[2023年12月]更新のC1000-056問題集PDFでC1000-056リアル試験問題解答 [Q32-Q48]

Share

[2023年12月]更新のC1000-056問題集PDFでC1000-056リアル試験問題解答

C1000-056問題集で100%合格保証と最新のお試しサンプル

質問 # 32
What are two methods for configuring a Highly Available IBM App Connect Enterprise installation?

  • A. Multi-instance integration nodes with IBM MQ
  • B. High Availability mode
  • C. Network deployment mode
  • D. A Microsoft Cluster Server
  • E. Integration node clustering

正解:A、D


質問 # 33
What is the correct order of steps to create an Integration Service from scratch?

正解:

解説:

Explanation
To create an integration service by defining a new interface, complete the following steps:
* Open the New Integration Service wizard by using one of the following methods:
* Click File > New > Integration Service.
* In the Application Development view, click New > Start by creating an integration service.
* Right-click the white space of the Application Development view then click New > Integration Service.
* Enter a name for the integration service, and optionally a description.
* To specify how you want to define the interface for your integration service, select Define it myself using the integration service editor
* Specify where you want to store your interface definition.
* If the definition will be used by this integration service only, store the definition in the integration service project.
* If the definition might be used by multiple integration services, store the definition in a shared library.
Procedure


質問 # 34
What are two mechanisms for storing user permissions to enable administration security on the Web Console?

  • A. OAuth
  • B. YAML
  • C. Queue
  • D. File
  • E. LDAP

正解:B、E


質問 # 35
What Event Coordination option must be implemented in the Collector node so that message collections are propagated in the order they have been completed?

  • A. Disabled
  • B. All complete collections
  • C. First complete collection
  • D. FIFO

正解:B


質問 # 36
Which role can add a binding to a policy set in IBM App Connect Enterprise?

  • A. Policyowner
  • B. Developer
  • C. Administrator
  • D. Policy Holder

正解:C


質問 # 37
What is the best practice approach for storing shared development resources?

  • A. Libraries
  • B. Tables
  • C. Message Map
  • D. Files

正解:A


質問 # 38
What are two valid destination options for a Trace node?

  • A. File
  • B. Local Error Log
  • C. IBM MQ queue
  • D. Events
  • E. System Trace

正解:A、B

解説:
Explanation
https://www.ibm.com/support/knowledgecenter/SSMKHH_10.0.0/com.ibm.etools.mft.doc/ac04840_.htm


質問 # 39
Which IBM App Connect Enterprise component interacts with version control systems?

  • A. Integration Server
  • B. IBM App Connect Enterprise toolkit
  • C. Integration Node
  • D. IBM App Connect Enterprise Web User Interface

正解:B


質問 # 40

According to the API resource pictured above, there are three possible HTTP Return Codes: 400, 404, 200.
What is one way to set a HTTP Return code as 400 using ESQL?

  • A. SET OutputLocalEnvironment.REST.Reply.Transport.HTTP = 400;
  • B. SET OutputLocalEnvironment.Destination.HTTP.ReplyStatusCode = 400;
  • C. SET OutputLocalEnvironment.Reply.Transport.HTTP = 400;
  • D. SET OutputLocalEnvironment.ReplyStatusCode = 400;

正解:B


質問 # 41
Which statement is true about shared libraries?

  • A. If a shared library (A) references another shared library (B), shared library (B) can create a reference to shared library (A)
  • B. Static libraries can reference shared libraries but cannot reference other static libraries
  • C. Integration Projects can reference shared libraries
  • D. A shared library must be deployed with or before an application that references it

正解:B


質問 # 42
Which prerequisite task must be done before encrypting a connection to an MQTT server?

  • A. Create a connection from the MQTT server to the SSL server.
  • B. Configure the Security identity property on the MQTT server to use encrypted message flow.
  • C. Configure the MQTT server to communicate using JMT encryption.
  • D. Create a truststore and import the MQTT server public certificate into the truststore.

正解:D


質問 # 43
The following flow is implemented in an online retailer's system to expose a web service that would process new orders then send shipping request(s) to the shipping carrier.
The shipping request messages should be put on a queue in the shipping carrier's secured SSL-enabled remote queue manager. What are two ways to set up the SSL connection to the remote queue manager?

  • A. Check the "Use SSL" property in the MQ Output node properties
  • B. Create and configure an MQEndpoint policy to use SSL and attach it to the MQ Output node
  • C. Check the "Use HTTPS" property in the MQ Output node
    C Check the "Alternate User Authority" property in the MQ node
  • D. Configure an SSL-enabled Security Identity by using the mqsisetdbparms command, then use that identity in the MQ Output node properties

正解:B


質問 # 44
Which command creates basic user credentials to allow logging into the web user interface?

  • A. mqsiwebaceuseradmin
  • B. mqsiwebuseradmin
  • C. mqsiacldwebuseradmin
  • D. mqsiuseradmin

正解:A


質問 # 45
Where are recorded messages sent by default in the flow exerciser?

  • A. They are sent to the output node where each message was saved
  • B. They are sent to the Recorded Messages item located in the navigator
  • C. They are sent to the input node where each message was saved
  • D. They are sent to the Message Flow icon in the Flow Exerciser toolbar

正解:D


質問 # 46
Event-driven flows can be configured to run at regular intervals by adding which type of node in IBM App Connect Designer?

  • A. Scheduler
  • B. Timer
  • C. Event
  • D. Execute

正解:A


質問 # 47
When developing RESTful APIs, what is the main purpose of the RESTAsyncRequest node?

  • A. Allows a REST request to be issued to a SOAP API and return control to the flow without waiting for a response
  • B. Allows a REST request to be issued to a REST API and return control to the flow without waiting for a response
  • C. Allows a REST operation request to be exposed asynchronously and return control to the client without waiting for a response C Allows a REST operation request to be exposed asynchronously and return control to the flow without waiting for a response

正解:B

解説:
Explanation
You can use a RESTAsyncRequest node in a message flow to issue a REST request to an external REST API, and return control to the flow without waiting for a response. The response is received by a RESTAsyncResponse node, which can be in a separate message flow but must be in the same integration server. The nodes are used as a pair, and correlate responses against the original requests by using a unique identifier, which is specified on both nodes.
https://www.ibm.com/support/knowledgecenter/SSMKHH_10.0.0/com.ibm.etools.mft.doc/bz90920_.html


質問 # 48
......


IBM C1000-056試験は、IBM APP Connect Enterprise V11を使用してソリューションを開発するためにスキルと知識を検証しようとする専門家向けに設計されています。これは、メッセージフローの開発、IBMアプリConnect Enterpriseの展開と構成、さまざまなテクノロジーを使用した他のシステムとの統合など、さまざまなトピックをカバーする包括的な試験です。この試験に合格すると、ビジネス要件を満たすソリューションを設計、開発、展開する候補者の能力が示されています。


IBM C1000-056は、IBM App Connect Enterprise V11を使用してソリューションを開発するスキルを実証することに関心のあるソフトウェア開発者向けに設計された認定試験です。この試験は、IBM App Connect Enterprise V11を使用してソリューションを設計、開発、テストする候補者の能力を検証することを目的としています。認定試験を正常に完了すると、クライアントの要件を満たすソリューションを開発する候補者の習熟度が実証されます。

 

問題集でリアルIBM C1000-056試験問題 [更新されたのは2023年]:https://jp.fast2test.com/C1000-056-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어