[2022年11月]更新の1Z0-1082-21ブレーン問題集で1Z0-1082-21問題で最高得点を目指すため今すぐ試そう [Q32-Q51]

Share

[2022年11月]更新の1Z0-1082-21ブレーン問題集で1Z0-1082-21問題で最高得点を目指すため今すぐ試そう

1Z0-1082-21試験問題集でベスト問題集を無料で試そう1Z0-1082-21試験問題

質問 32
Which types of dimensions do you use to define model views?

  • A. Business dimensions only
  • B. Business dimensions, POV dimensions
  • C. POV dimensions. System dimensions
  • D. Business dimensions, POV dimensions. System dimensions

正解: D

 

質問 33
Which Is NOT a valid Point of View (POV) state?

  • A. Archived
  • B. Published
  • C. Final
  • D. Draft

正解: A

 

質問 34
Assume that the proper data permissions have been assigned In Profitability and Cost Management. Which two actions can you perform In Smart View?

  • A. Update dimension members and properties In Excel and submit the changes back to Profitability and Cost Management.
  • B. Create reusable Smart Queries to use for ad hoc reporting and analysis In Excel.
  • C. Display Analysis Views and Profit Curves that you created in Profitability and Cost Management in an Excel spreadsheet.
  • D. Update driver data in Excel and submit the changes back to Profitability and Cost Management.

正解: A,B

 

質問 35
Which two statements are true about dashboards?

  • A. Charts In dashboards are based on existing Analysts Views.
  • B. All users can create and edit dashboards.
  • C. You can drag and drop chart tiles to change the dashboard layout.
  • D. Dashboards can be enabled and disabled.

正解: A,C

 

質問 36
Which Is NOT Included In the Profitability and Cost Management analytics tools?

  • A. Trace Allocations
  • B. Key Performance Indicators (KPIs)
  • C. Sculler Analysis Graph
  • D. Analysis Views
  • E. Rule Update Analysis

正解: C

 

質問 37
Which two are required steps In creating an allocation rule?

  • A. Create a rule set context.
  • B. Create at least one global context.
  • C. Assign the rule sequence number,
  • D. Create a rule set for the rule.

正解: A,D

 

質問 38
Which set of dimensions Is required for Profitability and Cost Management applications?

  • A. Two system dimensions (Balance and Rule), at least one Business dimension, at least one POV dimension, at least one Alias dimension
  • B. Three system dimensions (Balance, Rule, and Drivers), at least two Business dimensions, at least one POV dimension
  • C. Two system dimensions (Balance and Rule), at least one Business dimension, at least one POV dimension, at least one Attribute dimension, at least one Alias dimension
  • D. Three system dimensions (Balance, Rule, and Drivers), at least one Business dimension, at least one POV dimension
  • E. Two system dimensions (Balance and Rule), at least one Business dimension, at least one POV dimension

正解: C

 

質問 39
Which Is a valid set with report objects, when designing reports in Financial Reporting Web Studio?

  • A. Tables, Charts, Text, KPIs
  • B. Charts, KPIs, Profit Curves. Tables
  • C. Grids, Charts, Profit Curves, Text
  • D. Text, Charts, Grids, Images

正解: D

 

質問 40
Which two statements are true about the Rule Balancing table?

  • A. The default model view Includes the top members across all business dimensions.
  • B. It shows information for all rules in the selected rule sets.
  • C. It shows the potential effects of an allocation before you run It.
  • D. It Includes the Initial Input value, as well as allocations In, allocations out, and offsets.

正解: A,D

 

質問 41
Which statement Is FALSE about data grants?

  • A. They generate security filters in Essbase when the database is deployed.
  • B. They can be assigned to groups or individual users.
  • C. They can be assigned to Service Administrators or Power Users.
  • D. They are used to control what dimensions and members can be accessed by the assigned users.

正解: D

 

質問 42
Which two statements are TRUE about cloning snapshots?

  • A. After cloning, the daily maintenance start time of the target environment Is reset to that of the source environment.
  • B. You cannot clone a snapshot to a target In a different Identity Domain from the source.
  • C. The cloning process deletes any existing application and uploaded files from the target environment.
  • D. You can select any snapshot from the source environment to clone to the target environment.

正解: C,D

 

質問 43
Which statement Is FALSE about Analysis Views?

  • A. They can be viewed by any user of the application.
  • B. You can add formatting to the report results.
  • C. You can use them as the basis for dashboards.
  • D. You can export their data to Excel for further processing.

正解: B

 

質問 44
Which three are valid statements about Locations In Data Management?

  • A. Different locations can use the same import format.
  • B. You can create duplicate locations with the same source system and application combination.
  • C. A location can be assigned to more than one Import format.
  • D. A location may have more than one source system.
  • E. A location can be assigned to more than one data load rules.

正解: A,B,E

 

質問 45
Which two statements are true about model validation?

  • A. Running a model validation displays an error table with Information about Invalid conditions.
  • B. After the application is deployed, it can detect invalid model artifacts if changes are made to dimensions.
  • C. Model validation validates rules, rule sets, and dimensions.
  • D. You cannot deploy the application if model validation returns Invalid conditions.

正解: A,C

 

質問 46
Which two statements are true about Period and Category Mapping definitions In Data Management?

  • A. Period mappings define the mapping between ERP calendars and Profitability and Cost Management years and periods.
  • B. If the source category matches the target category in Data Management (e.g. "Actual" to "Actual"), then a category mapping definition Is not required.
  • C. You use source level period mapping when you have multiple target applications and various source systems with different period types.
  • D. Period and category mappings are defined separately from data load member mapping.

正解: A,C

 

質問 47
Which two system level settings are not also user level settings In Data Management?

  • A. the level of detail displayed In logs
  • B. Whether archived files are copied or moved to the archive location
  • C. File character set
  • D. The column delimiter value when exporting member mappings
  • E. Global POV profile settings

正解: C,E

 

質問 48
Which Is NOT a key quality of the Models Interface In Profitability and Cost Management?

  • A. Managing and running reports
  • B. Setting up the flow of funds through the financial system
  • C. Point and click model administration and calculation
  • D. Managing rules and rule sets

正解: C

 

質問 49
Which two statements are true about managing Points of View (POVs)?

  • A. When you add a new POV, the status Is automatically set to Draft.
  • B. Global rules and rule sets are not associated with a specific POV.
  • C. You can archive POVs, but you cannot delete them.
  • D. A POVs status is automatically changed to Calculated when you calculate the POV.
  • E. All POVs are data POVs, even If the data set Is empty.

正解: A,C

 

質問 50
Which three are valid statements about batch processing in Data Management?

  • A. Batch processing does not support parallel loading of data files.
  • B. Batch processing combines one or more data load rules In a batch so you can run multiple data load rules In one step.
  • C. Batches can be executed from EPM Automate.
  • D. Batch processing combines one or more dimension builds In a batch so you can run multiple dimension builds in one step.
  • E. Service Administrators can configure security to limit which batches users can run.

正解: C,D,E

 

質問 51
......


Oracle 1Z0-1082-21 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • 更新前の分析とディメンションの更新を実行します
  • ロジックアカウントを説明し、ユースケースを特定します
トピック 2
  • Financial ReportingWebStudioを使用してレポートを設計する
  • 収益性とコスト管理の重要な概念を説明する
トピック 3
  • (新規)モデルとルールデータの検証を実行する
  • クラウドセキュリティを設定および構成する
トピック 4
  • バッチ処理の実行-バッチの定義、バッチの実行、ジョブのスケジュール
  • 収益性とコスト管理の概要
トピック 5
  • データ管理
  • PCMカスタムアプリケーションビルドの管理
  • OracleEPMCloudFoundationのユースケースを説明する

 

検証済みの1Z0-1082-21テスト問題集と解答には的確な56問題と解答があります:https://jp.fast2test.com/1Z0-1082-21-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어