
更新された2024年01月プレミアムC-S4FCF-2021試験エンジンPDFで今すぐダウンロード!無料更新された82問あります
正真正銘のC-S4FCF-2021問題集には100%合格率練習テスト問題集
認定試験として、SAP C_S4FCF_2021は、財務データの統合、財務会計、管理会計、財務終了など、中央金融のさまざまな側面における候補者の習熟度を評価します。 SAP S/4HANA 2021であるSAP S/4HANAの最新バージョンをカバーしています。
質問 # 19
What is the purpose of a change request in SAP Master Data Governance? Note: There are 2 correct answers to this question.
- A. It transports changed customizing settings.
- B. It replicates master data to maintenance systems.
- C. It defines and controls the process flow according to the defined change request type.
- D. It acts as a container for new and changed master data.
正解:C、D
質問 # 20
You plan to use Central Finance system for Collections Management and Intercompany Reconciliation. Which prerequisites must be met? Note: There are 2 correct answers to this question.
- A. Payment terms must be replicated.
- B. Source systems and Central Finance must use business partners.
- C. Central payments must be activated.
- D. Replication of open items must be used.
正解:C、D
質問 # 21
Which of the following are architecture components of the Project Replication scenario for Central Finance?
Note: There are 3 correct answers to this question.
- A. SAP Landscape Transformation (SLT)
- B. ALE/IDoc outbound and inbound
- C. Application Interface Framework (AIF)
- D. SAP Process Integration (PI) Web service
- E. SAP Master Data Governance (MDG)
正解:B、C、E
質問 # 22
You want to maintain the master data of a cost object that has already been replicated to the Central Finance system. In which system is this performed?
- A. SAP Master Data Governance system
- B. Target system
- C. SAP Landscape Transformation (SLT)
- D. Source system
正解:A、B
質問 # 23
When do you activate the replication of WBS elements for Central Finance?
- A. After the configuration of inbound and outbound ALE
- B. After replication is activated in SAP Landscape Transformation (SLT)
- C. After the mapping and replication of cost centers
- D. After the initial load of FI documents
正解:A
質問 # 24
You are performing a CO initial load. For which objects can you use simul-ation functionality? Note: There are 2 correct answers to this question.
- A. CO documents
- B. WBS elements
- C. Cost objects
- D. Cost centers
正解:A、C
質問 # 25
Which of the following statements describes EC-PCA replication with Central Finance? Note: There are 2 correct answers to this question.
- A. EC-PCA documents are replicated to the leading ledger 0L.
- B. EC-PCA document replication does not cover postings done by transaction 1KEL.
- C. Central Finance Mapping logic is applicable to EC-PCA document replication.
- D. Error Resolution for EC-PCA is carried out using Application Interface Framework.
正解:A、C
質問 # 26
Which data must you extract from a non-SAP source system to integrate with Central Finance? Note: There are 3 correct answers to this question.
- A. Product tax items
- B. Document headers
- C. Debitor and creditor items
- D. Order items
- E. Master data items
正解:B、C、D
質問 # 27
What are the advantages of SLT deployment on a separate instance? Note: There are 3 correct answers to this question.
- A. No RFC connection is required to source and Central Finance systems.
- B. Other systems can be connected without impact on source and Central Finance systems.
- C. SLT has direct access to source and Central Finance systems.
- D. Other integration scenarios besides Central Finance are possible.
- E. There is no impact from update of source and Central Finance systems.
正解:B、C、E
質問 # 28
You want to maintain the mapping of the cost object internal order. In which system do you maintain the mapping?
- A. SAP Landscape Transformation (SLT)
- B. Source system
- C. Central Finance system
- D. SAP Master Data Governance system
正解:C
質問 # 29
You want to set up the Central Finance system. Note: There are 3 correct answers to this question.
- A. Configure decimal places for currencies.
- B. Assign the RFC destination in the source system.
- C. Assign the logical system for the central finance system.
- D. Configure ISO codes for currencies.
- E. Set up the RFC destination for the source system.
正解:B、C、E
質問 # 30
A customer is planning to deploy SAP Master Data Governance for a Central Finance landscape. What are the main considerations? Note: There are 3 correct answers to this question.
- A. SAP Master Data Governance as a master data hub has complete processes (governance and consolidation).
- B. The Central Finance system must query key and value mapping information from the SAP Master Data Governance system.
- C. Master data is distributed via SAP Master Data Governance to source and target systems.
- D. If SAP Master Data Governance is a standalone system, the source ERP system must query master data and Key Mapping from the Central Finance system.
- E. SAP Master Data Governance is not mandatory for the Central Finance landscape.
正解:A、C、E
質問 # 31
You prepare the FI/CO initial load. For which type of accounts must you create a substitution account?
- A. Asset reconciliation accounts
- B. Tax accounts
- C. Non-operating expense or income accounts
- D. Open item managed accounts
正解:A
質問 # 32
Which tool must you use to view FI/CO initial load errors?
- A. Central Finance application log
- B. SAP Application Interface Framework
- C. Migration cockpit
- D. SAP LT replication server cockpit
正解:A
質問 # 33
Your customer has completed the initial load of FI/CO postings in a test landscape. Before starting the next test cycle, what must you do to reset the initial load? Note: There are 3 correct answers to this question.
- A. Delete or cancel all AIF messages with status errors.
- B. Run the RFINS_CFIN_CLEAR_INIT_LOAD report in the target system.
- C. Stop the data extraction in the target system.
- D. Run the RCFIN_DEL_MIG report in the source system.
- E. Delete all entries in the CFIN_SOURCE_SET table in the source system.
正解:A、B、D
質問 # 34
......
検証済み!合格できるC-S4FCF-2021試験一発合格保証付き:https://jp.fast2test.com/C-S4FCF-2021-premium-file.html
SAP C-S4FCF-2021リアル試験問題保証付き 更新された問題集にはFast2test:https://drive.google.com/open?id=1Mk8JcF8CQaawoRJ5DYCXEmranSRNnRmH