
無料提供中のDevelopment-Lifecycle-and-Deployment-Designer試験問題集で(2024年最新のPDF問題集)信頼度の高いテストエンジン
Development-Lifecycle-and-Deployment-DesignerのPDFで最近更新された問題です集試験点数を伸ばそう
Salesforce Development-Lifecycle-and Deployment-Designer試験は、Salesforceコミュニティで挑戦的であるが非常に尊敬される認定です。試験に合格した候補者は、Salesforce開発ライフサイクルと展開の原則、およびプロセスで使用されるベストプラクティスとツールについての深い理解を示しています。この認定は雇用主によって高く評価されており、専門家がSalesforceエコシステムでのキャリアを前進させるのに役立ちます。
質問 # 124
Universal Containers CUC) has been on the org development model with scratch orgs are already enabled, but they haven't been taking advantage of the scratch orgs.
Now UC is ready to move to the package development model.
What step must be done by an administrator?
- A. In setup, switch the Enable Dev Hub to Enabled, then switch the Enable Source Tracking for Scratch Orgs to Enabled.
- B. In setup, switch the Enable Unlocked Packages to Enabled, keep the Enable Second-Generation Managed Packages as disabled.
- C. In setup, switch both the Enable Dev Hub and Enable 2nd-Generation Managed Packages to Enabled.
- D. In setup, switch the Enable Unlocked Packages and Second-Generation Managed Packages to Enabled.
正解:A
質問 # 125
Universal Containers is in the process of testing their integration between salesforce and their on-premise ERP systems. The testing team has requested a sandbox with up to 10,000 records in each object to benchmark the integration performance. What is the fastest approach an Architect should recommend?
- A. Spin off a partial copy sandbox using a sandbox template with all the objects required for testing the integration.
- B. Spin off a full copy sandbox with all the objects that are required for testing the integration.
- C. Spin off a Development sandbox, migrate the metadata and load the data using data loader.
- D. Spin off a Developer pro sandbox, migrate the metadata and load the data using data loader.
正解:A
質問 # 126
Universal Containers (UC) development team is using an Agile tool to track the status of build items, but only in terms of stages. UC is not able to track any effort estimates, log any hours worked, or keep track of remaining effort. For what reasons should UC consider using the agile tool for effort tracking?
- A. Allows the Developer to compare their effort, estimates and actuals to better adjust their future estimates.
- B. Allows the organization to track the Developers work hours for salary compensation purposes.
- C. Allows the management team to make critical timeline commitments based solely on developer estimates.
- D. Allows the management team to manage the performance of bad developers who are slacking off.
正解:A
質問 # 127
Cloud Kicks is switching to Salesforce from a different CRM. They have existing datasets for all standard Salesforce objects. In which optimized order should the architect recommend these objects be loaded?
- A. Leads, Contacts, Accounts, Opportunities, Products, Opportunity Line Items
- B. Leads, Accounts, Contacts, Products, Opportunities, Opportunity Line Items
- C. Accounts, Contacts. Opportunities, Products, Opportunity Line Items, Leads
- D. Accounts, Contacts, Leads, Products, Opportunities, Opportunity Line Items
正解:B
質問 # 128
Cloud Kicks is switching to Salesforce from a different CRM. They have existing datasets for all standard Salesforce objects.
In which optimized order should the architect recommend these objects be loaded?
- A. Accounts, Contacts, Opportunities, Products, Opportunity Line Items, Leads
- B. Leads, Contacts, Accounts, Opportunities, Products, Opportunity Line Items
- C. Leads, Accounts, Contacts, Products, Opportunities, Opportunity Line Items
- D. Accounts, Contacts, Leads, Products, Opportunities, Opportunity Line Items
正解:B
質問 # 129
Universal Containers has seven orgs in different regions. Its processes are global and standardized but each region needs the flexibility to be able to understand the global code and customize some aspects for its regions.
Which development model is optimized for this need?
- A. Use unlocked packages to deploy the global code and allow each country to create its customized unlocked package extensions,
- B. Use a managed package for global code and another managed package for ail regions code.
- C. Create a centralized Git with all the code and where the global team approves the changes made by the local teams.
- D. Use a managed package to deploy the global code and allow local teams to request the addition of code within that package.
正解:A
質問 # 130
Universal Containers (UC) operates globally from different geographical locations. UC is revisiting their current org strategy.
Which three factors should an Architect consider for a single org strategy? (Choose three.)
- A. Centralized data location
- B. Tailored implementation
- C. Consistent processes across the business
- D. Fewer interdependencies
- E. Increased ability to collaborate
正解:A、C、E
質問 # 131
Universal Containers (UC) is using Sales and Service Cloud. They have two major releases and four minor releases every year. They have development (dev), integration, user acceptance (UAT), staging, and hotfix sandboxes.
- A. Follow the release management process to move to production.
- B. Fix the issue in hotfix, test, and deploy to production.
- C. Fix the issue in development, test in UAT, and deploy to production.
- D. Fix the issue in staging and deploy it to production.
正解:B
解説:
Explanation/Reference:
質問 # 132
Universal Containers has development teams working on multiple projects. They are exploring a source control tool to track and manage their code/configuration.
Which two benefits does a source control tool provide? (Choose two.)
- A. Provides the ability to automatically identify issues in code/configuration.
- B. Provides the ability to back up code/configuration changes.
- C. Provides automated code/configuration deployments.
- D. Provides the ability for distributed teams to work in isolation.
正解:B、D
質問 # 133
Universal Containers is delivering many changes to its Salesforce system. Adoption reports are discovering that many features are unused. The steering committee wants this to change and is looking to the architect for advice.
What should an architect recommend to overcome this?
- A. Stop development until current features start being used.
- B. Sending weekly communication emails reporting on least engaged users
- C. Using Lightning Web Components for every user interface.
- D. Adopting user centered design to understand user needs before building the solution.
正解:D
質問 # 134
Universal Containers (UC) is preparing for the new Salesforce release in a couple of months, and has several ongoing development projects that may be affected.
Which three steps should the team at UC take to prepare for this release? (Choose three.)
- A. Review the release notes for automatically-enabled features and technical debt.
- B. Upgrade any SOAP integrations to the newest WSDL as early as possible.
- C. Contact Salesforce to schedule a time to upgrade the Full sandbox.
- D. Refresh a Sandbox during the Release Preview Window to ensure they have the upcoming release.
- E. Run regression tests in an upgraded sandbox to detect any issues with the upgrade.
正解:A、D、E
質問 # 135
A technical lead is performing all code reviews for a team and is finding many errors and improvement points.
This is delaying the team's Deliveries.
Which two actions can effectively contribute to the quality and agility of the team?
Choose 2 answers
- A. Create development standards and train teams in those standards.
- B. Skip the code review and focus on functional tests and UAT.
- C. Choose the most senior developer to help the technical lead in the code review.
- D. Use static code analysis tool in the pipeline before manual code review.
正解:B、D
質問 # 136
Universal Containers has many development teams deploying into a single org. The business is very seasonal and approaching its busiest season. The business owner comes to you asking for your advice about its next major production release.
What best practice should an architect recommend?
- A. Bypass regression testing for minor changes.
- B. Developers should conduct user acceptance testing
- C. Make declarative changes in production only.
- D. Avoid releasing near peak business periods.
正解:B
質問 # 137
Universal Containers (\)C) is on the Unlimited Edition of Salesforce orgs. Currently, there are four Developer Pro sandboxes used by dev teams for various purposes, one partial copy sandboxes used for training, one full sandbox used for user acceptance testing. There is another full sandbox used for performance testing during the initial launch, and it is no longer being actively used.
A system administrator had reported yesterday that none of the sandboxes can be refreshed.
What is the most probable action an architect can help the system administrator with?
- A. Create a Salesforce support case, someone should know what is wrong.
- B. It appears the org is using more sandboxes than the license permits. The Partial Copy sandbox shouldn't be used.
- C. Contact the Salesforce Account Team to do a sandbox License Count.
- D. Delete the full sandbox used for performance testing.
正解:C
質問 # 138
Which two project situations favor an Agile methodology? Choose 2 answers
- A. A project with well-defined requirements and complex interactions between front- and back -end systems
- B. An environment with a heavy investment in DevOps capabilities for rapid testing and deployment
- C. A project to be executed by a third party, with a fixed and formal scope, budget, and timeline
- D. A digitization project to update an existing customer -facing process and enable quick adjustments
正解:B、D
質問 # 139
Universal Containers CUC) has multi-cloud architecture in a single org. The Sales Cloud dev team is working in a Dev Pro sandbox (DevProl) of delivering a release In three months. The business requirements from Service Cloud warrant a quicker release in four weeks, but need part of the Sales Cloud work that is completed in DevProl. The decision of using a separate Dev Pro sandbox (DevPro2) is still pending. The DevProl was upgraded to preview for next salesforce major release two weeks ago.
What should an Architect recommend?
- A. Push back on the requirements because adding another work stream will bring some risks with it.
- B. DevProl cannot be cloned because it is on a different version from Production. Just create a new DevPro2, and migrate metadata from DevProl.
- C. Clone the DevProl sandbox and name It DevPro2 for the second work stream to work on the Service Cloud requirements.
- D. Ask the second work stream team to work on the same DevProl sandbox.
正解:A
質問 # 140
Universal Containers (UC) has received feedback from the field on several new feature requests that are aligned with key business goals. UC is looking for a way to quickly get feedback and prioritize these requests.
Which two options should an Architect recommend? (Choose two.)
- A. Send the requests to IT for a formal review at the end of the year.
- B. Create design standards around the new features being requested.
- C. Create a backlog or priority list in a project management tool.
- D. Present the feature requests at a Center of Excellence meeting.
- E. Bring the feature request to the Test Manager to gain quality checks.
正解:C、D
質問 # 141
Universal Containers is in the process of testing their integration between salesforce and their on-premise ERP systems. The testing team has requested a sandbox with up to 10,000 records in each object to benchmark the integration performance. What is the fastest approach anArchitect should recommend?
- A. Spin off a partial copy sandbox using a sandbox template with all the objects required for testing the integration.
- B. Spin off a Development sandbox, migrate the metadata and load the data using data loader.
- C. Spin off a Developer pro sandbox, migrate the metadata and load the data using data loader.
- D. Spin offa full copy sandbox with all the objects that are required for testing the integration.
正解:A
質問 # 142
What are three advantages of using a Source Control system alongside a multi -sandbox development strategy?
Choose 3 answers
- A. Automatically deploy changes from sandbox to production (Missed)
- B. Create a branching strategy that tracks each feature or change separately (Missed)
- C. Perform code reviews before promoting to a pre -production sandbox
- D. Keep a history of changes made by each developer (Missed)
- E. Act as a backup in case of catastrophic data loss
正解:A、B、D
質問 # 143
What is the responsibility of an executive sponsor on a project?
- A. Communicate project status
- B. Determine project methodology
- C. Design executive dashboards
- D. Approve changes to project scope
正解:D
質問 # 144
In Architect has been working on a large project for the past 6 months. This project must be live by the end of the current month. Which two planning techniques should the Architect use to ensure all metadata changes deploy smoothly and on time? Choose 2 answers
- A. Create a new sandbox and perform a test deployment to that environment
- B. Ensure all code that is being deployed is checked into source control
- C. Upload a change set from sandbox to production as early as possible
- D. Validate the final deployment package against production prior to go-live
正解:B、D
質問 # 145
Universal Containers (UC) is using Salesforce for their sales organization. The sales users have created several dashboards using multiple running users. The admins have also added a few workflow rues that send email notifications to some sales users. What should an Architect consider while planning the deployment of such components? Choose 2 answers
- A. If the username in the source org doesn't exist in the target org, the deployment will stop until the usernames are resolved or removed.
- B. If the username in the source org doesn't exist in the target org, the deployment will continue and Salesforce will automatically create the username in the target org.
- C. User Fields are preserved during metadata deployments and Salesforce attempts to locate a matching user in the target org during deployment.
- D. User fields are ignored during metadata deployments and all such users need to be manually created in the target org before starting the deployment.
正解:A、C
質問 # 146
Universal Containers (UC) has been following the Waterfall methodology to deliver customer apps in Salesforce. As the business is growing at scale and with demand to incorporate features and functionality at faster pace, UC is finding the Waterfall approach is not an optimal process, and intends to transition towards an agile development methodology. Which are the two strengths of using an agile development methodology?
Choose 2
- A. The project requirements in later phases are expected and accommodated by the process, by design.
- B. There are many small releases of functional code, allowing stakeholders to see and touch the work in progress.
- C. Careful documentation is done at each step of the process so a target body of knowledge is available for inspection.
- D. All elements of the build are fully understood before work begins, reducing risk of unpleasant surprises.
正解:A、B
質問 # 147
......
Development-Lifecycle-and-Deployment-Designer完全版問題集には無料PDF問題で合格させる:https://jp.fast2test.com/Development-Lifecycle-and-Deployment-Designer-premium-file.html
無料Salesforce Developer Development-Lifecycle-and-Deployment-Designer公式認定ガイドPDFダウンロード:https://drive.google.com/open?id=1XWzBEULwMyF4Y_bJkraoUhNVhA3ytA94