2022年09月17日更新された1z0-1077-22トレーニング最新認定問題をゲットOrder Management Cloud合格目指せ [Q33-Q58]

Share

2022年09月17日更新された1z0-1077-22トレーニング最新認定問題をゲットOrder Management Cloud合格目指せ

認定トレーニング1z0-1077-22試験問題集でテストエンジン

質問 33
Your customer would like automatic e-mail notifications to be sent for specific business events. On the Manage Business Event Trigger Points page, which business event trigger points can be used to enable e-mail notifications?

  • A. Change order compensation complete and hold
  • B. Order attribute update and hold
  • C. Hold and split
  • D. Order header status update and order attribute update
  • E. Orderheader status update and hold

正解: A

 

質問 34
Your company is using Order Management Cloud to capture orders,and has integrated with a legacy inventory application for order fulfillment. A fulfillment request needs to be aggregated and sent to an external inventory application.
What step would you perform to aggregate the request?

  • A. Create a new custom task by using the Fulfillment Task Layer.
  • B. Create a new custom task byusing the Shipment Task Layer.
  • C. Configure a fulfillment task routing rule with aggregation criteria based on time limit or totalnumber of lines.
  • D. Create a new custom task by using the Supply Task Layer.

正解: C

解説:
Explanation
https://docs.oracle.com/cd/E56614_01/scmop_gs/FAOFO/F1171442AN11B74.htm

 

質問 35
In which fulfillment process does a specific sales order demand trigger a supply creation, and a firm link is established between the sales order and the supply?

  • A. Consignment order
  • B. Drop Ship
  • C. Back-to-back
  • D. Internal Transfer
  • E. Configure to order

正解: C

解説:
Explanation
The back-to-back fulfillment process is one in which specific sales order demandtriggers supply creation, and a link is established between the sales order and the supply.
References:

 

質問 36
In a Cloud Order Management implementation, a customer has order capture and fulfillment systems located across the globe. The customer would like to ensure that the time zone is reflected in each transaction based on the location of the entity.
What step is required in order toachieve this business requirement?

  • A. Select the time zone when importing a transaction to the Order Management System.
  • B. Select the time zone in user preferences when entering a transaction.
  • C. Select the time zone by using the prole option in theFunctional Setup Manager,
  • D. Select the time zone during the configuration of the Source system.

正解: B

解説:
Explanation
References:https://docs.oracle.com/cloud/farel8/common/OAIMP/F1114493AN29A3B.htm

 

質問 37
What is the configuration required to automatically calculate the Jeopardy Score and priority when an orchestration process is planned or re-planned?

  • A. Check the Replan Instantly parameter in the orchestration process.
  • B. Schedule the process refresh and start the order promising server.
  • C. Check the change mode parameter to Advanced on the orchestration process.
  • D. Schedule the process planorchestration processes.

正解: A

解説:
Explanation
You can enable the Replan Instantly feature when you define an orchestration process. It replans the orchestration process immediately after this process completes the orchestration process step, and then displays the revised order data according to the replanning work that it does. It is recommended that you use Replan Instantly only for high priority sales orders, or with sales orders that include a jeopardy threshold of less than one day. For performance reasons, it is recommended that you do not use it with an orchestration process step that is long or complex. If Replan Instantly does not contain a check mark, then Order Management updates the planning data only during the scheduled replanning.
https://docs.oracle.com/en/cloud/saas/supply-chain-management/r13-update17d/faiom/setting-up-orchestration-p

 

質問 38
Which change mode takes a snapshot at the stages mentioned below:
* When the orchestration process starts
* When a change order is received at an orchestration process step

  • A. Simple
  • B. Incremental
  • C. None
  • D. Advanced

正解: D

解説:
Explanation
http://www.oracle.com/technetwork/fusion-apps/orderorchestrationguide-e22707-01-1514572.pdf

 

質問 39
Which step must be performed before enabling a new inventory organization in SCM cloud for collection from Manage Upstream and Downstream Source System Task?

  • A. Create a new source system for each organization.
  • B. Add the Organization against the OPS destination system.
  • C. Add the Organization against the OPS source system manually.
  • D. Refresh the Organization List against the Oracle Planning and Sourcing (OPS) source system.

正解: D

解説:
Explanation
https://docs.oracle.com/en/cloud/saas/supply-chain-management/r13-update17d/faivc/implementing-planning-so

 

質問 40
Which Oracle Transactional Business Intelligence subject area should you use to build an online custom port that shows the number of orchestration orders for a selected orchestration process status?

  • A. Distributed Order Orchestration - Process Instances
  • B. Distributed Order Orchestration - Order Lines Real Time
  • C. Distributed Order Orchestration - Fulfillment Lines Real Time
  • D. Distributed Order Orchestration - Process Instances Real Time

正解: D

 

質問 41
A global Power Systems manufacturer sells Uninterrupted Power Supply (UPS) products through its online portal. To gain competitive advantage, the manufacturer wants to enhance the ability of buyers to select a desired configuration of the high-end UPS models through guided selling options on its online selling portal.
The company's product development team has finalized the enhancements, and needs your help to get them implemented on their online selling portal that is supported by Oracle Cloud Configurator.
What four actions would you take in Oracle Cloud Configurator to enhance a buyer's experience? (Choose four.)

  • A. You can display product reviews of customers who have purchased the same configuration earlier.
  • B. You can create user interfaces that will be dynamically presented to users based on the options chosen in the Configurator model.
  • C. You can create enhancements to the model structure that supplements the imported configurable structureof a model item.
  • D. You can create rules that will guide users in creating a valid model.
  • E. You can enable a checkout option for a model when a valid configuration is finalized.
  • F. You can test the behavior of the configured model anytime when you are editing it.
  • G. You can allow buyers to raise requests if an expected product functionality is not offered.

正解: A,B,C,E

 

質問 42
Identify three ongoing maintenance tasks that a user is required to execute from the Order Management Work Area after the Order Management Implementation is completed. (Choose three.)

  • A. Manage Order in Errors
  • B. Manage Source Systems
  • C. Manage Order Orchestration Messages
  • D. Manage Orchestration Statuses
  • E. Manage Fulfillment Line Exceptions

正解: A,C,E

 

質問 43
Identify two valid use cases where a process assignment rule is defined to assign an orchestration process.
(Choose two.)

  • A. when you require one orchestration process for sales order lines
  • B. when you require multiple orchestration processes for one fulfillment line
  • C. when you require one orchestration process for multiple fulfillment lines
  • D. when you require one orchestration process for one fulfillment line

正解: B,C

 

質問 44
You are revising a sales order by manually scheduling the following fulfillment line andsplitting it.
Which three order attributes can be updated for the split line? (Choose three.)

  • A. Fulfillment Line warehouse
  • B. Fulfillment Line scheduled ship date
  • C. Fulfillment Line quantity
  • D. Fulfillment Line unit selling price
  • E. Fulfillment Line shipment method

正解: A,C,E

 

質問 45
Your company is a manufacturer and distributor of CTO type of products globally, and usesGlobal Order Promising to promise its orders. You recently noticed that the promising results are determining the expected sources globally but not the least-cost ones. You want to understand the logic used by the GOP engine to derive the least-cost source.
Identify the four cost elements used by the cloud Global Order Promising engine to achieve the Profitable-to-Promise objective? (Choose four.)

  • A. Overhead Cost
  • B. Component Cost
  • C. Storage Cost (when the cost of holding that item in inventory is high)
  • D. Resource Consumption Cost (in case the end item is to be manufactured)
  • E. Standard Cost at internal organizations
  • F. Cost of internal transfers between organizations

正解: B,D,E,F

 

質問 46
You have deployed theExtensible Flexfield (EFF) successfully but it is not visible in the order capture additional information section.
Identify the two reasons for this behavior. (Choose two.)

  • A. The EFF compilation is not done.
  • B. The EFF context is not associated with the page.
  • C. The EFF segments are not defined correctly.
  • D. The EFF definition is not frozen.
  • E. The custom extensible flexfields are not published.

正解: B,E

 

質問 47
Which three statements are true about the Visual Information Builder interface? (Choose three.)

  • A. The Visual Information Builder interface is the same as the editor for Oracle Business Rules.
  • B. Post-transformation rules and external integration routing rules can be created by using the Visual Information Builder interface.
  • C. In the Visual Information Builder interface, you create external interface routing rules by using the
    "Manage External Integration Routing Rules for Sales Orders" page.
  • D. Pre-transformation rules and externalintegration routing rules can be created by using the Visual Information Builder interface.
  • E. The Visual Information Builderinterface is a simplified drag-and-drop rule editor.
  • F. In the Visual Information Builder interface, you create external interface routing rules by using the Manage External Integration Routing Rules page.

正解: D,E,F

 

質問 48
Your company, which is a global major in farming equipment, has products ranging from make-to-stock fast moving items, assembled-on-demand items, and complex configurable items with manufacturing plants and distribution centers spread across the US, Europe, and China. The company is deploying Oracle Cloud Order Management, and wants to evaluate the different promising modes that are possible through cloud Global Order Promising for its products.
Which three promising modes are possible through GOP for the company's products? (Choose three.)

  • A. zone-based availability
  • B. lead times
  • C. global availability
  • D. supply chain availability
  • E. infinite availability

正解: B,D,E

解説:
Explanation
https://docs.oracle.com/en/cloud/saas/supply-chain-management/r13-update17d/fascp/manage-order-promising-r ATP RulePromising Modes: ExplainedThe promising mode of an available-to-promise (ATP) rule determines which set of attributes the order promising logic evaluates when determining ATP results. When creating an ATP rule on the Manage ATP Rules page, the first thingthat you must specify is which of the three promising modes is applicable to the ATP rule.
These are the three promising modes:
Supply chain availability search
Lead time based
Infinite availability based

 

質問 49
A manufacturer who ships perfumes across countries requires a cost breakdown associated with multiple shipping methods (air, land, and sea).
Which four charges would you need to use in the ocean freight shipping rules? (Choose four.)

  • A. Duty
  • B. Recurring
  • C. GSA
  • D. Handling
  • E. Insurance
  • F. Freight

正解: A,D,E,F

 

質問 50
Your customer is concerned about not having access to schedule orders and check availability when the Global OrderPromising server is down. Which two statements are true? (Choose two.)

  • A. Global Order Promising continues promising orders based on lead-time availability until the server or backup server can be restarted.
  • B. Global Order Promising cannot continue promising orders, but the server or backup server is usually restarted quickly.
  • C. Affected orders cannot be rescheduled based on supply chain availability search after server recovery.
  • D. Affected orders can be rescheduled based on supply chain availability search after server recovery.
  • E. Global Order Promising continues promising orders based on supply chain availability search until the server or backup server can be restarted.

正解: D,E

 

質問 51
Which twoattributes can you use to group shipment lines into a single shipment? (Choose two.)

  • A. FOB
  • B. Ship-to location
  • C. Item
  • D. Sales Order
  • E. Carrier

正解: A,B

解説:
Explanation
A shipment comprises a set of shipment lines, grouped by certain common shippingattributes, that are scheduled to be shipped to a customer's ship-to location on a specific date and time. You can include items from different sales orders in a shipment. You can either manually or automatically group shipment lines to create a shipment.The shipment lines are grouped by the mandatory default criteria: ship-from location and ship-to location. However, you may also include additional grouping criteria, such as customer, freight terms, FOB (Free on board), and shipping method.
References:

 

質問 52
Your customerwants to prohibit updates to the "Subcontractor License No" field in a fulfillment line after a fulfillment line is closed. The "Subcontractor License No" field is a context-based extensible flexfield in the fulfillment line.
Identify the correct sequenceof steps for setting up the preceding constraint.

  • A. Enable the extensible flexfield > Create a validation rule set > Create a record set > Create the processing constraint.
  • B. Enable the extensible flexfield > Create a record set > Create a validation rule set > Create the processing constraint.
  • C. Create a constraint entity > Enable the extensible flexfield > Create a validation rule set > Create a record set > Create a processing constraint.
  • D. Create a constraint entity > Enable the extensible flexfield > Create a record set > Create a validation rule set > Create a processing constraint.
  • E. Enable the extensible exfield > Create a validation ruleset > Create the processing constraint.

正解: E

解説:
Explanation
Extensible flexfields are not availableon the Attributes menu of the Record Sets tab.To constrain the changes that a user can make in an extensible flexfield, do the following work:1. Enable the extensible flexfield.2.
Create a validation rule set.3. Create a processing constraint.

 

質問 53
Your company has a single global installation that contains Oracle Cloud Product Management, Oracle Cloud Trading Community Model, and Cloud Order Management. It has all the execution systems implemented in tandem withGlobal Order Promising. The Master data elements have also been migrated to their respective areas. The next step is to run the date collection program to load the planning data repository.
Which five data elements will the collection program load into the planning data repository? (Choose five.)

  • A. Customers
  • B. Suppliers
  • C. Calendars
  • D. Shipping methods
  • E. Cross-referenced data
  • F. Items
  • G. Currencies

正解: A,B,C,E,F

 

質問 54
Which process requires the Release Planning recommendation process to be executed manually so that a supply order gets created?

  • A. Manual orders using File Based Data Load
  • B. Back-to-Back Order
  • C. Drop Ship Order
  • D. Min-Max planning replenishing a purchase request
  • E. Min-Max planning replenishing a transfer order

正解: B

解説:
Explanation
http://docs.oracle.com/cloud/latest/scmcs_gs/FASCP/FASCP2577133.htm#FASCP2577137

 

質問 55
Which four options apply to the "Lead Time" mode? (Choose four.)

  • A. Calendars and transit time constraints are respected.
  • B. The order promising engine does not generate any pegging.
  • C. The item is promised on the requested date irrespective ofavailability.
  • D. No supply availability search is performed.
  • E. Lead time can be specified in multiple ways.

正解: A,B,D,E

 

質問 56
Your customer uses an external order capture system and wants to perform certain actions without routing them through Order Management. Which three services are available for the external system to call from Global Order Promising using public web services? (Choose three.)

  • A. Cancel Scheduling
  • B. Return Order Lines
  • C. Ship Order Lines
  • D. Check Availability
  • E. Schedule Order Lines

正解: A,D,E

 

質問 57
Which three predefined orchestration groups should you use while assigning an orchestration process to fulfillment lines in process assignment rules? (Choose three.)

  • A. Shipment Set
  • B. Standard
  • C. Model / Kit
  • D. Order Type
  • E. Order Attribute

正解: A,B,C

 

質問 58
......


Oracle 1z0-1077-22 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • 高度なフルフィルメントと統合
  • 注文の改訂 (追加、変更、またはキャンセル)
トピック 2
  • 制約と保留コードの処理
  • インターフェイス テーブルからの注文の削除
  • オーケストレーション プロセスの管理
トピック 3
  • Configurator Modelsを使用して、サービスおよび関連アイテムを構成します
  • Oracle Order to Cash Cloudの概要
トピック 4
  • Oracle Transactional Business Intelligence (OTBI) メトリクスの設定
  • 変更管理とプロセスの割り当て
トピック 5
  • 事前注文処理 (Back to Back、ISO、DropShip) の説明
  • セールス オーダーの変更管理の構成
トピック 6
  • 構成可能な製品で構成可能なオプションを選択する
  • 調達と製造を通じて注文を履行する
トピック 7
  • 一般的な在庫構成の説明
  • マルチチャネル ユーザー インターフェイスの作成
トピック 8
  • 制約エンティティと処理制約 (注文の検証を含む) を作成する
  • グローバル オーダー プロミスを管理する

 

合格を確定するガイドで1z0-1077-22試験準備しよう:https://jp.fast2test.com/1z0-1077-22-premium-file.html

Order Management Cloud 1z0-1077-22無料最新のリアル試験問題と回答:https://drive.google.com/open?id=10RXTpnec0B6144MTYIa9CD7gJhaCQ2Kn


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어