In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question.

  • A. When performing an SAP S/4HANA conversion with DMO
  • B. When performing an SAP S/4HANA conversion without u DMO
  • C. When upgrading an SAP S/4HANA Server system
  • D. When upgrading an SAP ECC system with DMO

正解:C、D


質問 # 34
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.

  • A. The source system is non-Unicode and the target database is a scale-out system.
  • B. Network capacity between exporting and importing R3load processes must be.
  • C. The target database size increases temporarily because of the Shadow Repository.
  • D. SAP HANA Landscape Reorganization required a manual step to edit a file.
  • E. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.

正解:D、E


質問 # 35
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:

  • A. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
  • B. Activation of dictionary objects in phase ACT_UPG
  • C. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
  • D. Import of dictionary objects from the download directory in phase DDIC_UPG
  • E. Import of upgrade and language data from the download directory in phase TABIM UPG

正解:B、D、E


質問 # 36
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
There is correctanswers to this question.
Response:

  • A. Check logs for jobs starting with "RSUPG_SGEN" in the system
  • B. Check the "Charts Control Center" in the SUM UI
  • C. Check the log files written under "SUM\abap\log"
  • D. Check the dump size of the database export on disk

正解:B、C


質問 # 37
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:

  • A. Using the database migration option (DMO) for SUM
  • B. Using the main configuration option "Single System" when installing an Add-On
  • C. Using the main configuration option "Standard" when applying SAP Support Packages
  • D. Using the main configuration option "Single System" in case of an upgrade.

正解:B


質問 # 38
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

  • A. Before the start of the SUM technical downtime
  • B. During the Execution roadmap step
  • C. After SUM has ended
  • D. During the SUM technical downtime

正解:D


質問 # 39
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:

  • A. Conversion of application tables (PARCONVJJPG)
  • B. Modification adjustment (SPDD)
  • C. Switch to new repository (EU_SWITCH)
  • D. Activation of dictionary objects (ACT_UPG)

正解:B、D


質問 # 40
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.

  • A. The path was stored to the environment of user <sid>adm during registration
  • B. The path is taken from the URL entered in the browser to start SUM
  • C. The path was stored in file sumabap conf during registration
  • D. The path was stored in file host_profile during registration

正解:C


質問 # 41
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?

  • A. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
  • B. AA

正解:A


質問 # 42
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

正解:D


質問 # 43
Which of the following SUM activities require a stack XML file calculated by the maintenance planner?
Note: There are 3 correct answers to this question.

  • A. Prerequisite check
  • B. DMO without system update
  • C. SAP S/4HANA conversion including DMO
  • D. Benchmark tool
  • E. SAP S/4HANA conversion without DMO

正解:A、C、E


質問 # 44
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?

  • A. A Standalone SAP system with ABAP 7.51 or above
  • B. An SAP S4HANA 1709 sandbox system
  • C. AA

正解:A、B


質問 # 45
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:

  • A. In DMO Migration Preparation
  • B. In SUM Phaselist
  • C. In SUM Parameters
  • D. In Process Control Center

正解:C、D


質問 # 46
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note There are 2 correct answers to this question

  • A. Check the dump size of the database export on disk.
  • B. Check the Charts Control Center in the SUM Ul
  • C. Check logs for jobs starting with RSUPG_SGEN in the SAP system.
  • D. Check the log files written in the SUM directory subdirectory abap. subdirectory log

正解:A、D


質問 # 47
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:

  • A. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
  • B. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
  • C. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
  • D. After the SUM roadmap step "Postprocessing" and post procedure steps are finished

正解:A


質問 # 48
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:

  • A. Reuse a profile for the shadow instance from a previous run.
  • B. Choose the instance number of the shadow instance.
  • C. Keep archiving on during the whole procedure.
  • D. Use the Near Zero Downtime Maintenance Technology (NZDM).

正解:A、B


質問 # 49
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above?
There are 3 correct answers to this question.

  • A. Dual Stack split
  • B. Release upgrade
  • C. Database migration
  • D. Homogenous system copy
  • E. Support Package Stack update

正解:B、C、E


質問 # 50
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC
6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
  • B. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
  • C. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
  • D. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU
    &UC) procedure.

正解:A


質問 # 51
You are running an SAP ECC system.
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?
Note There are 3 correct answers to this question

  • A. Perform an SAP S/4 HANA conversion without DMO
  • B. Apply SAP support packages
  • C. Use DMO for SUM
  • D. Upgrade the SAP system
  • E. Perform an SAP S/4 HANA conversion including DMO

正解:B、C、D


質問 # 52
ICNV initialization does 3

  • A. Build index on flag column
  • B. Creation of views
  • C. Creation of flag
  • D. AA

正解:A、B、C


質問 # 53
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:

  • A. Install add-on SAP Gateway 7.50
  • B. Uninstall Fiori apps not released for SAP_UI 7.50
  • C. Uninstall industry extensions not supported by SAP S/4HANA
  • D. Delete client 066 (Early Watch Client)

正解:B、D


質問 # 54
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. SAP ECC system from SAP ERP 6.0 EHP 8
  • B. Standalone AS ABAP with SAP_BASIS 752 and above
  • C. SAP S/4HANA Server 1809 and above
  • D. SAP Solution Manager 7.2

正解:B、C


質問 # 55
......

無料E-S4HCON2023試験問題E-S4HCON2023実際の無料試験問題:https://jp.fast2test.com/E-S4HCON2023-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어