS414_2021-premium-file.html
最新C_TS414_2021のPDF問題集リアル無料テスト本日更新です:https://drive.google.com/open?id=1P83KgfFnFrn9-3APom9cmGS-_yHNa3b2