質問 # 20
You want to create a purchase document for several minor repairs that may occur over a period of time. They should NOT exceed a total amount in this period. Further details are NOT available.
Which type of purchasing document is best suited for this purpose?

  • A. Release purchase order
  • B. Invoicing plan
  • C. Service purchase order
  • D. Blanket purchase order

正解:D


質問 # 21
You use quota arrangements. You include a new supplier in an existing quota system. How can you ensure that the new supplier is considered as if they had been part of the quota arrangement from the beginning?

  • A. Manually update the quota-allocated quantity.
  • B. Manually update the quota.
  • C. Manually update the source list.
  • D. Manually update the quota base quantity.

正解:D


質問 # 22
You want to create a purchase order. An info record is available for the material-supplier combination. What logic does the system use to determine a price from the info record? Note: There are 2 correct answers to this question.

  • A. The system always proposes the valid plant-specific price, if available.
  • B. The system always proposes the price from the last purchase order, if available.
  • C. If there are NO valid conditions, the system can propose the price from the last purchase order, if available.
  • D. The system always proposes the price stored at purchasing organization level, if available.

正解:A、C


質問 # 23
Where does SAP S/4HANA store the low-level code used to determine the sequence in which materials are planned during the MRP run? Note: There are 2 correct answers to this question.

  • A. MRP planning file
  • B. Bill of material
  • C. Material master
  • D. Production version

正解:A、B


質問 # 24
What are some effects of parking a purchase order? Note: There are 2 correct answers to this question.

  • A. Any kind of errors in the document are permitted.
  • B. You can use Situation Handling to alert users about incomplete documents.
  • C. You can use a workflow to request completion of the document.
  • D. Any further posting for that purchase order is disabled.

正解:B、C


質問 # 25
You test the various options that SAP S/4HANA offers for stock transfers between two different plants within the same company code. Which of the following apply to stock transport orders? Note: There are 2 correct answers to this question.

  • A. You can post the goods issue from inspection stock in the supplying plant.
  • B. You can post the goods receipt to blocked stock in the receiving plant.
  • C. The material on the road is managed as stock in transit in the receiving plant.
  • D. Two accounting documents are created at the time of goods issue posting - one for each plant.

正解:B、C


質問 # 26
You have agreed on a value contract with a supplier for packaging. The exact materials and their purchase prices are NOT specified until the release orders. Which item category must you use when creating the contract?

  • A. M (Material unknown)
  • B. T (Text)
  • C. W (Material group)
  • D. B (Limit)

正解:A


質問 # 27
Which of the following steps can be part of a subcontracting process? Note: There are 3 correct answers to this question.

  • A. Settle components consumption by subcontractor.
  • B. Create an outbound delivery for components to be provided.
  • C. Create a sales order for components to be provided.
  • D. Post subsequent adjustment of component consumption.
  • E. Purchase components for direct delivery to subcontractor.

正解:A、D、E


質問 # 28
You post an invoice with invoice reduction. What can you observe in the system? Note: There are 2 correct answers to this question.

  • A. Two accounting documents are created: one for the invoice posting and one for the credit memo posting.
  • B. Only one accounting document is created containing both the invoice and the credit memo postings.
  • C. The invoice is blocked for payment until the supplier confirms the credit memo receipt.
  • D. A message is created that can be issued to the supplier as a notification of a credit memo posting.

正解:A、D


質問 # 29
In the standard system, a controllable system message is shown when a user creates a purchase order with a delivery date in the past. What must you configure to allow such purchase orders to only be created by authorized users?

  • A. Copy the system message to a new version, set it as an error message, and assign the version with user parameter MSV to non-authorized users.
  • B. Copy the system message to a new version, set it as an error message, and assign the version with user parameter MSV to the authorized users.
  • C. Copy the system message to a new version, set it as a warning message, and assign the version with user parameter MSV to the authorized users.
  • D. Copy the system message to a new version, set it as a warning message, and assign the version with user parameter MSV to non-authorized users.

正解:A


質問 # 30
Where do you enable the ability to personalize the home page?

  • A. In the user settings in the back-end system
  • B. In the business catalog
  • C. In the configuration of the SAP Fiori launchpad
  • D. In the business role assigned to the user

正解:C


質問 # 31
What is the effect of setting the Freeze Book Inventory indicator in a physical inventory document header?

  • A. The book inventory is determined and fixed in the physical inventory document at the time of the difference posting.
  • B. The system blocks all inventory management units of the physical inventory document for goods movements.
  • C. The system blocks all inventory management units of the physical inventory document for procurement.
  • D. The book inventory is determined and fixed in the physical inventory document at the beginning of the count.

正解:D


質問 # 32
Which purchasing organization assignments can you make in Customizing for the enterprise structure? Note: There are 3 correct answers to this question.

  • A. One purchasing organization to several plants across company codes
  • B. Several purchasing organizations to one company code
  • C. One purchasing organization to one company code
  • D. Several purchasing organizations to one purchasing group
  • E. One purchasing organization to several company codes

正解:A、B、C


質問 # 33
Which of the following can you control with the confirmation control key? Note: There are 2 correct answers to this question.

  • A. Whether a confirmation is a prerequisite for a goods receipt
  • B. The sequence of required confirmations
  • C. The document type for the goods receipt
  • D. Default reminder levels for outstanding confirmations

正解:A、B


質問 # 34
What are some of the consequences of setting the Delivery Completed indicator in a purchase order (PO) item? Note: There are 2 correct answers to this question.

  • A. The commitment for the PO item will increase.
  • B. The PO item is skipped when delivery reminders are generated.
  • C. The PO item CANNOT be deleted and archived.
  • D. You can still post goods receipts of remaining quantities.

正解:B、D


質問 # 35
What are the prerequisites for carrying out material requirements planning (MRP) for a plant? Note: There are 2 correct answers to this question.

  • A. Assign each storage location of the corresponding plant to an MRP area in Customizing.
  • B. Maintain MRP data in the material master record for the materials to be planned automatically.
  • C. Maintain plant parameters for the corresponding plant in Customizing.
  • D. Maintain planned independent requirements for the materials in the plant.

正解:B、C


質問 # 36
What must you consider when defining purchasing organizations? Note: There are 2 correct answers to this question.

  • A. Each purchasing organization has its own material master data.
  • B. Each purchasing organization has its own supplier master data.
  • C. Each purchasing organization has its own info records.
  • D. Each purchasing organization has its own purchasing groups.

正解:A、C


質問 # 37
How can you personalize the Procurement Overview app? Note: There are 3 correct answers to this question.

  • A. Use your user settings to define which cards to show and hide.
  • B. Use the drag-and-drop functionality to rearrange cards.
  • C. Filter the contents of all cards according to a specific supplier.
  • D. Define your own layout and save it as a tile on the SAP Fiori launchpad.
  • E. Exchange a card with another card accessed by the same CDS view.

正解:A、B、C


質問 # 38
What are the different types of SAP Fiori apps? Note: There are 3 correct answers to this question.

  • A. Interactive
  • B. Fact sheet
  • C. KPI report
  • D. Analytical
  • E. Transactional

正解:B、D、E


質問 # 39
Which options are available for the automatic posting of unplanned delivery costs when creating an invoice with purchase order reference? Note: There are 2 correct answers to this question.

  • A. The costs can be distributed among the invoice items.
  • B. The costs are posted automatically in a separate invoice.
  • C. The costs can be posted to a separate account.
  • D. The system determines a freight clearing account for posting the costs.

正解:A、C


質問 # 40
You want to use automatic conversion of purchase requisitions into purchase orders for some raw materials. What are the prerequisites? Note: There are 3 correct answers to this question.

  • A. The Automatic Purchase Order indicator is set in the purchasing data of the business partner master record.
  • B. The Automatic Purchase Order indicator is set in the plant-specific purchasing data of the material master record.
  • C. A contract with plant-specific conditions exists for the material and the vendor.
  • D. A source of supply containing valid conditions is assigned to the purchase requisition.
  • E. A plant-specific source list entry exists for the material.

正解:A、B、D


質問 # 41
You send newly created purchase orders to a supplier via EDI, whereas quantity or price changes are transmitted by e-mail. What prerequisites must be met if you are using the condition technique for message determination? Note: There are 3 correct answers to this question.

  • A. You configure different message types for the New and Change print operations.
  • B. The Price and Quantity fields are relevant for printout changes.
  • C. The dispatch time related to the change message needs to be set to 1 (send with periodically scheduled job).
  • D. The condition record contains the Price and Quantity fields.
  • E. The New Message Determination Process for Change Messages indicator is flagged in Customizing.

正解:B、C、E


質問 # 42
You want to manually post an initial entry of stock for a material in SAP S/4HANA.
You should be able to enter both a quantity and an amount. How do you proceed? Note: There are 2 correct answers to this question.

  • A. On the SAP Fiori launchpad, use the Post Goods Receipt without Reference app.
  • B. On the SAP Fiori launchpad, use the Manage Stock app.
  • C. On the SAP Fiori launchpad, use the Post Goods Movement app.
  • D. In the SAP GUI, use transaction MIGO.

正解:B、C


質問 # 43
......

最新のC_TS452_2021試験問題集でSAP試験問題にトレーニング:https://jp.fast2test.com/C_TS452_2021-premium-file.html

更新された検証済みのC_TS452_2021問題集と解答で100%合格させる:https://drive.google.com/open?id=1tY4o6prNcnWwvw9ljAowP0jgKeUyhGqy


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어