[2023年12月] 最新のMicrosoft MB-335認定練習テスト問題
確認済みMB-335問題集と解答で一年間無料最速更新
質問 # 37
A manufacturer is implementing Dynamics 365 Supply Chain Management to create blends of oil and industrial lubricant.
The manufacturer requires detailed documentation for the production order process before manufacturing begins for the products. The shop floor must review, approve, and anticipate all production runs. Before production starts, the manufacturer wants to ensure that the order can be completed by a certain timeframe based on capacity.
You need to define the production life cycle stages.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
正解:
解説:
Explanation
To define the production life cycle stages, you should perform the following actions in sequence:
Create a production order. A production order is a document that authorizes the production of a specific product or product variant in a given quantity on a specific date1. You can create a production order manually, from a sales order line, or from master planning execution2.
Estimate the order. Estimating a production order calculates the material and capacity requirements for the order based on the bill of materials (BOM) and the route3. You can also estimate the cost and revenue of the order based on the planned consumption and output.
Schedule production jobs. Scheduling production jobs determines the start and end dates and times for each operation in the route based on the available capacity, efficiency, and calendar of the resources.
You can use either operations scheduling or job scheduling methods to schedule production jobs.
Release the order. Releasing a production order makes it available for picking, production, and reporting activities. You can release an order manually or automatically based on a release rule that specifies criteria such as site, warehouse, status, priority, or start date.
Generate a picking list. A picking list is a document that lists the materials that must be picked from inventory and consumed for production. You can generate a picking list for an entire production order or for selected jobs or operations within an order.
1: Production process overview 2: Production order lifecycle overview 3: Estimate a production order :
[Estimate cost and revenue for a production order] : [Schedule production jobs] : [Scheduling methods] :
[Release a production order] : [Release rules] : [Picking list overview] : [Generate picking lists]
質問 # 38
You are using the manufacturing execution module in Dynamics 365 Supply Chain Management. License plate labels must be printed for products in the Report as finished step. You need to use the manufacturing execution functionality that meets this requirement. What should you use?
- A. Production waves
- B. License plates
- C. Job card device
- D. Operations schedules
正解:B
解説:
Explanation
The manufacturing execution functionality that meets the requirement of printing license plate labels for products in the Report as finished step is License plates are unique identifiers that are assigned to containers, pallets, or individual items in inventory. License plates can be used to track and manage inventory throughout the warehouse processes, such as receiving, put away, picking, packing, and shipping1. License plates can also be used in production processes, such as reporting as finished and raw material picking2.
To print license plate labels for products in the Report as finished step, you must enable the Generate license plate option on the mobile device menu item that is used for reporting as finished2. You must also set up a document routing layout and a document routing for license plate labels3. When you use the mobile device to report a production order as finished, the system will generate a license plate for the finished product and print a license plate label to the specified printer2. The license plate label can include information such as the item number, batch number, quantity, and barcode of the finished product3.
1: License plates 2: Enable license plate label printing 3: Document routing label layouts
質問 # 39
You need to configure costing for raw materials used to manufacture unscented cleaning solution.
Which form should you use?
- A. Pricing template
- B. Quantity and margin template
- C. Pricing calculation
- D. Cost basis type
正解:B
解説:
Reference:
https://docs.microsoft.com/en-us/dynamicsax-2012//quantity-and-margin-template-form?
redirectedfrom=MSDN
質問 # 40
A company uses engineering change management in Dynamics 365 Supply Chain Management. The Product readiness checks feature is turned off.
An existing engineering product must be reconfigured for a new product readiness policy.
You need to change the product readiness policy.
Where should you make this change?
- A. product configuration model
- B. default order settings
- C. released product
- D. shared product
- E. engineering category
正解:C
解説:
Product readiness policies are assigned to products at the released product level1. A released product is a product that has been released to one or more legal entities and can be used in transactions2.
To change the product readiness policy for an existing engineering product, you must go to the Product readiness tab on the Released product details page and select a different policy from the Readiness policy field1.
The other options are not correct, because they are not related to product readiness policies. Default order settings are used to define how a product is ordered, received, and sold2. A shared product is a product that is defined in the shared product master and can be released to multiple legal entities2. An engineering category is a category that is used to group engineering products by their characteristics3. A product configuration model is a model that defines the options and rules for configuring a product.
質問 # 41
You are a production manager at a company which produces large batches of coffee and creamers.
After a quality inspection, batch 120008 of your cold brew coffee (item number CB-0001) was found to be too acidic and must be reworked.
You need to add 20 grams of sugar and stir the product for an additional 0.S hours.
What three actions are required on the rework order? Each correct answer presents pan of the solution.
NOTE: Each correct selection is worth one point.
- A. Delete all items from the production formula except for 20 grams of sugar.
- B. Add a route operation for 0.5 run time hours of stirring.
- C. Add 20 grams of sugar to the production formula.
- D. Delete all route operations except for a half an hour stirring operation.
- E. Manually reserve batch 120008 after estimating the batch order.
正解:B、C、D
解説:
The correct answer is B, C, and E. Here is the explanation:
To rework a batch order in Dynamics 365 Supply Chain Management, you need to create a new batch order and set the Rework batch toggle to Yes1. You also need to select the Batch number of the original batch that needs to be reworked1. The new batch order will have only one formula line that represents the original batch, and no route operations1.
To add 20 grams of sugar and stir the product for an additional 0.5 hours, you need to do the following actions on the rework order:
Add 20 grams of sugar to the production formula. You can do this by clicking on the Formula option on the All production orders form and adding a new formula line for sugar with a quantity of 20 grams1. You can also specify the ingredient type for sugar, such as Compensating or Filler2.
Add a route operation for 0.5 run time hours of stirring. You can do this by clicking on the Route option on the All production orders form and adding a new route operation for stirring with a run time of 0.5 hours1. You can also specify the resource or resource group that will perform the stirring operation3.
Delete all route operations except for a half an hour stirring operation. You can do this by clicking on the Route option on the All production orders form and deleting any existing route operations that are not related to stirring1. This way, you can avoid unnecessary steps and costs for the rework order.
質問 # 42
A beverage company uses Dynamics 365 Supply Chain Management batch processing for production- You need to identify the ingredient type used in batch processing when the base attribute of a product is added to a formula line.
What is the ingredient type?
- A. none
- B. compensating
- C. filler
- D. active
正解:D
解説:
The ingredient type used in batch processing when the base attribute of a product is added to a formula line is Active. Here is the explanation:
A formula line is a line that identifies an ingredient or item that makes up a formula. A formula line can have one of these ingredient types: None, Active, Compensating, or Filler1. The ingredient type determines how the system handles the line during master planning and batch order production1.
The Active ingredient type indicates that the item is an active ingredient that has a variable quantity and a fixed potency. The active ingredient of a product is modeled by using a product-specific batch attribute that has a minimum value, a maximum value, and a target level2. The target level of a batch attribute represents the estimated percentage of an active ingredient in a product2.
When the base attribute of a product is added to a formula line, it means that the product has an active ingredient that is defined by the base attribute. Therefore, the ingredient type for the formula line should be Active. This way, the system can calculate the amount of ingredients to use in a production batch based on the concentration of active ingredients in selected product batches2. This process is known as batch balancing2.
1: Batch balancing 2: Formulas and formula versions
質問 # 43
You need to implement the scheduled Kanban requirements.
Which rules should you use? To answer, drag the appropriate rules to the correct requirements. Each rule may be used once, more than once, or not at all. You may need to drag the spirt bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
正解:
解説:
Explanation
A close-up of a document Description automatically generated
質問 # 44
You work for a gem wholesaler that sells raw diamonds. Diamonds are purchased and sold in individual boxes but weighed and inventoried in carats.
You are setting up a catch weight item for diamonds. Each box of diamonds must be tracked by its individual container weight.
You need to set up this item as a full visibility catch weight item.
Which two steps must you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Create an inter-class unit of measure conversion between boxes and carats.
- B. Assign a Tracking dimension group with batch number as the only active tracking dimension.
- C. Assign the item a Tracking dimension group with active serial number control
- D. Assign it a Serial number group with per qty. defined as 1.
正解:A、C
解説:
A catch weight item is an item that is sold by one unit of measure but is managed in inventory by a different unit of measure1. For example, diamonds are sold by boxes but weighed by carats. A full visibility catch weight item is a catch weight item that requires the weight of each individual container to be tracked2. For example, each box of diamonds must have its own weight recorded.
To set up a catch weight item for diamonds, you must do the following steps2:
Assign the item a Tracking dimension group with active serial number control. This enables the item to be tracked by serial numbers, which represent the individual containers of the item. Each serial number will have its own weight associated with it.
Assign the item a Serial number group with per qty. defined as 1. This ensures that each container of the item has a unique serial number and that only one container can be assigned to a serial number.
Create an inter-class unit of measure conversion between boxes and carats. This defines the relationship between the sales unit and the inventory unit of the item. The conversion factor can be based on a nominal weight or an average weight of the containers.
質問 # 45
You need to address the ignition switch issue.
Which three actions should you perform? Each answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Set product readiness to automatic.
- B. Change product lifecycle state.
- C. Copy link and products.
- D. Set product readiness to manual,
- E. Define business impact.
正解:B、D、E
解説:
Topic 5, Adatum CorporationAdatum Corporation is a multi-entity
corporation located in Seattle, Washington in the United States. The
company is a leading producer of specialty cakes and cookies. The
company also manufactures specialty chocolates that use ethically
sourced ingredients from around the world. The company plans to
launch a new product line of organic chocolates later this year.
Adatum plans to implement Dynamics 365 Finance and Dynamics 365 Supply Chain Management to manage financials, inventory, and manufacturing capabilities across the entire organization.
* Manufactured products are stored at the distribution warehouses until they are shipped to customers.
* Individually branded pre-packaged cake and cookie mixes are supplied to specialty cafes and restaurants.
The mixes are shipped directly to the cafes and restaurants from the production factories.
* The company maintains a fleet of trucks and also subcontracts shipments between the factories and warehouses to outside vendors.
* The mixes and specialty chocolates are based on standard recipes that use precise ingredient ratios. There are strict rules around ingredient substitutions.
* All mixes use one of three base recipes as their foundation: BaseA, BaseB. and BaseC. Additional ingredients, spices, and flavorings are then added to make the final product.
* BaseA and BaseB are made in large batches and stored until they are used in the other mixes.
* Mixes with BaseA have a shelf life of six months due to the type of flour it uses.
* Specialty chocolates are manufactured only during the holiday season.
* Specialty desserts are offered during the holiday season. This year, customers may specify additional icing colors and cake layers when placing orders. Depending on the popularity of two of the new colors, they may be offered the next year.
* Cocoa oil that is extracted during the production of some of the specialty chocolates is used in the BaseB foundation mix.
* Cleaning and setup of machinery between products has been causing delays in production.
* Prices of raw ingredients such as sugar can fluctuate greatly depending on seasonal and worldwide demand.
* To properly record profitability, ail raw materials use the first in, first out (FIFO) costing method, while finished products are recorded at standard costs.
* Large fluctuations have been occurring at month end in costs reported due to the inability to track production runs that span from month-to-month.
* Leftover flour and sugar from production runs are collected, packaged, and donated to local food banks if the amount is too small to use in other runs.
* To maintain Adatum's certification as a manufacturer of ethically sourced ingredients, the traceability of every ingredient in all products to their source must be tracked.
* All products must be randomly tested for adherence to quality standards for ingredient makeup and weight.
* Similar recipes must be able to be produced in succession to limit machinery cleaning and setup times.
* All costs must be tracked for each production run and be able to be reconciled at the end of the monthly accounting cycle, including any work in process (WIP) costs and donations.
* The organic chocolate line must be set up. The ingredients cannot be mixed with non-organic ingredients in inventory.
* Mixes are generally stored and sold in 16-ounce bags. Some quantities are sold and distributed in 5. 10. and
20-gallon containers to large restaurants.
* Each mix has a single unique item number and is tracked per batch produced.
* Specialty chocolate products must be stored in climate-controlled areas of the warehouse.
* QA TesterA discovers during a random test that the batch of a mix does not contain the necessary amount of IngredientB.
* VendorZ, who transports finished goods from PlantA to Warehouses, is consistently late picking up product.
* OperatorA must consolidate partial mix batch group runs into saleable package quantities.
* UserB must set up the mix items.
* UserC learns that mixes containing BaseA have been stamped with a batch date from the flour vendor and is not being calculated from the mix manufacturing date. The mixes from the past month that might be impacted need to be identified and the calculation needs to be corrected.
* UserD must update the costs of finished goods. Accounting wants labor calculated in WIP based on how much time an individual spends performing the operation, as well as the finished goods to post to a specific different ledger account.
* UserE must set up and maintain the cost of sugar.
* UserF must decrease downtime for the machinery.
* UserG must plan the specialty desserts for the current holiday season.
質問 # 46
A discrete manufacturer uses the time and attendance registration for production operations.
All employees register daily clock in and clock out times during a 40-hour. Monday through Friday workweek.
Pay periods are every two weeks. Workers are paid hourly.
The production manager will create work schedules with the following windows:
* Mandatory work hours
* Work hours during which employees can leave early without accruing absences
* Work hours during which employees can work extra time
If a junior production worker works over 90 hours in a pay period. the worker will receive lime and a half over 80 hours. If a senior production worker works over 90 hours in a pay period, the worker will receive double time over 80 hours.
Vou need to configure the system for these requirements.
Where should you configure this functionality? To answer, drag the appropriate forms to the correct requirements. Each form may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
正解:
解説:
質問 # 47
A beverage company uses Dynamics 365 Supply Chain Management batch processing for production- You need to identify the ingredient type used in batch processing when the base attribute of a product is added to a formula line.
What is the ingredient type?
- A. none
- B. compensating
- C. filler
- D. active
正解:D
解説:
Explanation
The ingredient type used in batch processing when the base attribute of a product is added to a formula line is Active. Here is the explanation:
A formula line is a line that identifies an ingredient or item that makes up a formula. A formula line can have one of these ingredient types: None, Active, Compensating, or Filler1. The ingredient type determines how the system handles the line during master planning and batch order production1.
The Active ingredient type indicates that the item is an active ingredient that has a variable quantity and a fixed potency. The active ingredient of a product is modeled by using a product-specific batch attribute that has a minimum value, a maximum value, and a target level2. The target level of a batch attribute represents the estimated percentage of an active ingredient in a product2.
When the base attribute of a product is added to a formula line, it means that the product has an active ingredient that is defined by the base attribute. Therefore, the ingredient type for the formula line should be Active. This way, the system can calculate the amount of ingredients to use in a production batch based on the concentration of active ingredients in selected product batches2. This process is known as batch balancing2.
1: Batch balancing 2: Formulas and formula versions
質問 # 48
You need to configure the system for plastic operations.
Which two parts should be manually reported as finished? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. mold tooling
- B. machined plastic pieces
- C. excess plastic
- D. unmachined plastic pieces
正解:B、D
質問 # 49
You need to set up the state control for sales of motorcycles.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Create an inclusive restricted product list for United States. Do not add the motorcycle part to the list.
- B. Create an exclusive restricted product list for California and add the motorcycle part to the list.
- C. Create an inclusive restricted product list for United States and add the motorcycle part to the list.
- D. Create an exclusive restricted product list for Missouri and add the motorcycle part to the list.
正解:B、C
解説:
Reference:
https://stoneridgesoftware.com/working-with-restricted-products-in-dynamics-365-operations/
質問 # 50
You are a production manager at a company which produces large batches of coffee and creamers.
After a quality inspection, batch 120008 of your cold brew coffee (item number CB-0001) was found to be too acidic and must be reworked.
You need to add 20 grams of sugar and stir the product for an additional 0.S hours.
What three actions are required on the rework order? Each correct answer presents pan of the solution.
NOTE: Each correct selection is worth one point.
- A. Delete all items from the production formula except for 20 grams of sugar.
- B. Add a route operation for 0.5 run time hours of stirring.
- C. Add 20 grams of sugar to the production formula.
- D. Delete all route operations except for a half an hour stirring operation.
- E. Manually reserve batch 120008 after estimating the batch order.
正解:B、C、D
解説:
The correct answer is B, C, and E. Here is the explanation:
To rework a batch order in Dynamics 365 Supply Chain Management, you need to create a new batch order and set the Rework batch toggle to Yes1. You also need to select the Batch number of the original batch that needs to be reworked1. The new batch order will have only one formula line that represents the original batch, and no route operations1.
To add 20 grams of sugar and stir the product for an additional 0.5 hours, you need to do the following actions on the rework order:
Add 20 grams of sugar to the production formula. You can do this by clicking on the Formula option on the All production orders form and adding a new formula line for sugar with a quantity of 20 grams1. You can also specify the ingredient type for sugar, such as Compensating or Filler2.
Add a route operation for 0.5 run time hours of stirring. You can do this by clicking on the Route option on the All production orders form and adding a new route operation for stirring with a run time of 0.5 hours1. You can also specify the resource or resource group that will perform the stirring operation3.
Delete all route operations except for a half an hour stirring operation. You can do this by clicking on the Route option on the All production orders form and deleting any existing route operations that are not related to stirring1. This way, you can avoid unnecessary steps and costs for the rework order.
質問 # 51
You need to configure the requirements for metal fabrication equipment maintenance. What must you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
正解:
解説:
質問 # 52
A company uses distributed hybrid topology within their Dynamics 365 Supply Chain Management system.
The company plans to build a manufacturing plant on a mountain to be closer to a required mineral source.
Internet connectivity is unreliable, and availability of bandwidth speed is limited. The company plans to deploy an operational edge scale unit for the plant to address the connectivity issue.
You need to determine where production operations can be performed.
Which method should you recommend?
To answer, drag the appropriate methods to the correct requirements. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
正解:
解説:
Explanation
To determine where production operations can be performed, you should recommend the following methods:
Record the start of production: You should recommend the Production floor execution interface method. This method allows workers to register their daily work, such as when they start a job, report feedback about jobs, register indirect activities, and report absence1. Workers can use the production floor execution interface to sign in with their badge IDs and select the jobs that they want to start from the All jobs tab1. They can also view the details and instructions for each job, and report good quantities and scrap1.
Report the number of production units completed and finished goods put away: You should recommend the Production floor execution interface and Warehouse Management mobile app methods. These methods allow workers to report the completion of production jobs and the movement of finished goods to inventory. Workers can use the production floor execution interface to complete a job by selecting it from the Active jobs tab and tapping Complete1. They can also print labels for the finished goods if required2. Workers can use the Warehouse Management mobile app to scan or enter license plates for the finished goods and put them away in a location3. They can also perform other warehouse operations, such as picking, packing, receiving, and cycle counting3.
Report time spent training a new employee about line operation: You should recommend the Production floor execution interface method. This method allows workers to register indirect activities that are not related to a specific production job, such as training, meetings, or maintenance1. Workers can use the production floor execution interface to register an indirect activity by tapping Indirect activity on the toolbar and selecting an activity type from the list1. They can also enter a quantity or duration for the activity, and add a comment if needed1.
1: How workers use the production floor execution interface 2: Print labels 3: Install and connect the Warehouse Management mobile app
質問 # 53
......
最新の2023年最新の実際に出ると確認されたMB-335問題集で100%無料MB-335試験問題集:https://jp.fast2test.com/MB-335-premium-file.html
無料提供中2023年最新の無料更新されたMicrosoft MB-335試験問題と解答:https://drive.google.com/open?id=1dm3J-yZUnwzSMs1BXOrPKwjgbBxCUIlG