[2022年02月25日] 実際のC-TPLM30-67試験問題集は2022年最新のSAP練習試験合格させます
2022年最新の実際にあるC-TPLM30-67問題集テストエンジン試験問題はここにある
SAP C-TPLM30-67 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
| トピック 5 |
|
質問 49
Which rule applies to user status in orders and notifications?
Please choose the correct answer.
Response:
- A. The user status in the notification can be copied into the order.
- B. When a user status is flagged as an initial status, it overrides the initial system status CRTD.
- C. When you set a new user status with a status number, the previous user status with status number is deactivated.
- D. Every user, regardless of assigned authorizations, can assign a user status.
正解: C
質問 50
You are installing a new SC9000. Which procedure should be used to install and configure the system?
- A. Connect through the Dell Storage Manager Client
- B. Connect through the supplied proprietary serial cable to the serial port
- C. Connect through the iDRAC port
- D. Connect through a null modem cable to the serial port
正解: B
質問 51
What is the definition of a Data Source?
- A. An extraction structure for data transfer to SAP BusinessWarehouse.
- B. All available data of a business transaction type.
- C. A superordinate term for BI objects that can be analyzed using BEx queries.
- D. A superordinate term for characteristics, key figures, and units.
正解: A
質問 52
What are the purposes of technical object structures? (Choose three)
- A. To collect historical data for maintenance objects
- B. To identify objects and object parts for maintenance
- C. To display the total number of an asset's individual parts from a design engineering perspective
- D. To enable detailed cost analyses
- E. To support Asset Accounting in the description of fixed assets
正解: A,B,D
質問 53
A maintenance work order has external processing. The planning plant and maintenance plant have different addresses. A purchase requisition is generated from a maintenance order.
With standard delivered SAP Customizing, which address is the default delivery address in the purchase requisition?
- A. Storage location
- B. Planning plant
- C. Maintenance plant
- D. Work center
正解: B
質問 54
A customer has two production sites with one storage administrator at each site. The customer wants to replicate data between their SC9000 storage arrays. Each administrator uses a workstation with the Dell Storage Manager Client to manage their respective system. Now, the CEO wants data replicated between both sites.
What is the first step to configure replication between sites?
- A. Install Dell Storage Manager Data Collector
- B. Create a QoS node in Dell Storage Manager Client
- C. Configure an iSCSI network over WAN
- D. Initially sync data with USB hard drives
正解: A
質問 55
What does the notification type define? (Choose three)
- A. The scheduling type
- B. The number assignment of the notification
- C. The planner group
- D. The reference object view
- E. The catalog or catalog profile
正解: B,D,E
質問 56
Identifies the various ways to navigate around SAP system.
There are 2 correct answers to this question.
Response:
- A. Insert
- B. Text
- C. Using the favorites list
- D. Clipboard
- E. Using the menu entries
正解: C,E
質問 57
Which of the following combinations must you use to create a single-cycle maintenance plan for an external service?
- A. A framework order and a maintenance order for settlement
- B. A maintenance order for settlement and an outline agreement
- C. A subcontract purchase order and an outline agreement
- D. A framework order and a subcontract purchase order
正解: A
質問 58
When the user creates a maintenance plan for a call object (order), which value in the planning data determines the order type?
- A. Main work center
- B. Maintenance activity type
- C. Priority
- D. Maintenance planner group
正解: D
質問 59
What are the general settings of maintenance notification?
There are 3 correct answers to this question.
Response:
- A. Catalog
- B. Managerial values
- C. Condition indicator
- D. Field selection
- E. List editor
正解: C,D,E
質問 60
Your customer uses operating hours to execute a performance-based maintenance plan.
Which of the following data must you assign in the maintenance plan header?
- A. A cycle unit of measure with a corresponding characteristic from the measuring point
- B. A task list for performance-based maintenance
- C. An order type for performance-based maintenance
- D. A technical object with a measuring point
正解: A
質問 61
A user has planned an operation with labor costs and material costs; however, the material cost element is not assigned to a value category.
Where do the material costs appear in the value categories for the order?
- A. In the unassigned value category
- B. In the internal activity value category
- C. In a new, automatically created value category
- D. In the overhead value category
正解: A
質問 62
What do you use to set up a refurbishment order for external refurbishment?
- A. An order type for external refurbishment and a material item with item category External
Refurbishment. - B. An order type for external refurbishment and an assignment of a material with split valuation.
- C. An external operation that contains a control key for refurbishment.
- D. An external operation that contains a subcontracting indicator and a material item with a material provision indicator activated.
正解: D
質問 63
What are the possible methods to upgrade the firmware on a Brocade switch?
- A. USB, FTP, and SFTP
- B. USB, SFTP, and Web Tools
- C. USB, FTP, and Web Tools
- D. FTP, SFTP, and Web Tools
正解: C
質問 64
......
更新された問題を提供していますC-TPLM30-67問題集PDF:https://jp.fast2test.com/C-TPLM30-67-premium-file.html