最新のHuawei H12-425_V2.0試験問題解答がズラリ [Q127-Q146]

Share

最新のHuawei H12-425_V2.0試験問題解答がズラリ

H12-425_V2.0試験練習テスト問題(更新された468問あります)

質問 # 127
The default management authority user name of the ECC800 is admin, and admin has all the authority to operate the WEB interface functions.

  • A. False
  • B. True

正解:B


質問 # 128
Considering that the UPS system is fully configured in the early stage of construction, but the actual system load rate is low, UPS5000-E is designed with an intelligent sleep function, which can increase the system load rate and keep the system running efficiently. When the UPS5000E sleeps intelligently, at least how many power modules are redundant?

  • A. 0
  • B. 1
  • C. 2

正解:A


質問 # 129
( ) marks the fully charged battery, and discharge it to the specified termination power according to certain discharge conditions.

  • A. Maximum capacity
  • B. Actual capacity
  • C. Rated capacity
  • D. Minimum Capacity

正解:B


質問 # 130
The NETCol5000-A36W air conditioner has a light load initial function.

  • A. True
  • B. False

正解:B


質問 # 131
On-demand deployment and avoiding over-investment are the only advantages of Mou Aihua's data center.

  • A. FALSE
  • B. TRUE

正解:A


質問 # 132
Which of the following fan control modes are supported by NetCo18000-C series room-level chilled water intelligent cooling products? (Multiple choice)

  • A. Mixed air control
  • B. Return air control
  • C. Supply air control
  • D. Differential pressure control
  • E. Pressure Control

正解:A、B、C、D、E


質問 # 133
When creating a camera in NETECO, in addition to obtaining the IP address of the camera, you also need to obtain ().

  • A. Camera Encoding
  • B. Camera installation location
  • C. Camera pixels
  • D. Camera Height

正解:A


質問 # 134
NETCOL5000-C needs to manually adjust the water valve to the minimum when filling and exhausting water.

  • A. FALSE
  • B. TRUE

正解:A


質問 # 135
Through the optional battery inspection instrument, the ( ) of the UPS battery cell can be detected. (Multiple choice)

  • A. Frequency
  • B. Voltage
  • C. Internal resistance
  • D. Battery case temperature

正解:B、C、D


質問 # 136
Regarding the overload capacity of UPS5000-E, which of the following statements is correct? (Multiple choice)

  • A. Inverter 110% overload for 120 minutes
  • B. Bypass 135% overload long-term operation
  • C. Inverter 110% overload for 60 minutes
  • D. Bypass 135% overload for 120 minutes

正解:B、C


質問 # 137
Which of the following are the basic functions of NETECO? (Multiple choice)

  • A. Access Management
  • B. Report Management
  • C. User Management
  • D. Video Management

正解:A、B、C、D


質問 # 138
During the use of the battery, in order to reduce the deterioration of the trend of voltage imbalance between batteries, it is necessary to increase the charging voltage of the battery pack, activate and charge the battery, and prolong the battery life. The maintenance method is called ().

  • A. Charging test
  • B. Float charge
  • C. Self-discharge
  • D. Equalizing Charge

正解:D


質問 # 139
The load is 120kW, and the UPS5000-S is used to meet the N+2 modular redundancy configuration, which can be configured with ( ) kVA models. (Fill in the blank)

  • A. 250kVA

正解:A


質問 # 140
The domestic power supply system is 380v/50Hz.

  • A. True
  • B. False

正解:B


質問 # 141
Which of the following are the accessories for UPS5000-A-400/500K? (Multiple choice)

  • A. Dry contact expansion board
  • B. Battery temperature sensor
  • C. Upper air outlet assembly
  • D. Port battery inspection instrument

正解:B、C、D


質問 # 142
When UPS5000-E is installed in parallel, it is not necessary to connect the parallel cables of each UPS in the parallel system into a loop.

  • A. True
  • B. False

正解:B


質問 # 143
( ) marks the fully charged battery, and discharge it to the specified termination power according to certain discharge conditions.

  • A. Maximum capacity
  • B. Actual capacity
  • C. Rated capacity
  • D. Minimum Capacity

正解:B


質問 # 144
The two ECMs of the UPS5000-E do not support active/standby switchover.

  • A. True
  • B. False

正解:B


質問 # 145
AHU is the smallest module of 220kW under standard conditions and cannot be split.

  • A. False
  • B. True

正解:B


質問 # 146
......


Huawei H12-425_V2.0-ENU試験は、データセンター施設の展開に強い基盤を持つことが求められる上級レベルの認定試験です。この認定試験は、IT業界で高く評価され、データセンター施設の展開における専門知識を持っていることを雇用主が認めるサインとして認識されています。この試験に合格することは、キャリアアップの素晴らしい方法であり、最新のトレンドや技術について常に最新情報を把握していることを示すことができます。


Huawei H12-425_V2.0(HCIP-Data Center Facility Deployment V2.0)試験は、Huawei技術を使用してデータセンター施設を展開および管理するために必要な知識とスキルをITプロフェッショナルに装備するよう設計された認定プログラムです。この認定プログラムは、データセンター施設の計画、設計、展開に責任を持つ個人を対象としています。

 

あなたを合格させるHuawei試験にはH12-425_V2.0試験問題集:https://jp.fast2test.com/H12-425_V2.0-premium-file.html

合格させるH12-425_V2.0試験情報と無料練習テスト:https://drive.google.com/open?id=1C1mK5nDtJOQMwX5hQ7NtOgETcXjG185x


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어