
[2023年11月] 合格させるC-S4CSC-2302試験一発合格、最新のC-S4CSC-2302 Fast2testの提供する試験問題
SAP Certified Application Associate問題集でC-S4CSC-2302試験の完全版解答試験学習ガイド
質問 # 44
Which of the following is a prerequisite for using Automated Receipt Settlement (ERS) in a procurement process? Note: There are 2 correct answers to this question.
- A. The indicator for ERS is set in the supplier master record.
- B. The indicator for ERS is set in the material master record.
- C. The indicator for ERS is set in the purchase order item.
- D. The indicator for ERS is set in the purchasing info record.
正解:A、C
質問 # 45
How is the productive system configured? Note: There are 2 correct answers to this question.
- A. Via the Cloud Application Lifecycle Management (CALM) Implementation Portal
- B. Through Central Business Configuration (CBC) in SAP Business Technology Platform
- C. Through the Solution Documentation component of the SAP Solution Manager
- D. Through transports from the quality system
正解:A、C
質問 # 46
Which of the following tasks can you perform using the Post Goods Movement (MIGO) app? Note: There are 3 correct answers to this question.
- A. Post a stock transfer between two plants
- B. Create a material reservation
- C. Display a material document
- D. Post a component backflush
- E. Search for purchase orders
正解:A、C、E
質問 # 47
What can you use the Query Browser app to do? Note: There are 2 correct answers to this question.
- A. View authorized published queries
- B. Create and publish a query
- C. Create your own tags for CDS views
- D. Modify an SAP-created analytical query
正解:A、C
質問 # 48
What can you use the View Browser app to do?
- A. Display custom SAP views irrespective of draft or released status
- B. Launch analytic cloud stories
- C. Create, edit, and delete CDS views
- D. Get a list of all available analytical CDS views and their artifacts
正解:D
質問 # 49
Which of the following are outcomes of the Fit-to-Standard workshop? Note: There are 3 correct answers to this question.
- A. Identification of source code changes
- B. Finalized scope and integration requirements
- C. Solution impact on business processes
- D. Expert configuration definition
- E. Extensibility solutions to close gaps
正解:C、D、E
質問 # 50
You procure some materials exclusively via subcontracting. You want Material Requirements Planning (MRP) to create subcontract purchase requisitions for these materials instead of normal purchase requisitions. What must you do for each of these materials? Note: There are 2 correct answers to this question.
- A. Set a special procurement type for subcontracting in the material master record
- B. Create a bill of material with the components to be provided
- C. Set a special MRP group for subcontracting in the material master record
- D. Create a routing with an operation to be processed externally
正解:A、B
質問 # 51
What are the steps for conducting automated business process testing? Note: There are 3 correct answers to this question.
- A. Run the test
- B. Create a test system
- C. Assess data management
- D. Create a test plan
- E. Correct and rerun failed test processes
正解:A、D、E
質問 # 52
What are features of the Stock Transfer without Delivery (BMH) scope item? Note: There are 2 correct answers to this question.
- A. You can monitor stock in transit
- B. You can maintain shipping data manually
- C. You can transfer quality inspection stock
- D. You can enter planned delivery costs
正解:A、D
質問 # 53
Which activity do you perform during the data load preparation?
- A. Simulate data load in the new cloud system
- B. Fill in migration templates with legacy data
- C. Define specifications for data extraction on legacy system
- D. Resolve data issues from the simulation process
正解:A
質問 # 54
What can influence the Product Availability Check during the creation of a sales order? Note: There are 2 correct answers to this question.
- A. The customer material info record
- B. The material
- C. The plant
- D. The customer
正解:A、D
質問 # 55
What does the Alternative-Based Confirmation (ABC-ATP) allow? Note: There are 3 correct answers to this question.
- A. Create partial confirmations in multiple plants
- B. Replace a requested material with an alternative one
- C. Substitute the delivering plant in the sales order item
- D. Postpone confirmed orders with lower priority
- E. Check against alternative sources of supply
正解:B、C、E
質問 # 56
What determines the set of data migration objects available from the Migrate Your Data application?
- A. The selected business scenarios
- B. The customer legacy system
- C. The selected source system
- D. The selected target fields
正解:A
質問 # 57
What are the prerequisites for using the SAP Fiori Test Your Processes app? Note: There are 2 correct answers to this question.
- A. The test scripts are uploaded in the productive system
- B. The productive system is connected to the implementation landscape
- C. SAP Best Practices are activated in the quality system
- D. The quality system is connected to the Test Execution Service on SAP Business Technology Platform
正解:C、D
質問 # 58
The Automotive Supply to Customer - Inventory Management (55F) scope item describes an end- to-end process for automotive suppliers. Which of the following options does this scope item include to streamline and accelerate the process? Note: There are 3 correct answers to this question.
- A. Self-Billing
- B. Evaluated Receipt Settlement (ERS)
- C. Purchase Scheduling Agreement
- D. Purchase Contract
- E. Invoicing Plan
正解:A、B、C
質問 # 59
From which sources can the system determine the shipping conditions during sales order creation?
Note: There are 3 correct answers to this question.
- A. The schedule line category
- B. The sold-to party
- C. The ship-to party
- D. The material
- E. The sales document type
正解:B、C、E
質問 # 60
In a subcontracting process, in which process step does the consumption posting of the components take place?
- A. Stock transfer to subcontracting stock
- B. Invoice receipt for subcontracting purchase order
- C. Goods receipt for subcontracting purchase order
- D. Creation of subcontracting purchase order
正解:C
質問 # 61
Which activities can you execute in the Maintain Business Roles SAP Fiori app? Note: There are 2 correct answers to this question.
- A. Assign business catalogs to a business role
- B. Maintain restrictions
- C. Maintain catalog roles
- D. Assign PFCG profiles to a business role
正解:A、B
質問 # 62
Which of the following process steps update the stock in transit? Note: There are 2 correct answers to this question.
- A. Create a delivery for a stock transport order
- B. Post a stock transfer in two steps
- C. Post a goods receipt for a stock transport order
- D. Post a goods issue for a stock transport order
正解:C、D
質問 # 63
......
正真正銘のベスト材料はC-S4CSC-2302オンライン練習試験:https://jp.fast2test.com/C-S4CSC-2302-premium-file.html
最高品質のC-S4CSC-2302問題集と解釈が待ってます!今すぐ取得せよ:https://drive.google.com/open?id=1jo0q220UDM6Ok4XOL75igFvtfazGpBfM