
2022年最新の実際に出るC-TS4CO-2020問題集には試験のコツがあるPDF試験材料
心強いC-TS4CO-2020PDF問題集はC-TS4CO-2020問題
質問 107
You are setting up costing-based Profitability Analysis for your organization. How do you configure the different market segments?
- A. As key figures
- B. As divisions
- C. As characteristics
- D. As value fields
正解: C
質問 108
You want to create a new standard cost estimate based on the quantity structure of the existing standard cost estimate. Which object do you use ?
- A. Reference variance
- B. Transfer control
- C. Costing version
- D. Costing type
正解: D
質問 109
What master data objects can you set up using time-based fields? Note: There are 2 correct answers to this question.
- A. Statistical key figures
- B. Cost element
- C. Activity type
- D. Cost centers
正解: C,D
質問 110
You configured an overhead costing sheet that uses the quantity-based overhead approach to calculate the overhead amount. What is required for the amount to be calculated?
- A. Statistically figures with values for the period
- B. Cost accounts with the option to record quantity
- C. Activity types with actual or plan quantities maintained
- D. Settlement rules with valid receiver objects
正解: C
質問 111
In which module do you process profit center allocations in SAP S4/HANA
- A. Cost center Accounting
- B. Product Cost Accounting
- C. Profit center Accounting
- D. General Ledger Accounting
正解: C
質問 112
Where do you activate commitment management for internal orders? There are TWO correct answers for this question
- A. In the company code
- B. In the budget profile
- C. In the controlling area
- D. In the order type
正解: C,D
質問 113
Which activity do you perform during period-end in profit center accounting?
- A. Post activity allocation
- B. Process distribution cycles
- C. Execute template allocation
- D. Settle costs
正解: B
質問 114
You want to determine which operations of the oruting should be considered in a product cost calculation. How do you do this ? 2 Answers
- A. By assigning a cost center top the work center in the operation
- B. By defining a usage key in the header of the routing
- C. By marking the Relevance to Costing indicator in the operation
- D. By marking the cost indicator in the control key assigned to the operation
正解: C,D
質問 115
What do you do to create a primary cost component split? There are TWO correct answers for this question
- A. Enter split activity prices manually
- B. Use the cost splitting tool on cost centers
- C. Assign a cost component structure to the CO-version
- D. Run an activity price calculation
正解: C,D
質問 116
Why would you use manual cost allocation in Controlling? Note: There are 2 correct answers to this question.
- A. To allocate costs using an allocation cycle
- B. To run simple allocations of plan data
- C. To run simple allocations of actual data
- D. To correct secondary postings
正解: C,D
質問 117
You want to determine which operations of the routing should be considered in a product cost calculation. How do you do this? Note: There are 2 correct answers to this question.
- A. By marking the Relevance to Costing indicator in the operation
- B. By defining a usage key in the header of the routing.
- C. By marking the cost indicator in the control key assigned to the operation
- D. By assigning a cost center to the work center in the operation
正解: A,C
質問 118
You are posting a purchase order for a warehouse material. From which object is the profit center derived?
Response:
- A. Business partner
- B. Material master
- C. Cost center
- D. Plant
正解: B
質問 119
You have implemented Product Cost by Sales Oder in conjunction with cost-based POC results analysis in your organization.
For a particular sales order item, you have the following:
Plan revenue = 3000; Plan costs = 2000
Actual revenue = 1200; Actual cost=1000
What data does the system calculate during results analysis?
- A. "Revenue = 1200; Cost of sales = 1000; Revenue surplus =200"
- B. "Revenue = 1500; Cost of sales = 1000; Revenue surplus =300"
- C. "Revenue = 1500; Cost of sales = 1000; Capitalized revenue (revenue in excess of billings) = 300"
- D. "Revenue = 1200; Cost of sales = 1000; Capitalized revenue (revenue in excess of billings) = 200"
正解: C
質問 120
Which activities can you perform while you create cost center hierarchies? There are 2 correct answers to this question
- A. Append nodes and cost centers to a node of the standard hierarchy.
- B. Create a cost center without specifying a standard hierarchy
- C. Reassign a cost center to another node of the standard hierarchy.
- D. Assign a standard hierarchy to several controlling areas.
正解: A,C
質問 121
Which characteristic of an internal order does the order type control?
- A. Budget profile assigned to the order
- B. Types of costs posted to the order
- C. Controlling areas the order is assigned to
- D. Time period for which the order is valid
正解: A
質問 122
Which settings can you configure per order type for the budget and availability control? There are TWO correct answers for this question
- A. Design budget manager
- B. Budget data entry layout
- C. Budgeting on cost element level
- D. Budget tolerance limits
正解: C,D
質問 123
What can you use to difference two or more cost estimates for the same material? There are TWO correct answers for this question
- A. Costing variant
- B. Transfer control
- C. Costing version
- D. Valuation variant
正解: A,D
質問 124
You want to run an assessment cycle in Profitability Analysis to allocate cost centers costs during period- end closing for your organization. Which of the following objects is part of the assessment cycle?
- A. Tracing factor
- B. Template
- C. PA transfer structure
- D. Cycle iteration
正解: A
質問 125
You want to prevent reporting extreme periodic fluctuations in your P&L statement. Which Management Accounting activity should you choose to help spread irregular expenses throughout the fiscal year?
- A. Accrual calculation
- B. Indirect activity allocation
- C. Periodic reporting
- D. Budget availability control
正解: A
質問 126
For which objects can you enter statistical key figures? Note: There are 3 correct answers to this question.
- A. Cost elements
- B. Internal orders
- C. Functional areas
- D. Profit centers
- E. Cost centers
正解: B,D,E
質問 127
......
SAP C-TS4CO-2020 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
| トピック 5 |
|
結果を保証するには最新2022年03月無料:https://jp.fast2test.com/C-TS4CO-2020-premium-file.html