
最新 [2025年11月29日] リアルSAP C-TS422-2504試験問題集解答
C-TS422-2504問題集を使って一日でSAP Certified Associate試験合格(最新の82解答)
質問 # 38
Advanced Planning uses data from SAP S/4HANA Cloud Private Edition. In which master data objects can you set the Advanced Planning flag?
Note: There are 2 correct answers to this question.
- A. Work center
- B. Plant
- C. Material
- D. Production version
正解:A、C
質問 # 39
What are some SAP recommended guiding principles to achieve clean core operations?
Note: There are 3 correct answers to this question.
- A. Establish release management.
- B. Define roles and responsibilities as part of a process transformation office.
- C. Establish an organizational structure, technical foundation, and transformation methodology for clean core.
- D. Integrate clean core practices in the end-to-end value process chain.
- E. Establish regular housekeeping tasks and procedures.
正解:A、B、C
質問 # 40
Which of the following are scheduling time elements for a production order?
Note: There are 3 correct answers to this question.
- A. Transit time
- B. Load time
- C. Setup time
- D. Queue time
- E. Float before production
正解:C、D、E
質問 # 41
You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received.
Which planning strategy supports the consumption of planned independent requirements by dependent requirements for the semi-finished material?
- A. Planning at assembly level (70)
- B. Planning with final assembly (40)
- C. Assembly processing with production orders (82)
- D. Production by lot size (30)
正解:A
質問 # 42
You are trying to create a production order and no valid production version can be selected. What could be the reasons?
Note: There are 2 correct answers to this question.
- A. The order lot size is NOT within the validity range of a production version.
- B. The basic start date is NOT within the validity period of the production version.
- C. No bills of material (BOMs) are assigned to the production versions.
- D. No production lines are assigned to the production versions.
正解:A、B
質問 # 43
Which objects can you change with a change number?
Note: There are 2 correct answers to this question.
- A. Routings
- B. Bill of material
- C. Production order
- D. Work center
正解:A、B
質問 # 44
How can you achieve a feasible production plan when there are capacity constraints?
Note: There are 3 correct answers to this question.
- A. Execute an infinite production planning run for the critical resources
- B. Increase the capacity supply in a time-phased interval
- C. Reduce the planning time interval
- D. Determine a time period with available capacity on the planning board
- E. Form optimum sequences to reduce setup times
正解:B、D、E
質問 # 45
When do you use variant bills of material (BOMs)?
- A. When a material has a configurable BOM
- B. When multiple materials have similar BOMS
- C. When a material has multiple BOMs
- D. When multiple materials have multiple BOMS
正解:B
質問 # 46
Which of the following is a scheduling method for a production order?
- A. Determination of basic dates
- B. Key date scheduling
- C. Determination of delivery date
- D. Lead time scheduling
正解:D
質問 # 47
What are some advantages of using Kanban for material supply? Note: There are 2 correct answers to this question.
- A. Replenishment is always triggered on a regular basis.
- B. Replenishment is only triggered when components are required.
- C. Material is only kept available in small quantities in production.
- D. Material stock is built up for a long period of time in production.
正解:B、C
質問 # 48
Which operations are considered in the capacity scheduling table?
Note: There are 2 correct answers to this question.
- A. Only bottleneck operations
- B. Operations assigned to a pacemaker work center
- C. Sub-operations
- D. All operations
正解:A、C
質問 # 49
What are some benefits of planning with planned independent requirements for finished materials?
Note: There are 2 correct answers to this question.
- A. The delivery time is reduced.
- B. You have the option to use forecast planning.
- C. Manufacturing time for final assembly is reduced.
- D. You have the option to use make-to-order production.
正解:B、D
質問 # 50
How would you define a pegging structure for an order in the context of Advanced Planning?
- A. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between receipt and issue elements
- B. An evaluation that is ordered according to the low-level codes of all related products and represents the coverage of issue elements with receipt elements and stock
- C. An evaluation to identify material or capacity shortages in the bill-of-material structure after the production planning run
- D. An evaluation to identify overstock situations based on the assignment of receipt and issue elements after the production planning run
正解:A
質問 # 51
Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material? Note: There are 2 correct answers to this question.
- A. Procurement type
- B. MRP group
- C. MRP type
- D. Material type
正解:A、C
質問 # 52
In the context of the capacity scheduling table, how do you define a pacemaker work center?
- A. By assigning it to the first operation of a routing
- B. By assigning it to the production version
- C. By assigning it to the bottleneck operation
- D. By assigning it to the capacity scheduling table
正解:B
質問 # 53
In which master data objects do you maintain data to determine the duration of an operation for production?
Note: There are 2 correct answers to this question.
- A. Work center
- B. Routing
- C. Material master
- D. Production version
正解:A、B
質問 # 54
When can you maintain the batch characteristic values in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. When you release the batch
- B. When you record inspection results
- C. When you post the goods receipt
- D. When you execute batch determination
正解:B、C
質問 # 55
Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA Cloud Private Edition. When can you use mode selection?
- A. When alternative resources are used within one operation
- B. When multiple planned orders are scheduled in parallel on one resource
- C. When several production versions are maintained for one product
- D. When several operations are maintained for one product
正解:A
質問 # 56
Which of the following elements does MRP take into account during net requirement calculation?
Note: There are 2 correct answers to this question.
- A. Production orders
- B. ATP quantities
- C. Planned orders (firmed)
- D. Planned orders (unfirmed)
正解:A、C
質問 # 57
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.
- A. Create an object selection variant for production-planning-related alerts
- B. Assign the overall profile to the authorization profile
- C. Assign the alert profile to the overall profile
- D. Create an object selection variant for alerts according to the priority of ATP categories
正解:A、C
質問 # 58
You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?
- A. Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator
- B. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator
- C. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator
- D. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator
正解:A
質問 # 59
What does Consumption-based Planning use to determine requirements in the future?
Note: There are 3 correct answers to this question.
- A. Statistical procedures
- B. Historical values
- C. Dependent requirements
- D. Planning file entries
- E. Forecasting
正解:A、B、E
質問 # 60
What is the purpose of the pull list in material staging?
- A. To control the flow of material from the supplier to the central storage location
- B. To control the flow of material from the central storage location to the production storage location
- C. To control the flow of material from the production storage location to the central storage location
- D. To control the flow of material from the supplier to the production storage location
正解:B
質問 # 61
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision?
Note: There are 3 correct answers to this question.
- A. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
- B. Net requirements calculation is carried out for every sales order individually.
- C. Planned orders are created in MRP with reference to sales orders.
- D. Storage location MRP areas are required to manage sales-order-specific stock.
- E. Production and procurement costs are managed on the sales order item level.
正解:B、C、E
質問 # 62
......
C-TS422-2504試験正確な問題集で学習ノートと理論:https://jp.fast2test.com/C-TS422-2504-premium-file.html
100% 高得点合格保証C-TS422-2504無制限82解答:https://drive.google.com/open?id=1uJFgANWE7I0VTzHULQR06b2Uh0UQtDZB