質問 78
Which of the following are examples of conformance specification? Select TWO that apply:
- A. Product sample
- B. Outcome-focused specification
- C. Technical drawing
- D. Statement of work
- E. Output-focused specification
正解: A,C
解説:
There are two main types of specification: performance specification and conformance specification (sometimes called prescriptive or technical specifications).
A conformance specification establishes the characteristics a commodity must possess, including details of how the commodity will be manufactured; engineering plans, drawings, or blueprints may be included. The design specification states in prescriptive terms what the potential offeror must provide to the buyer.
Conformance specifications have following features:
- Focus on inputs
- Give specific method, processes and materials
- May identify specific manufacturers or components
- The 'how' as well as the 'what'
- Ties supplier to set details
Reference:
- Public Procurement Practice: SPECIFICATIONS
- CIPS study guide page 8-10
LO 1, AC 1.1
質問 79
When a supplier signs an insurance policy with an insurance company, which of the following is transferred to insurance company?
- A. Risk
- B. Legal responsibility
- C. Right
- D. Contractual obligation
正解: A
解説:
An insurance policy transfers a specific set of risks such as the fire and flood risk for a particular asset.
The legal liability does not transfer to the insurance company (known as insurer).
Reference:
LO 3, AC 3.2
質問 80
Social and environmental criteria are often incorporated into which of the following type of specification?
- A. Technical specification
- B. Output specification
- C. Conformance specification
- D. Design specification
正解: B
解説:
Developing and using generic specifications is as import in the sustainable procurement process as it is in the traditional procurement process. During this stage, human/labour rights and environmental performance criteria should be translated into specifications that meet specific requirements of the specified outcome, desired by the procurement action.
The specification stage is key to all types of contract. Building in environmental and social considerations at this early stage, provides a clear indication to suppliers that sustainability is important to the UN organization. Consider available alternatives which are less environmentally and socially damaging. Consider all the phases of a product's life cycle (e.g. production, transportation, maintenance, disposal, etc) when determining its cost and environmental impact. Assess the overall environmental and social integrity of suppliers by looking at their policies and practices.
Specifications which are output-based rather than input-based can increase supplier innovation, reduce waste and minimise harmful social and environmental impacts.
Reference:
- Sustainable Procurement
- CIPS study guide page 95-99
LO 2, AC 2.1
質問 81
Which of the following are likely to be implied terms in a contract? Select TWO that apply:
- A. Statute
- B. Contract clause
- C. Definition & interpretation
- D. Contract appendix
- E. Legal precedence
正解: A,E
解説:
An implied term is a term which the courts imply into a contract because it has not been expressly included by the parties. This may be because the parties did not consider it, did not think that any problem would arise in relation to it or simply omitted to include it.
The courts are very reluctant to imply terms into contracts and will only do so in the following circumstances:
- terms implied under statute
- terms implied under common law
- terms implied because of custom or usage
- terms implied due to previous dealings
- terms implied 'in fact' or to reflect the parties' intentions
Reference:
- Contracts: Express and Implied Terms
- CIPS study guide page 32
LO 1, AC 1.2
質問 82
To expand its operation, Steel Co. decides to build a new plant. Despite of excitement, the senior management is very concerned about the complexity and risks of such project. Hugo, the procurement manager, suggests that the company can adopt a model form of contract. What is the advantage of using model form of contract?
- A. It shifts the balance of power in the favour of the buyer rather than the contractor
- B. Model form of contract eliminates the need for legal advice totally
- C. The company does not need to draft the drawings as well as specification anymore
- D. The company could avoid the need to draft a complex contract from blank
正解: D
解説:
Advantages and Disadvantages of using model form contracts.
Model form contracts save a lot of time and money. They are written by industry experts and the buyers and suppliers both understand what is included in the contract.
They are mainly used in Construction and term maintenance contacts. Typical ones are JCT and NEC.
Without the use of model form contracts the buyer and supplier will take a long time to write the terms, negotiate and finalise the contract.
This is time and money wasted.
However, model form contracts require buyers and suppliers to have training so you understand them.
Finally, if you are a buyer in a powerful position you cannot exploit that with a model form contract as these are written for mutual benefit.
Reference:
- Procurement Study Buddy on Facebook
- CIPS study guide page 147
質問 83
Under English law's general legal principles of contract formation, which of the following are likely to be offers? Select TWO that apply.
- A. Quotation
- B. Advertisement
- C. Purchase order
- D. Catalogue
- E. Invitation to tender
正解: A
解説:
An offer is a full statement of what the offeror is willing to provide and the terms by which they are willing to provide it.
There are some statements that are not offers:
- Invitation to treat: this states that a person or organisation is willing to enter into discussions about the possibility of a deal, but does not confirm a willingness to be bound by any terms mentioned. Catalogues, goods on display and ITTs are invitation to treat.
Civil law countries may have different perspective on this matter. Article 2:201 (3) of The Principles of European Contract Law states: 'A proposal to supply goods or services at stated prices made by a professional supplier in a public advertisement or a catalogue, or by a display of goods, is presumed to be an offer to sell or supply at that price until the stock of goods, or the supplier's capacity to supply the service, is exhausted.' Learners are advised to look at their countries' legislation for more information on offer and acceptance.
- Declaration of intention: this is defined as an aim or a plan.
- A 'mere puff' (or boast): this is anything which is not intended to be taken literally or seriously, such as many advertisement.
- Provision of information: merely provides information, but provider does not confirm willingness to be bound.
Reference:
LO 1, AC 1.2
質問 84
Which of the following is the reason why liquidated damage clauses are embedded into a contract?
- A. To penalise the supplier for their wrongdoing
- B. Because compensation will be awarded immediately
- C. To avoid argument on correct measure of damage
- D. Because liquidated damages are the only remedy
正解: C
解説:
Liquidated damages are an amount of money, agreed upon by the parties at the time of the contract signing, that establishes the damages that can be recovered in the event a party breaches the contract. The amount is supposed to reflect the best estimate of actual damages when the parties sign the contract. These usually apply to a specific type of breach, and in construction, it is frequently the failure to complete work on time.
Liquidated damages clauses are usually written as some sort of formula, for example:
Total Contract Price - [(X amount of $ per day) x (number of days late)] Including a liquidated damages clause can provide many benefits, the most important of which is predictability. When setting a predetermined amount of damages, it allows both parties a chance to negotiate and settle on a number they both feel is fair and reasonable.
From the owner's perspective, this acts like a cheap form of insurance against your contractors. In the event of a breach, the owner can immediately calculate the damages without going through the trouble of proving actual damages. Proving actual damages can be a complicated, lengthy, and costly process.
From a contractor perspective, this allows them to analyze the level of risk involved, and schedule appropriately. It also allows them the opportunity to limit the damage claims of the owner.
Reference:
- Construction Contract Clauses: What Is a Liquidated Damages Clause?
- CIPS study guide page 158-159
LO 3, AC 3.2
質問 85
Which of the following is the procedure that makes no further competition under a framework agreement?
- A. Blanket order
- B. Closed system
- C. Direct call-off
- D. Standing offer
正解: C
解説:
Direct call off is the act of placing an order under a framework agreement without having further competition.
Standing offer is an available offer.
Blanket order is another name of framework agreement
Closed system is a requirement of framework agreement. It is a system or process that, once started, does not allow new entrants.
Reference:
LO 1, AC 1.3
質問 86
Which of the following should be applied when measuring frequency of on-time deliveries during a contract period?
- A. Qualitative assessment
- B. Numerical measure
- C. Subjective measure
- D. Binary measure
正解: B
解説:
Number of on-time deliveries can be quantified, then numerical measures can be applied.
Frequency of on-time deliveries is measured as on-time deliveries as a percentage of total no. of deliveries for period.
LO 2, AC 2.2
質問 87
Under hire purchase agreement, when will the ownership of asset legally belong to the purchaser?
- A. When the agreement is signed
- B. When the down payment is made
- C. When the final instalment is paid
- D. When the purchaser takes possession of the asset
正解: C
解説:
Hire purchase is an arrangement for buying expensive consumer goods, where the buyer makes an initial down payment and pays the balance plus interest in installments. Ownership is not transferred until the end of the agreement, hire purchase plans offer more protection to the vendor than other sales or leasing methods for unsecured items. That's because the items can be repossessed more easily should the buyer be unable to keep up with the repayments.
The answer is 'When the final instalment is paid'.
Reference:
- Hire Purchase Agreements
- CIPS study guide page 70
LO 1, AC 1.3
質問 88
Which of the following will be always automatically deemed as a consideration?
- A. Past consideration
- B. Promise to perform over and above an existing obligation
- C. Promise given to a third party
- D. Implied consideration
正解: B
解説:
Consideration only appears in common law countries. Below are some examples of what is and what is not consideration:
- Past consideration is something that has already been done or given. This cannot act as consideration
- Implied consideration: if the detail of a promise to pay is expressed after the provision of goods or services, but there is an implication that such promise would be forthcoming, this may (depending on the facts) be valid consideration.
- A promise given to a third party: this is not normally consideration, and is based on a concept known as privity of contract. Anyone who is not a party to the contract, even if they are beneficiary of it, cannot sue if the terms of the contract are breached.
- A promise to perform over and above an existing obligation: This is always consideration Reference:
- Consideration & Promissory Estoppel
- CIPS study guide page 36-40
LO 1, AC 1.2
質問 89
In common law, which of the following documents is legally binding without the need for consideration?
- A. One-off contract
- B. Blanket order
- C. Hire purchase agreement
- D. Deed
正解: D
解説:
In common law (the legal system in which most rules come from case law or precedents, such as UK, US, Australia, etc), the contract is legally binding if it has the following requirements:
- Offer
- Acceptance
- Certainty & Intention to Create Legal Relations
- Consideration & Promissory Estoppel
- Legal capacity
According to these rules, 'Blanket order', 'One-off purchase', and 'Hire purchase agreement' are contractually binding. One of the reason is that they have consideration.
However, there is a type of legal instruments that does not need consideration to be legally binding. They are called 'Deeds'. A deed (anciently "an evidence") is any legal instrument in writing which passes, affirms or confirms an interest, right, or property and that is signed, attested, delivered, and in some jurisdictions, sealed. It is commonly associated with transferring (conveyancing) title to property. At common law, to be valid and enforceable, a deed must meet several requirements:
- It must state on its face that it is a deed, using wording like "This Deed..." or "executed as a deed".
- It must indicate that the instrument itself conveys some privilege or thing to someone.
- The grantor must have the legal ability to grant the thing or privilege, and the grantee must have the legal capacity to receive it.
- It must be executed by the grantor in presence of the prescribed number of witnesses, known as instrumentary witnesses (this is known as being in solemn form).
- In some jurisdictions, a seal must be affixed to it. Originally, affixing seals made persons parties to the deed and signatures optional, but seals are now outdated in most jurisdictions, so the signatures of the grantor and witnesses are primary.
- It must be delivered to (delivery) and, in some jurisdictions, accepted by the grantee (acceptance).
Reference:
- Deed - Wikipedia
- Formation of the contract
- CIPS study guide page 40
LO 1, AC 1.2
質問 90
Which of the following regulates barriers to the provision of services between countries?
- A. ADA
- B. CISG
- C. GATS
- D. Incoterms
正解: C
解説:
- The General Agreement on Trade in Services (GATS) is a treaty of the World Trade Organization (WTO) that entered into force in January 1995 as a result of the Uruguay Round negotiations. The treaty was created to extend the multilateral trading system to service sector, in the same way the General Agreement on Tariffs and Trade (GATT) provides such a system for merchandise trade.
- CISG is the Vienna Convention on Contracts for the International Sale of Goods. This is a voluntary treaty under United Nations Commission on International Trade Law (UNCITRAL). The purpose of the Vienna Convention is to set out a framework for international transactions based on a uniform approach. It establishes substantive rules that regulate the duties and obligations of both parties, including the delivery of goods, contract formation, and remedies for breach of contract.
- The Incoterms or International Commercial Terms are a series of pre-defined commercial terms published by the International Chamber of Commerce (ICC) relating to international commercial law. They are widely used in international commercial transactions or procurement processes and their use is encouraged by trade councils, courts and international lawyers. A series of three-letter trade terms related to common contractual sales practices, the Incoterms rules are intended primarily to clearly communicate the tasks, costs, and risks associated with the global or international transportation and delivery of goods. Incoterms inform sales contracts defining respective obligations, costs, and risks involved in the delivery of goods from the seller to the buyer, but they do not themselves conclude a contract, determine the price payable, currency or credit terms, govern contract law or define where title to goods transfers.
- ADA is Anti-Dumping Agreement (Implementation of Article VI of the GATT).
LO 1, AC 1.3
質問 91
The pricing arrangement in which markup is added into cost base to calculate the final price is known as...?
- A. Fixed Price approach
- B. Cost plus pricing
- C. Price indices
- D. Market based approach
正解: B
解説:
The market approach is a method of determining the value of an asset based on the selling price of similar assets.
A fixed-price strategy means you set a price and keep it constant for an extended period of time.
Cost-plus pricing is also known as markup pricing. It's a pricing method where a fixed percentage is added on top of the cost to produce A price index (PI) is a measure of how prices change over a period of time, or in other words, it is a way to measure inflation. There are multiple methods on how to calculate inflation (or deflation).
Reference:
LO 3, AC 3.3
質問 92
A manufacturing company signed a contract with a raw material supplier. The contract includes a clause on liquidated damages in case of late delivery. Purchaser was obliged to pay after 30 days from delivery. Eventually raw material was delivered 1 week later than initial plan due to supplier's slow production process. There is no defect in the delivered batch. Which of the following can be claimed by the manufacturing company?
- A. Right of set-off
- B. Rights to refunds or repairs
- C. Right of extending payment
- D. Right of third party
正解: A
解説:
In certain circumstances, where two parties have monetary debts against each other, the right to set-off may arise. A right of set-off allows a ("Party 1") to take into account the amount owed to it by the second party ("Party 2") against any amount owed by Party 1 to Party 2, each party must be a debtor and a creditor.
Common law provides the key features that must be present for set-off to arise are;
1. mutuality of debts (each party must be the sole beneficial owner of the debt it is owed and the sole person liable for the debt it owes)
2. the claims each party has must be for non-payment of money
The common law provisions of set-off can be greatly enhanced by the inclusion of a contractual right to set-off (this is discussed further below) so that set-off is applicable in a greater range of situations. If you envisage set-off being a useful right it is not advisable to rely on the implied ability to use it (via common law or equitable set-off). Common law and equitable set-off are subject to various conditions and limitation however, a contractual right of set-off can be drafted to ensure parties are able to agree exactly how and when set-off should be applied.
In the above scenario, the supplier owes the manufacturer the payment for damages, while the manufacturer owes the supplier the payment for goods. This is mutuality of debts, which leads to right of set off.
Reference:
- Set-off on the right foot: a practical guide to set-off
- CIPS study guide page 158-159
LO 3, AC 3.2
質問 93
......
CIPS L4M3 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
| トピック 5 |
|
| トピック 6 |
|
| トピック 7 |
|
| トピック 8 |
|
無料でゲット!2023年最新のに更新されたCIPS L4M3試験問題と解答:https://jp.fast2test.com/L4M3-premium-file.html
合格させるL4M3試験には更新された161問題あります:https://drive.google.com/open?id=1fiqpHh-T8lMJaRGFA0tubI-5xt9krmat