質問 # 19
You want to create a new standard cost estimate based on the quantity structure of the existing standard cost estimate. Which object do you use?
- A. Costing version
- B. Costing type
- C. Reference variant
- D. Transfer control
正解:D
質問 # 20
Which of the following statements best describe Product Cost by Period? Note: There are 2 correct answers to this question.
- A. It is used when the focus of controlling is on a stable and continuous production process.
- B. It is used to analyze work in process (WIP) based on actual costs.
- C. It is used when periodic costs outweigh daily postings.
- D. It is used in conjunction with a product cost collector.
正解:A、D
質問 # 21
In a standard system delivery, how many free characteristics can be added to an operating concern?
- A. 0-70
- B. Over 150
- C. 71-100
- D. 101-150
正解:A
質問 # 22
You would like to allocate primary and secondary costs from a cost center to another cost center. Which allocation method will you use?
- A. Assessment
- B. Distribution
- C. Direct activity allocation
- D. Periodic reposting
正解:A
質問 # 23
Which statements best describes a single cost center standard hierarchy?
- A. It is a structure to which all cost center groups created within an operating concern are assigned.
- B. It is a structure to which all the cost centers within an operating concern are assigned.
- C. It is a structure to which all cost center groups create for a controlling area are assigned.
- D. It is a structure to which all the cost centers within a controlling area are assigned.
正解:D
質問 # 24
You are running an indirect activity allocation. What do you post to the sender and receiver?
- A. You post both quantity and cost to the sender, and cost only to the receiver.
- B. You post quantity and cost to both the sender and receiver.
- C. You post both quantity and cost to the receiver, and cost only to the sender.
- D. You post only cost to both the sender and receiver.
正解:B
質問 # 25
How does the system derive the requirement type from the material master data? Note: There are 2 correct answers to this question.
- A. MRP group -> requirements class -> planning strategy -> requirements type
- B. Strategy group -> planning strategy -> requirements class -> requirements type
- C. MRP group -> Strategy group -> planning strategy -> requirements type
- D. Strategy group -> planning strategy -> requirements type
正解:C、D
質問 # 26
You want to run an assessment cycle in Profitability Analysis to allocate cost center costs during period-end closing for your organization. Which of the following objects is part of the assessment cycle?
- A. Tracing factor
- B. Sender cost objects
- C. Template
- D. Cycle iteration
正解:A
質問 # 27
You create alternative CO versions for your controlling area, in addition to version 0. What would you use additional CO versions for? Note: There are 2 correct answers to this question.
- A. To store different plan data
- B. To store data of alternative plan costing runs
- C. To store data of parallel valuation
- D. To store different budget data
正解:A、C
質問 # 28
What are some of the characteristics of SAP Core Data Services (CDS) views? Note: There are 3 correct answers to this question.
- A. CDS views have no latency.
- B. CDS views duplicate data for reporting efficiencies.
- C. CDS views support authorization.
- D. CDS views have ready-to-use content.
- E. CDS views are considered system modifications.
正解:A、C、D
質問 # 29
You are setting up a direct internal activity allocation in SAP S4/HANA. What is valid receivers for the activity? Note: There are 3 correct answers to this question.
- A. Internal order
- B. Sales order item
- C. Profit center
- D. General ledger account
- E. WBS element
正解:A、B、E
質問 # 30
What parameters can you set up when defining order types?
- A. Define source structure.
- B. Define document type.
- C. Allow revenue postings.
- D. Define default parameters for master record fields.
正解:C、D
質問 # 31
At what level do you create the structure of the operating concern?
- A. Company code level
- B. Client level
- C. Sales organization level
- D. Controlling area level
正解:B
質問 # 32
You want to prevent reporting extreme periodic fluctuations in your P&L statement. Which Management Accounting activity should you choose to help spread irregular expenses throughout the fiscal year?
- A. Accrual calculation
- B. Indirect activity allocation
- C. Budget availability control
- D. Periodic reporting
正解:A
質問 # 33
What can you manage via the account assignment category? Note: There are 2 correct answers to this question.
- A. Product cost by sales order
- B. Costing variant
- C. Valuation of separate sales order stock
- D. Separate sales order stock
正解:C、D
質問 # 34
What master data objects can you set up using time-based fields? Note: There are 2 correct answers to this question.
- A. Activity type
- B. Statistical key figures
- C. Cost element
- D. Cost centers
正解:A、D
質問 # 35
You are setting up costing-based Profitability Analysis for your organization. How do you configure the deferent market segments?
- A. As characteristics
- B. As key Figures
- C. As value fields
- D. As divisions
正解:A
質問 # 36
You have activated budget availability control against the overall value for an internal order and entered an overall budget of 10000.
Actuals of 10000 were posted in the previous year.
You are surprised to realize that a purchase order 1000 was created for this internal order in the current year.
How is that possible?
Note: There are 2 correct answers to this question.
- A. The purchase order has NOT generated a budget yet.
- B. The difference of 1000 is within the tolerance limits defined in the configuration.
- C. The cost element is exempted from budget availability control.
- D. The purchase order was entered in a different year than the budget.
正解:B、C
質問 # 37
You use a production order with Product Cost by Period and you entered a results analysis key and variance key. How does the system calculate variances in Product Cost by Period?
- A. Variances = Target costs - Delivery value
- B. Variances = Actual costs - Delivery value - WIP
- C. Variances = Target costs - Delivery value - WIP
- D. Variances = Actual costs - Delivery value
正解:B
質問 # 38
You want to use template to consider overhead during product costing. How do you assign the template to your material?
- A. Using a special procurement type and an overhead group
- B. Using an origin group and an overhead group
- C. Using an overhead group and an overhead key
- D. Using a profit center and an overhead key
正解:C
質問 # 39
......
SAP c_ts4co_2021 試験は、SAP S/4HANA マネジメント・アカウンティング・アソシエイトのスキルと知識を検証したい個人にとって貴重な認定です。この認定は、個人が SAP S/4HANA を使用して会計プロセスを管理するために必要な知識とスキルを持っていることを証明します。この認定は、個人がキャリアを進め、収益を増やすことができます。
SAP C_TS4CO_2021認定試験は、管理会計アソシエイトのSAP S/4HANAの知識とスキルを検証したい個人向けに設計されています。この認定試験は、財務会計の管理とSAP S/4HANAでの制御の毎日のタスクの実行を担当するアプリケーションアソシエイトを対象としています。この試験では、実践的な経験と正式なトレーニングを通じて得られた知識とスキルを適用する候補者の能力を測定します。
厳密検証されたC-TS4CO-2021問題集と解答でC-TS4CO-2021問題集と正解付き:https://jp.fast2test.com/C-TS4CO-2021-premium-file.html
ベストSAP Certified Application Associate学習ガイドC-TS4CO-2021試験:https://drive.google.com/open?id=1nAmZl0Yw64LSwYjjr3Tcgp0admW6yqLT