質問 # 40
Which of the following elements are used during forward scheduling in material requirements planning? Note: There are 2 correct Answers to this question.
- A. Purchasing processing time
- B. Goods receipt processing time
- C. Shipping processing time
- D. Total replenishment lead time
正解:A、B
質問 # 41
Which of the following are prerequisites for the automatic conversion of purchase requisitions into purchase orders (PO)? Note: There are 2 correct answers to this question.
- A. The purchase requisition contains a material master record.
- B. A contract with plant-specific conditions exists for the material and the supplier.
- C. The purchase requisition is assigned to a valid source of supply.
- D. The Automatic PO indicator is set in the supplier master record.
正解:C、D
質問 # 42
Which of the following can be created by MRP Live for externally procured materials? Note: There are 2 correct Answers to this question.
- A. MRP list
- B. Purchase requisition
- C. Schedule line
- D. Planned order
正解:B、C
質問 # 43
What are the options in customizing for the automatic posting of unplanned delivery costs in an invoice with purchase order reference? Note: There are 2 correct answers to this question.
- A. Post at the time of payment
- B. Post in a separate invoice document
- C. Distribute among the invoice items
- D. Post to a separate G/L account
正解:C、D
質問 # 44
Which of the following are prerequisites for the automatic conversion of purchase requisitions (PR) into purchase orders (PO)? Note: There are 3 correct answers to this question.
- A. The Automatic PO indicator is set in the supplier master record.
- B. The Relevant for Automatic Sourcing indicator is set in the info record.
- C. A contract with plant-specific conditions exists for the material and the supplier.
- D. The purchase requisition is assigned to a valid source of supply.
- E. A valuation price is maintained for a PR item without a material master record.
正解:B、D、E
質問 # 45
Which of the following are prerequisites for the automatic conversion of purchase requisitions into
purchase orders (PO)? Note: There are 2 correct Answers to this question.
- A. The purchase requisition contains a material master record.
- B. A contract with plant-specific conditions exists for the material and the supplier.
- C. The purchase requisition is assigned to a valid source of supply.
- D. The Automatic PO indicator is set in the supplier master record.
正解:C、D
質問 # 46
What are prerequisites for evaluated receipt settlement (ERS)? Note: There are 3 correct Answers to this question.
- A. Estimated Price checkbox in the PO item
- B. Flagged checkbox for the automatic settlement of goods received
- C. Goods receipt with reference to the PO Flagged
- D. Invoicing plan item in the PO
- E. Terms of payment in the purchase order (PO) header
正解:B、C、D
質問 # 47
Which of the following are restrictions of material-to-material postings? Note: There are 3 correct
Answers to this question.
- A. The postings can be made only from unrestricted-use stock of the issuing material to unrestricted-use
stock of the receiving material. - B. The postings can be made only in a single step.
- C. The postings can be made only between materials with the same material type.
- D. The postings cannot be pre-planned with a reservation.
- E. The postings can be made only if the stock of the issuing material is in the same storage location as
the stock of the receiving material.
正解:A、B、D
質問 # 48
Which of the following applications can send forecast data to SAP S/4HANA? Note: There are 2 correct Answers to this question.
- A. SAP Integrated Business Planning (SAP IBP)
- B. SAP Customer Relationship Management (SAP CRM)
- C. SAP Supply Chain Management (SAP SCM)
- D. SAP Supply Base Optimization (SAP SBO)
正解:A、C
質問 # 49
Which of the following are examples of cloud solutions from SAP that can easily be integrated with SAP S/4HANA? Note: There are 3 correct answers to this question
- A. SAP Extended Warehouse Management
- B. SAP Concur
- C. SAP Advanced Planning and Optimization
- D. SAP Ariba
- E. SAP SuccessFactors
正解:B、D、E
質問 # 50
You want to order material for a cost centre. Which field in the purchase order controls procurement for consumption?
- A. Procurement document category
- B. Account assignment category
- C. Purchase order type
- D. Item category
正解:B
質問 # 51
What are the minimum maintenance statuses required for a material to be procured for receipt into valuated stock? Note: There are 2 correct Answers to this question.
- A. Warehouse Management
- B. Accounting
- C. Purchasing
- D. Basic Data
正解:B、C
質問 # 52
What determines the sequence in which materials are planned during the material requirements planning (MRP) run?
- A. The control parameters of the MRP run
- B. The replenishment lead time of the materials
- C. The creation date of the materials
- D. The low-level code of the materials
正解:D
質問 # 53
In what ways can you personalize the Procurement Overview Page SAP Fiori app in SAP S/4HANA? Note: There are 3 correct Answers to this question.
- A. Filter information on a card.
- B. Hide an existing card.
- C. Extend the set with a new card.
- D. Change the position of cards.
- E. Change the set of cards.
正解:A、B、D
質問 # 54
What are the different types of SAP Fiori apps? Note: There are 3 correct Answers to this question.
- A. Transactional
- B. Analytical
- C. Master data
- D. Configuration
- E. Factsheet
正解:A、B、E
質問 # 55
......
SAP C_TS450_2021認定試験は、SAP S/4HANA調達と調達に関連する様々なトピックをカバーする包括的なテストです。試験は、調達プロセスの設計と実装、サプライヤーとの関係管理、調達オペレーションの最適化、SAP S/4HANA調達ソリューションの活用などのトピックをカバーしています。試験はまた、サプライチェーンのコラボレーション、分析、モバイル調達など、SAP S/4HANA調達と調達の最新機能や機能もカバーしています。
2023年最新のFast2test C-TS450-2021のPDFで最近更新された問題です:https://jp.fast2test.com/C-TS450-2021-premium-file.html
C-TS450-2021試験には保証が付きます。更新されたのは82問があります:https://drive.google.com/open?id=1_v4QDaKIcAJ81ZEMQUf_G2k_KIPR6l23