質問 # 40
Which of the following are features of the S&OP process templates?Note: There are 2 correct answers to this question.
- A. Each step depicted in the template can have tasks associated with it.
- B. New instances of templates allow for re-use of the same processes.
- C. The S&OP process step can be started with an application job.
- D. All process templates are assigned to dashboards.
正解:A、B
質問 # 41
What are the S&OP operator (optimizer) parameters associated with demand fair share?
- A. Number of fair share segments Additional tiering costs (default) Maximum inventory
- B. Number of fair share segments Maximum days of coverage Number of fair share segments late delivery
- C. Number of fair share segments Additional tiering costs (default) Number of fair share segments late delivery
- D. Number of fair share segments Additional tiering costs (default) Inventory days of supply
正解:C
質問 # 42
Which functional capabilities are included in SAP IBP for response and supply?Note: There are 2 correct answers to this question.
- A. Detailed Production Scheduling
- B. Gating Factors
- C. Planning with Product Allocations
- D. Analyze Supply Usage
正解:B、D
質問 # 43
Which of the following are functions of SAP IBP for demand?Note: There are 2 correct answers to this question.
- A. Embedded, on-the-fly demand analytics
- B. Detailed statistical analysis of demand data using predictive analytics tools
- C. Demand sensing of demand data using predictive analytics tools
- D. Consideration of demand-driven analysis for buffer positioning.
正解:A、B
質問 # 44
Which sets of chart types are provided within the Analytics Advanced application?Note: There are 3 correct answers to this question.
- A. Simulation Chart Types
- B. Geographic Chart Types
- C. Trend Chart Types
- D. Seasonal Chart Types
- E. Comparison Chart Types
正解:C、D、E
質問 # 45
What are some of the available ABC segmentation methods in SAP IBP?Note: There are 2 correct answers to this question.
- A. By Number of Items (Sorted Values)
- B. By Pareto Principle (Sorted and Cumulated %)
- C. By Pareto Principle (Sorted and Calculated Values)
- D. By Number of Items (Sorted Average)
正解:A、C
質問 # 46
What are the ways to achieve rolling aggregation with SAP IBP?
- A. Using a local member
- B. Using a appropriate period weight factor
- C. Using a attribute as a key figure
- D. Using a key figure calculation
正解:B
質問 # 47
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing.Which of the following parameters can you model to plan production with extra shift(s)?
- A. Production source validity at the start of seasonal peak
- B. Adjusted production interactive values
- C. Capacity expansion with additional costs
- D. Incremental production values
正解:C
質問 # 48
You need to integrate data from SAP S/4HANA and legacy ERP to SAP IBP.What are the integration tools that you can use with such a setup for data transfer?Note: There are 2 correct answers to this question.
- A. Smart Data Integration
- B. Cloud Identity Authentication Service
- C. Cloud Integration for Data Services
- D. Real-time Integration
正解:A、C
質問 # 49
Analytics charts are created by the user in the Advanced Analytics application.What can the user do in the Advanced Analytics app?Note: There are 2 correct answers to this question.
- A. Group data.
- B. Open graphics in Excel.
- C. Apply filters on your data.
- D. Merge charts together.
正解:A、C
質問 # 50
You are setting up planing with lot sizes.What are some of the properties of lot sizes that you need to be aware of?Note: There are 2 correct answers to this question.
- A. Periodic lot size setting overrides the minimum lot size.
- B. Lot sizes are applicable for production and handling quantities.
- C. Lot sizes are time-independent master data settings.
- D. Lot sizes are applicable for production and transportation quantities.
正解:B、C
質問 # 51
You need to make manual adjustments to your S&OP plan.Which are possible ways of making these changes?Note: There are 2 correct answers to this question.
- A. Using Driver-Based planning
- B. Using Microsoft Excel planning views
- C. Leveraging the web-based planning capability
- D. Leveraging the functionality of SAP Workzone
正解:B、C
質問 # 52
Which conditions have to be fulfilled as a prerequisite to maintain a key figure disaggregation?Note: There are 2 correct answers to this question.
- A. The key figure is stored and system editable.
- B. The key figure is calculated and system editable.
- C. The key figure is stored and all editable.
- D. The key figure is calculated and all editable.
正解:C
質問 # 53
You are working to realign the data due to a recent warehouse closure.What should you be aware of in regards to the realignment steps settings?Note: There are 2 correct answers to this question.
- A. A realignment step can change master data, planning objects and key figures.
- B. The number of steps in the realignment run is limited to 255.
- C. You must mark the realignment step as "shared" and assign the steps to users.
- D. The name of the realignment step should be no longer than 20 characters.
正解:A、C
質問 # 54
You need to create time periods for the time profile in a planning area.What should you be aware of when running the Create Time Periods application job?
- A. A time profile has to be activated so that the application job can proceed.
- B. In the Parameter Section of the application job, choose the Time Profile ID and Planning Area.
- C. This application job can be run for multiple time profiles at once.
- D. The assigned Planning Area must be active.
正解:B
質問 # 55
Which are the mandatory preconditions for an attribute that can be used for saving the segmentation results?Note: There are 2 correct answers to this question.
- A. The attribute should be a non-key attribute of the master data type.
- B. The attribute belongs to a simple or compound master data type.
- C. The attribute should be assigned to all planning levels.
- D. The Business Meaning of the attribute has been specified.
正解:A、B
質問 # 56
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note: There are 3 correct answers to this question.
- A. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
- B. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
- C. It checks whether the sourcing in the Production Source Item Master Data type exists.
- D. It checks whether the required planning level master data exists for a subset of input key figures.
- E. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
正解:B、D、E
質問 # 57
Which of the following data inputs, when increased, will always cause an increase in the safety stock outputs when the Global (multi-stage) Inventory Optimization operator is run?Note: There are 2 correct answers to this question.
- A. Holding Cost Percentage
- B. Minimum Lot Size
- C. Transportation Lead Time Error CV
- D. Target Service Level
正解:B、D
質問 # 58
Where can the results of a Time Series Analysis be used?Note: There are 2 correct answers to this question.
- A. In the Manage Forecast Error Calculations app - Demand Planning app to calculate the Forecast Error CV
- B. In the Microsoft Excel add-in, where you can use them to limit and filter your planning views
- C. In Global (multi-stage) Inventory Optimization to calculate time-phased Recommended Safety Stock Outputs
- D. During XYZ segmentation in the Manage ABC/XYZ Segmentation Rules app
正解:C、D
質問 # 59
Which type of Master Data will be represented by the Master Data Type LOCATIONFR?
- A. Virtual Master Data Type
- B. Compound Master Data Type
- C. Reference Master Data Type
- D. External Master Data Type
正解:C
質問 # 60
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.
- A. Transportation lead times
- B. Maximum lot size
- C. Minimum lot size
- D. Aggregated constraints
- E. Adjusted transport receipts
正解:A、B、E
質問 # 61
Which of the following are features of lag-based snapshots?Note: There are 2 correct answers to this question.
- A. Lag-based snapshots are created in the Configuration app for a fixed time range.
- B. Target key figures for these snapshots are exposed to the user in planning views.
- C. The number of lag-based snapshots are limited to nine levels.
- D. Target key figures for these snapshots must have lag as a root attribute in its base planning level.
正解:A、D
質問 # 62
What function would you use to configure a year-to-date calculation?
- A. Last Period Aggregation
- B. Dynamic Rolling Aggregation
- C. Rolling Aggregation
- D. Cumulative Aggregation
正解:D