質問 20
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.
- A. The upgrade of the PRD must be finished before you start new development in the DEV.
- B. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
- C. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
- D. The transport between Unicode and non-Unicode systems is forbidden.
正解: B
質問 21
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:
- A. It is a database-specific document
- B. It contains a section "free space requirements"
- C. It is target release specific
- D. It contains a troubleshooting section
正解: B,C
質問 22
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:
- A. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
- B. The SAP Support Packages found in the download directory
- C. The SAP Support Packages that will be bound to the upgrade
- D. The SAP Support Packages contained in the upgrade media
正解: B
質問 23
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:
- A. In Process Control Center
- B. In SUM Parameters
- C. In SUM Phaselist
- D. In DMO Migration Preparation
正解: A,B
質問 24
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:
- A. Specify the business functions that need to be switched on during the prepare part of SUM.
- B. Import a transport request from the development system that contains the recording of the activation.
- C. Activate the required business functions manually in the production system.
- D. During conversion, SUM delivers some business functions already activated.
正解: B,D
質問 25
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:
- A. Breakpoint configuration file SAPUPPHAS.BRK
- B. MIGRATE_DT_DUR_XML file from a previous run
- C. Stack XML file calculated by the Maintenance Planner
- D. Parameter file SAPup_add.par
正解: B,C
質問 26
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.
- A. Kernel for target release, Linux, SAP HANA
- B. Kernel for target release, Windows, SAP MaxDB
- C. Kernel for source release, Windows, SAP MaxDB
- D. Kernel for target release, Windows, SAP HANA
正解: C,D
質問 27
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:
- A. Using DMO when applying Support Packages to SAP ECC 6.07
- B. SAP S/4HANA conversion to SAP S/4HANA 1709
- C. Upgrading to SAP ECC 6.08 without using DMO
- D. Updating to SAP ECC 6.07 using DMO
正解: B,C
質問 28
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:
- A. By searching for transport requests that are assigned to the project SAP_ADJUST
- B. By searching for transport requests in the file umodauto.Ist
- C. By searching for transport requests in DIR_TRANS, subdirectory "transport"
- D. By searching for transport requests named <SID>K0<number>
正解: B
質問 29
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA.
The source system is non-Unicode and the target database is a scale-out system.
What do you need to consider?
There are 2 correct answers to this question.
- A. SAP HANA Landscape Reorganization requires a manual step to edit a file.
- B. The target database size increases temporarily because of the Shadow Repository.
- C. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
- D. Network capacity between exporting and importing R31oad processes must be considered.
正解: A,C
質問 30
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:
- A. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
- B. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
- C. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
- D. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
正解: B
質問 31
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:
- A. Delete client 066 (Early Watch Client)
- B. Uninstall Fiori apps not released for SAP_UI 7.50
- C. Install add-on SAP Gateway 7.50
- D. Uninstall industry extensions not supported by SAP S/4HANA
正解: A,B
質問 32
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:
- A. SYCM (Simplification Database Content)
- B. SAT (Runtime Analysis)
- C. ATC (ABAP Test Cockpit)
- D. SE80 (Object Navigator)
正解: C,D
質問 33
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?
- A. AA
- B. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
正解: B
質問 34
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:
- A. Downtime migration (EU_CLONE_MIG_DT_RUN)
- B. Shadow repository creation (EU_IMPORT*)
- C. ParaUel distribution (PARDIST_SHD)
- D. Uptime migration (EU_CLONE_MIG_UT_RUN)
正解: D
質問 35
During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?
There are 3 correct answers to this question.
Response:
- A. Execution of eCATTs for business validation tests
- B. Execution of XPRAs and AIMs
- C. Execution of SPDD modification adjustment
- D. Execution of SPAU modification adjustment
- E. Creation of the table structures in the new SAP HANA database
正解: A,B,D
質問 36
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:
- A. A change of the database type is performed, without changing the software components.
- B. An SAP S/4HANA conversion is performed, without adapting the customer data.
- C. An upgrade of the software components is performed, without changing the database type.
- D. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
正解: A
質問 37
......