[2023年11月] 無料お試しSAP C-IBP-2302問題集PDFは必ずベストの問題集オプションを使おう [Q40-Q63]

Share

[2023年11月] 無料お試しSAP C-IBP-2302問題集PDFは必ずベストの問題集オプションを使おう

C-IBP-2302試験資料SAP学習ガイド

質問 # 40
Which of the following are features of the S&OP process templates?Note: There are 2 correct answers to this question.

  • A. Each step depicted in the template can have tasks associated with it.
  • B. New instances of templates allow for re-use of the same processes.
  • C. The S&OP process step can be started with an application job.
  • D. All process templates are assigned to dashboards.

正解:A、B


質問 # 41
What are the S&OP operator (optimizer) parameters associated with demand fair share?

  • A. Number of fair share segments Additional tiering costs (default) Maximum inventory
  • B. Number of fair share segments Maximum days of coverage Number of fair share segments late delivery
  • C. Number of fair share segments Additional tiering costs (default) Number of fair share segments late delivery
  • D. Number of fair share segments Additional tiering costs (default) Inventory days of supply

正解:C


質問 # 42
Which functional capabilities are included in SAP IBP for response and supply?Note: There are 2 correct answers to this question.

  • A. Detailed Production Scheduling
  • B. Gating Factors
  • C. Planning with Product Allocations
  • D. Analyze Supply Usage

正解:B、D


質問 # 43
Which of the following are functions of SAP IBP for demand?Note: There are 2 correct answers to this question.

  • A. Embedded, on-the-fly demand analytics
  • B. Detailed statistical analysis of demand data using predictive analytics tools
  • C. Demand sensing of demand data using predictive analytics tools
  • D. Consideration of demand-driven analysis for buffer positioning.

正解:A、B


質問 # 44
Which sets of chart types are provided within the Analytics Advanced application?Note: There are 3 correct answers to this question.

  • A. Simulation Chart Types
  • B. Geographic Chart Types
  • C. Trend Chart Types
  • D. Seasonal Chart Types
  • E. Comparison Chart Types

正解:C、D、E


質問 # 45
What are some of the available ABC segmentation methods in SAP IBP?Note: There are 2 correct answers to this question.

  • A. By Number of Items (Sorted Values)
  • B. By Pareto Principle (Sorted and Cumulated %)
  • C. By Pareto Principle (Sorted and Calculated Values)
  • D. By Number of Items (Sorted Average)

正解:A、C


質問 # 46
What are the ways to achieve rolling aggregation with SAP IBP?

  • A. Using a local member
  • B. Using a appropriate period weight factor
  • C. Using a attribute as a key figure
  • D. Using a key figure calculation

正解:B


質問 # 47
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing.Which of the following parameters can you model to plan production with extra shift(s)?

  • A. Production source validity at the start of seasonal peak
  • B. Adjusted production interactive values
  • C. Capacity expansion with additional costs
  • D. Incremental production values

正解:C


質問 # 48
You need to integrate data from SAP S/4HANA and legacy ERP to SAP IBP.What are the integration tools that you can use with such a setup for data transfer?Note: There are 2 correct answers to this question.

  • A. Smart Data Integration
  • B. Cloud Identity Authentication Service
  • C. Cloud Integration for Data Services
  • D. Real-time Integration

正解:A、C


質問 # 49
Analytics charts are created by the user in the Advanced Analytics application.What can the user do in the Advanced Analytics app?Note: There are 2 correct answers to this question.

  • A. Group data.
  • B. Open graphics in Excel.
  • C. Apply filters on your data.
  • D. Merge charts together.

正解:A、C


質問 # 50
You are setting up planing with lot sizes.What are some of the properties of lot sizes that you need to be aware of?Note: There are 2 correct answers to this question.

  • A. Periodic lot size setting overrides the minimum lot size.
  • B. Lot sizes are applicable for production and handling quantities.
  • C. Lot sizes are time-independent master data settings.
  • D. Lot sizes are applicable for production and transportation quantities.

正解:B、C


質問 # 51
You need to make manual adjustments to your S&OP plan.Which are possible ways of making these changes?Note: There are 2 correct answers to this question.

  • A. Using Driver-Based planning
  • B. Using Microsoft Excel planning views
  • C. Leveraging the web-based planning capability
  • D. Leveraging the functionality of SAP Workzone

正解:B、C


質問 # 52
Which conditions have to be fulfilled as a prerequisite to maintain a key figure disaggregation?Note: There are 2 correct answers to this question.

  • A. The key figure is stored and system editable.
  • B. The key figure is calculated and system editable.
  • C. The key figure is stored and all editable.
  • D. The key figure is calculated and all editable.

正解:C


質問 # 53
You are working to realign the data due to a recent warehouse closure.What should you be aware of in regards to the realignment steps settings?Note: There are 2 correct answers to this question.

  • A. A realignment step can change master data, planning objects and key figures.
  • B. The number of steps in the realignment run is limited to 255.
  • C. You must mark the realignment step as "shared" and assign the steps to users.
  • D. The name of the realignment step should be no longer than 20 characters.

正解:A、C


質問 # 54
You need to create time periods for the time profile in a planning area.What should you be aware of when running the Create Time Periods application job?

  • A. A time profile has to be activated so that the application job can proceed.
  • B. In the Parameter Section of the application job, choose the Time Profile ID and Planning Area.
  • C. This application job can be run for multiple time profiles at once.
  • D. The assigned Planning Area must be active.

正解:B


質問 # 55
Which are the mandatory preconditions for an attribute that can be used for saving the segmentation results?Note: There are 2 correct answers to this question.

  • A. The attribute should be a non-key attribute of the master data type.
  • B. The attribute belongs to a simple or compound master data type.
  • C. The attribute should be assigned to all planning levels.
  • D. The Business Meaning of the attribute has been specified.

正解:A、B


質問 # 56
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note: There are 3 correct answers to this question.

  • A. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
  • B. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
  • C. It checks whether the sourcing in the Production Source Item Master Data type exists.
  • D. It checks whether the required planning level master data exists for a subset of input key figures.
  • E. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.

正解:B、D、E


質問 # 57
Which of the following data inputs, when increased, will always cause an increase in the safety stock outputs when the Global (multi-stage) Inventory Optimization operator is run?Note: There are 2 correct answers to this question.

  • A. Holding Cost Percentage
  • B. Minimum Lot Size
  • C. Transportation Lead Time Error CV
  • D. Target Service Level

正解:B、D


質問 # 58
Where can the results of a Time Series Analysis be used?Note: There are 2 correct answers to this question.

  • A. In the Manage Forecast Error Calculations app - Demand Planning app to calculate the Forecast Error CV
  • B. In the Microsoft Excel add-in, where you can use them to limit and filter your planning views
  • C. In Global (multi-stage) Inventory Optimization to calculate time-phased Recommended Safety Stock Outputs
  • D. During XYZ segmentation in the Manage ABC/XYZ Segmentation Rules app

正解:C、D


質問 # 59
Which type of Master Data will be represented by the Master Data Type LOCATIONFR?

  • A. Virtual Master Data Type
  • B. Compound Master Data Type
  • C. Reference Master Data Type
  • D. External Master Data Type

正解:C


質問 # 60
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.

  • A. Transportation lead times
  • B. Maximum lot size
  • C. Minimum lot size
  • D. Aggregated constraints
  • E. Adjusted transport receipts

正解:A、B、E


質問 # 61
Which of the following are features of lag-based snapshots?Note: There are 2 correct answers to this question.

  • A. Lag-based snapshots are created in the Configuration app for a fixed time range.
  • B. Target key figures for these snapshots are exposed to the user in planning views.
  • C. The number of lag-based snapshots are limited to nine levels.
  • D. Target key figures for these snapshots must have lag as a root attribute in its base planning level.

正解:A、D


質問 # 62
What function would you use to configure a year-to-date calculation?

  • A. Last Period Aggregation
  • B. Dynamic Rolling Aggregation
  • C. Rolling Aggregation
  • D. Cumulative Aggregation

正解:D


質問 # 63
......

有効な問題最新版を試そうC-IBP-2302テスト解釈C-IBP-2302有効な試験ガイド:https://jp.fast2test.com/C-IBP-2302-premium-file.html

C-IBP-2302実際の問題解答PDFは100%カバー率でリアル試験問題:https://drive.google.com/open?id=1aJosr1UtCf1FxiqF6pw2Ly4drL0ZBd21


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어