
ベストな準備プランC_TS4CO_2020試験2024年最新のSAP Certified Application Associate無制限256問題
注目すべき時短になるC_TS4CO_2020オールインワン試験ガイド
Huawei H12-224-ENU 試験は、HCNP-R&S Fast Track 認定に重点を置く認定試験です。この試験では、ネットワークアーキテクチャや設計、ルーティングやスイッチング、セキュリティ、VPN技術、トラブルシューティングなどのトピックがカバーされます。この試験は、受験者のこれらの分野における知識とスキル、および実践的な状況でその知識を適用する能力を試験するよう設計されています。この認定は、Huaweiネットワーク技術に携わるプロフェッショナルが、この分野でキャリアアップしたい場合に理想的です。
質問 # 30
When is the standard hierarchy of the controlling area created?
- A. When the controlling area is assigned to the operating concern
- B. When the controlling area is defined
- C. When the first company code is assigned to the controlling area
- D. When the first cost center for a controlling area is created
正解:B
質問 # 31
In the product Cost by Order component, what does the system calculate depending on the order status? 1 answer
- A. WIP at planned costs or variances
- B. WIP at actual costs or variances
- C. Both WIP and variances or only variances
- D. WIP at target costs or variances
正解:B
質問 # 32
How do you define the relationship between an operating concern and a controlling area?
- A. Many-to-one (N:1)
- B. One-to-many (1:N)
- C. One-to-one (1:1)
- D. Many-to-many (N:M)
正解:B
質問 # 33
Which objects do you use when you assign costs and revenue to the value fields in costingbased CO- PA?
- A. Allocation structure
- B. Allocation template
- C. Overhead group
- D. Transfer structure
正解:A
質問 # 34
You are configuring internal order settlement. What do you define which cost element should be settled, using either the original settlement cost elements?
- A. Credit component (of the costing sheet)
- B. Settlement rule
- C. Allocation structure
- D. Settlement profile
正解:C
質問 # 35
Why would you use manual cost allocation in Controlling? 2 answers
- A. To correct secondary postings
- B. To run simple allocation of plan data
- C. To allocate costs using an allocation cycle
- D. To run simple allocations of actual data
正解:A、D
質問 # 36
What can you specify when you create an activity type? There are THREE correct answers for this question
- A. The valid sending cost center types
- B. The activity type category for allocation
- C. The secondary costs G/L account for internal activity allocation
- D. The primary costs G/L account for internal activity allocation
- E. The valid receiving cost center types
正解:A、B、C
質問 # 37
What can you analyse in detail when you transfer the cost component split from product cost planning to costing-based CO-PA?
- A. Cost of good sold
- B. Cost of goods manufactured
- C. Variance categories
- D. Sales revenues
正解:A
質問 # 38
You want to use a template for activity and process assignment to your material cost estimate. What do you need to do ?
- A. Assign a template directly to costing view 1 of the material master record
- B. Use the costing sheet of the costind view 1 in the template determination table
- C. Use the template allocation function in the material cost estimate and the costing run
- D. Assign a template to an operation in the routing of the material
正解:C
質問 # 39
You need to analyze different planning scenarios for cost centers. With which object do you differentiate the planning scenarios?
- A. Operating concern
- B. Company code
- C. Cost center group
- D. CO version
正解:D
質問 # 40
You are running an indirect activity allocation. What do you post to the sender and receiver?
- A. You post both quantity and cost to the sender, and cost only to the receiver.
- B. You post both quantity and cost to the receiver, and cost only to the sender.
- C. You post only cost to both the sender and receiver.
- D. You post quantity and cost to both the sender and receiver.
正解:D
質問 # 41
You perform a settlement with a primary cost account which is different from the cost account you used to post the original expense. Which object is a valid receiver for the settlement?
- A. Fixed Asset
- B. WBS element
- C. Cost center
- D. Internal order
正解:A
質問 # 42
What can you do with statistical internal orders ?
- A. Transfer posting to another internal order
- B. Simultaneously post to a cost center
- C. Apply overhead rates to the internal order
- D. Settle costs to a cost center
正解:B
質問 # 43
Which scenarios can be covered by one single costing run? Note: There are 2 correct answers to this question.
- A. Standard cost estimate of all the materials in all plants of a controlling area
- B. Current cost estimate of all the materials in all controlling area
- C. Inventory cost estimate of all the materials in one plant
- D. Product cost collector cost estimate in one plant
正解:C、D
質問 # 44
You want to create a new standard cost estimate based on the quantity structure of the existing standard cost estimate. Which object do you use ?
- A. Costing version
- B. Reference variance
- C. Transfer control
- D. Costing type
正解:D
質問 # 45
Which of the following statements are applicable to automatic account assignment in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. It can be overwritten in the application.
- B. It can be defined for postings on general ledger accounts of secondary costs type.
- C. It can be defined for postings on general ledger accounts of primary costs type.
- D. It takes precedence over validation and substitution.
正解:C、D
質問 # 46
You are using availability control in your SAP S/4HANA system. Which documents can cause the system to raise a warning message when the budget was exceeded? 2 answers
- A. Incoming invoice
- B. Outgoing payment
- C. Goods issue from order
- D. Purchase requisition
正解:A、D
質問 # 47
......
SAP C-TS4CO-2020認定試験には、180分以内に回答する必要がある80の複数選択質問が含まれます。候補者は、試験に合格するために最低63%を獲得する必要があります。試験で説明されているトピックには、SAP S/4HANA管理会計の概要、コスト要素会計、コストセンター会計、内部注文、製品コスト、収益性分析、および他のSAPモジュールとの統合が含まれます。 SAP C-TS4CO-2020の試験料は550ドルで、SAPによって管理されています。
合格保証付きC_TS4CO_2020問題集:https://jp.fast2test.com/C_TS4CO_2020-premium-file.html