質問 # 47
What setting is used for the object space reservation in the VXRAIL-SYSTEM-STORAGE-PROFILE?

  • A. Thick Provisioning
  • B. 50% Reservation
  • C. Thin Provisioning
  • D. 75% Reservation

正解:A

解説:


質問 # 48
Match each VxRail API request with the information to be retrieved.

正解:

解説:


質問 # 49
A systems engineer is deploying a VxRail cluster. They want to ensure that configuration issues can be avoided when expanding this cluster.
Which actions need to be performed?

  • A. Verify VxRail nodes are racked and connected to the ToR switches
    Validate the network environment
  • B. Verify the configuration settings initially captured in PEQValidate the storage environment
  • C. Validate that the latest updates and patches are installed in the system Validate that no pending and unfinished jobs are running on the servers
  • D. Validate that no pending and unfinished jobs are running on the servers Verify that the server and storage components are working properly

正解:A

解説:


質問 # 50
A VxRail cluster 4.7.xxx environment is managed by the internal vCenter Server. An implementation engineer plans to deploy a new VxRail cluster using the existing vCenter Server instance, then use the customer-supplied VDS to manage both VxRail clusters.
What must be done?

  • A. Upgrade the VxRail version from 4.7.xxx to 7.0.000
  • B. Upgrade the internal vCenter Server to version 7.0
  • C. Migrate the internal vCenter Server to an external vCenter Server, then merge the PSC
  • D. Migrate the internal vCenter Server to an external vCenter Server, then upgrade the VxRail 4.7.xxx to 7.0.100

正解:A


質問 # 51
Which requirement must be met when expanding a 3-node VxRail G560F cluster with a fourth G Series node in the same chassis?

  • A. PCIe network card must be added to all nodes
  • B. Node requires only the same drive configuration
  • C. New node must be at the same VxRail version as existing nodes
  • D. Node hardware must be identical to the other three nodes

正解:D

解説:


質問 # 52
Match each VxRail, data protection solution with its functionality.

正解:

解説:


質問 # 53
A VxRail API request has been executed and the user account does not have vCenter privileges to perform the task.
What code is returned?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

正解:A


質問 # 54
A VxRail E560F model was delivered six months ago and is now scheduled to be installed with the target code. What is the correct order of steps to complete this task?

正解:

解説:


質問 # 55
A VxRail Manager VM must be configured as follows:
* IP address: 192 168.10.16
* Net mask: 255.255.255.0
* Gateway: 192 168 10 254
Which command must be used?

  • A. vxrail-network-config --ip 192 168 10.16-netmask 255.255.255.0-gateway 192 168 10.254
  • B. vxrail-primary -config --vxrail-address 192.168.10 16 --vxrail-netmask 255 255 255 0 -vxrail-gateway
    192.168,10 254
  • C. vxrail-prrmary -config --ip 192 168 10 16 -netmask 255 255 255 0 -gateway 192 168 10 254
  • D. vxrail-network -config --vxrail-address 192.166 10 16 --vxrail-netmask 255 255.255 0 --vxrail-gateway
    192.168.10.254

正解:B


質問 # 56
An implementation engineer is configuring the network firewall to support a VxRail installation. Where can they find the necessary firewall rules?

  • A. Rack worksheet of the Network PEQ
  • B. VxRail Configuration Portal
  • C. As-Built Configuration Report
  • D. Network Validation Tool

正解:C


質問 # 57
An infrastructure system audit will begin in two weeks All data center devices will be checked to ensure they contain the installed patches and configurations. A system engineer will update the VxRail hosts with the latest patches and remediate security vulnerabilities.
What troubleshooting resource can a user receive from Dell and use proactively to help perform the remediation tasks?

  • A. Advisories
  • B. SolVe Online
  • C. Log files
  • D. KB articles

正解:C


質問 # 58
A VxRail implementation engineer is validating the network environment with NVT. The proposed switch configuration is shown in the exhibit. The ToR Switch information file is available.
Use the VxRail simulator to set up NVT for switch validation. Import the switch Information and tag the ports based on the exhibit.

正解:

解説:
Pending
Send your suggestions for this question.


質問 # 59
Match each VxRail configuration with its related characteristic.

正解:

解説:


質問 # 60
Once a VxRail cluster has been acquired, what is the correct sequence of steps to deploy it?

正解:

解説:


質問 # 61
For which typical activity would the Full data migration setting be used when placing a VxRail host into maintenance mode?

  • A. Shutting down an entire cluster
  • B. Rebooting a single ESXi host
  • C. Temporary maintenance
  • D. Permanently removing host from cluster

正解:C


質問 # 62
Match each VxRail data protection solution with its functionality.

正解:

解説:


質問 # 63
What is a difference between vSAN Data-In-Transit Encryption and vSAN Data-At-Rest-Encryption?

  • A. Data-In-Transit Encryption: Key Management Server must reside on the vSAN cluster Data-At-Rest Encryption: Key Management Server can reside on the vSAN cluster
  • B. Data-In-Transit Encryption: Encrypts traffic between VMs and the VxRail nodes Data-At-Rest Encryption: Encrypts traffic between VxRail nodes only
  • C. Data-In-Transit Encryption: Does not require a Key Management Server Data-At-Rest Encryption: Requires a Key Management Server
  • D. Data-In-Transit Encryption: Addresses fear of media theft
    Data-At-Rest Encryption: Addresses fear of rogue administrators

正解:B


質問 # 64
During the activation of Internal SRS, the implementation engineer receives a message that the deployment has failed What is a possible cause?

  • A. Witness Gateway not configured following Dell best practices
  • B. SRS VE Gateway on the same subnet as the VxRail Manager
  • C. Site ID mismatch between the IB database and the SRS Wizard
  • D. VxRail status already set to installed' in IB database

正解:B


質問 # 65
Match each VxRail, data protection solution with its functionality.

正解:

解説:


質問 # 66
An implementation engineer is deploying a new VxRail cluster. What should they confirm before installing the hardware?

  • A. Service laptop must be on the same IP network as the iDRACs
  • B. Power distribution must support the power rating of a single node
  • C. At least 36 in (92 cm) clearance exists in front of and behind the cabinet
  • D. Single power zone must be used with adequate power cables

正解:B


質問 # 67
What Is a supported method for racking nodes for a new VxRail deployment?

  • A. In the rack hosting the network equipment used to manage the iDRAC
  • B. With PDUs connected to 120v single phase 5-amp electrical circuits
  • C. With server exhaust facing the cold aisle
  • D. Starting with node 1 at the top of the rack

正解:A


質問 # 68
......

DES-6322問題集レビュー専門クイズで学習材料:https://jp.fast2test.com/DES-6322-premium-file.html

DES-6322テスト準備トレーニング練習試験問題練習テスト:https://drive.google.com/open?id=1Xg-tvSFkybUDxyMFmYe5DAU3ptIKBNmk


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어