100%無料VCAP-NV Design 2020 3V0-42.20問題集PDFお試しサンプル認定ガイドカバー率
PDF試験材料2024年最新の実際に出る3V0-42.20問題集
Advanced Design VMware NSX-T Data Center認定試験としても知られるVMware 3V0-42.20は、データセンターで仮想化ソリューションの設計と実装に関与しているIT専門家にとって非常に人気のある認定です。この認定は、VMware NSX-Tデータセンターソリューションの設計と実装に関する候補者の専門知識を検証します。
VMware 3V0-42.20の試験は60問の選択式問題で、候補者は120分以内に完了する必要があります。試験はNSX-Tのアーキテクチャと構成要素、ネットワークおよびセキュリティサービス、自動化およびオーケストレーション、トラブルシューティングおよび最適化などのトピックをカバーしています。
質問 # 34
An architect is helping an organization with the Logical Design of an NSX-T Data Center solution.
This information was gathered during the Assessment Phase:
There is a performance based SLA for East - West traffic.
The business critical applications require prioritization of their traffic.
One of the services is a file share and has a high demand for bandwidth.
Which selection should the architect include in their design? (Choose the best answer.)
- A. Include a segment QoS profile and review the impact of utilizing this feature.
- B. Monitor East-West traffic throughout normal business cycles.
- C. Meet with the organization's application team to get additional information.
- D. Review average North/South traffic from the core switches and firewall.
正解:A
解説:
QoS provides high-quality and dedicated network performance for preferred traffic that requires high bandwidth. The QoS mechanism does this by prioritizing sufficient bandwidth, controlling latency and jitter, and reducing data loss for preferred packets even when there is a network congestion. Taken from https://docs.vmware.com/en/VMware-NSX-T-Data-Center/3.0/administration/GUID-62BB7145-EDD7-4611-A50D-17F4A0EAE57C.html
質問 # 35
Which selection must be taken into consideration when creating a Logical Design for a planned migration? (Choose the best answer.)
- A. An N-VDS can only attach to a single Overlay transport zone.
- B. An N-VDS must be disabled before attaching both Overlay and VLAN transport zones.
- C. An N-VDS can only attach to a single VLAN transport zone.
- D. An N-VDS can attach to both an Overlay and a VLAN transport zone to a N-VDS having different name/s.
正解:C
質問 # 36
An architect is helping an organization with the Logical Design of an NSX-T Data Center solution. This information was gathered during the Assessment Phase:
NSX-T will span across two sites for disaster recovery.
Public Load Balancer VIP should be accessible from a secondary site.
Distributed Firewall Policies should be available at a secondary site.
Routing capabilities should be maintained after failure.
NAT capabilities are required.
Which two selections should the architect include in their design? (Choose two.)
- A. Set MTU to 1550 between sites.
- B. Use two separate ISPs across sites.
- C. Use IP sets or groups to configure DFW rules.
- D. Use MTU to 1550 between sites.
- E. Use of the same ISPs across sites.
正解:C、E
解説:
https://docs.vmware.com/en/VMware-NSX-T-Data-Center/3.0/administration/GUID-5D7E3D43-6497-4273-99C1-77613C36AD75.html
質問 # 37
An architect is helping an organization with the Physical Design of an NSX-T Data Center solution. This information was gathered during a workshop about ESXi Host networking:
A total of 50 ESXi hosts to be configured as Transport Nodes.
All ESXi hosts have a dedicated 2 X Intel 10Gbps Physical Network adapter for the Overlay Traffic.
To achieve low latency, high throughput, redundancy, and performance, which two NIC teaming policies should the architect recommend? (Choose two.)
- A. Load Balance Source Port ID
- B. Load Balance Source
- C. Load Balance Source MAC
- D. Load Balance Port ID
- E. Failover Order
正解:B、C
解説:
Uplink profiles within NSX-T shows that you can only use Load balance Source and Load balance Source MAC, failover order doesnt provide any load balancing or high throughput https://docs.vmware.com/en/VMware-NSX-T-Data-Center/3.1/installation/GUID-50FDFDFB-F660-4269-9503-39AE2BBA95B4.html
https://docs.vmware.com/en/VMware-NSX-T-Data-Center/3.2/installation/GUID-50FDFDFB-F660-4269-9503-39AE2BBA95B4.html Failover Order: Select an active uplink is specified along with an optional list of standby uplinks. If the active uplink fails, the next uplink in the standby list replaces the active uplink. No actual load balancing is performed with this option. Load Balance Source: Select a list of active uplinks. When you configure a transport node, you can pin each interface of the transport node to one active uplink. This configuration allows use of several active uplinks at the same time. Load Balance Source MAC Address: Select an uplink based on a hash of the source Ethernet.
質問 # 38
An architect is helping an organization with the Logical Design of an NSX-T Data Center solution. This information was gathered during the Assessment Phase:
There isn't much budget available for a new off shore site.
The new site is decentralized and no communication with the main data center is required.
The design will need to cater for availability, upgrades, and failure scenarios.
N+1 must be maintained at all times.
Which three selections should the architect recommend in their design? (Choose three.)
- A. Collapse the Management/Edge/Compute cluster.
- B. Install a minimum of 3 ESXi hosts in the site.
- C. Install a minimum 4 ESXi hosts in the site.
- D. Make all pNICs part of N-VDS and VMKs will be migrated.
- E. A Shared Edge/Management cluster and one for Compute.
- F. Separate the hosts physical NICs for VSS and N-VDS.
正解:C、D、E
質問 # 39
Which selection must be taken into consideration when creating a Logical Design for a planned migration?
(Choose the best answer.)
- A. An N-VDS can only attach to a single Overlay transport zone.
- B. An N-VDS can attach to both an Overlay and a VLAN transport zone to a N-VDS having different name/ s.
- C. An N-VDS must be disabled before attaching both Overlay and VLAN transport zones.
- D. An N-VDS can only attach to a single VLAN transport zone.
正解:D
質問 # 40
An architect is helping an organization with the Logical Design of an NSX-T Data Center solution. Which two statements should the architect consider as non-technical requirements? (Choose two.)
- A. Different vendors are used for the storage solution.
- B. All application servers have hardcoded IP addresses.
- C. Any solution should add more value to current and future customers engagements.
- D. The design should offer agility and freedom for application phases.
- E. Current business continuity and disaster recovery plans are based on tape technology.
正解:C、D
質問 # 41
Which two resources can be used by an NSX architect during the Assessment Phase? (Choose two.)
- A. application licensing
- B. VMware customer references
- C. VMware Validated Design
- D. key stakeholder interviews
- E. vRealize Network Insight
正解:D、E
質問 # 42
Which three choices are part of a Design Approach when discussing design alternatives and their effects? (Choose three.)
- A. backup
- B. security
- C. knowledge
- D. budget
- E. performance
- F. cost
正解:B、C、E
質問 # 43
Which three choices are part of a Design Approach when discussing design alternatives and their effects? (Choose three.)
- A. backup
- B. security
- C. budget
- D. cost
- E. performance
- F. knowledge
正解:B、D、E
解説:
"Design qualifiers ensure that all levels of the engagement are met. Each qualifier affects the other qualifiers. Design qualifiers include: * Availability * Manageability * Performance * Recoverability * Security * Cost"
質問 # 44
An architect is helping an organization with the Logical Design of an NSX-T Data Center solution.
This information was gathered during the Assessment Phase:
NSX-T will span across two sites for disaster recovery.
Public Load Balancer VIP should be accessible from a secondary site.
Distributed Firewall Policies should be available at a secondary site.
Routing capabilities should be maintained after failure.
NAT capabilities are required.
Which two selections should the architect include in their design? (Choose two.)
- A. Set MTU to 1550 between sites.
- B. Use two separate ISPs across sites.
- C. Use IP sets or groups to configure DFW rules.
- D. Use MTU to 1550 between sites.
- E. Use of the same ISPs across sites.
正解:C、E
解説:
Reference:
site-solutions-cross-vcenter-nsx-design-guide.pdf
質問 # 45
An architect is helping an organization with the Physical Design of an NSX-T Data Center solution.
This information was gathered during a workshop:
The company will use a Leaf and Spine physical network architecture with Layer 3 gateways for top of rack switches.
The company is planning to deploy 120 ESX hosts across 10 racks.
There will be a total of a 12 clusters where each cluster has one host per rack.
What should the architect recommend to allow applications to run on any host in the cluster? (Choose the best answer.)
- A. Deploy all application networks on NSX segments.
- B. Deploy a Tier-0 gateway per Rack and configure BGP between racks.
- C. Deploy a Tier-1 gateway per Rack and configure BGP between racks.
- D. Deploy an L2 VPN to allow the networks to extend to each host.
正解:C
質問 # 46
A Solutions Architect is working with a customer which wants to extend their traditional Telco IP/MPLS core network to an NFV cloud.
Which NSX-T Data Center feature can be recommended by the architect? (Choose the best answer.)
- A. Distributed IDS
- B. BGP
- C. Load Balancer
- D. EVPN
正解:D
解説:
In NSX-T Data Center 3.0, EVPN is used to extend traditional Telco networks to NFV clouds:
- Telco virtual router use BPG to dynamically exchange tenant routing with NSX gateways.
- NSX gateways implement VRFs to provide isolation between tenants.
- NSX gateways support MP-BPG to interconnect Telco traditional networks with NSX virtual networks.
- VXLAN is the encaptulation supported to exchange traffic with the remote gateways.
Taken from NSX-T ICM 3.0 Lecture Manual - Telco NFV Solution
質問 # 47
Which two benefits can be achieved using in-band management of an NSX Bare Metal Edge Node? (Choose two.)
- A. Reduces egress data.
- B. Preserves switchports.
- C. Preserves packet locality.
- D. Reduces cost.
- E. Reduces storage requirements.
正解:B、D
解説:
https://docs.vmware.com/en/VMware-Validated-Design/services/deployment-of-nsx-t-edge-nodes-on-bare-metal-hardware-for-vmware-cloud-foundation-40/GUID-AAA3EDD0-2F19-49F8-B9B3-F5B1505CBB28.html
質問 # 48
A Solutions Architect is designing an environment with 1,200 services being offered through the NSX-T Data Center Load Balancer.
Which three selections are necessary to meet the minimum requirements to support the solution? (Choose three.)
- A. Tier 1 Gateway
- B. Extra Large Load Balancer
- C. Large Load Balancer
- D. Tier 0 Gateway
- E. Large Edge Node
- F. Extra Large Edge Node
正解:A、C、E
質問 # 49
Refer to the exhibits.
Design Option1:
Design Option 2:
Design Option 3:
Design Option 4:
An architect is helping an organization with the Conceptual Design of an NSX-T Data Center solution.
The conceptual design includes these requirements, assumptions, constraints, and risks:
Critical applications must run across sites without changing IP address.
Business continuity and disaster recovery (BCDR) plans will leverage a second site running vSphere.
RTO/RPO must be reduced for recovery of applications on secondary site.
IT Teams require automation tools for configuration.
Which Conceptual Design would the architect recommend to the customer? (Choose the best answer.)
- A. Design Option 1
- B. Design Option 2
- C. Design Option 3
- D. Design Option 4
正解:A
質問 # 50
......
更新されたのはVMware 3V0-42.20問題集PDFオンラインエンジン:https://jp.fast2test.com/3V0-42.20-premium-file.html
3V0-42.20.PDFで問題解答PDFサンプル問題信頼され続ける:https://drive.google.com/open?id=1oP40P7WQCNo7q1uxVvRICc8nIuXNA0ka