あなたを合格させるSAP Certified Application Associate C-TS422-2021試験問題集で2024年05月21日には82問あります [Q36-Q60]

Share

あなたを合格させるSAP Certified Application Associate C-TS422-2021試験問題集で2024年05月21日には82問あります

C-TS422-2021無料試験学習ガイド!(更新された82問あります)

質問 # 36
What are the possible results of a production planning run in Advanced Planning (PP/DS)?

  • A. Scheduling agreement schedule line
  • B. Planned order
  • C. Production order
  • D. Purchase requistion
  • E. Stock transport order

正解:A、B、D


質問 # 37
Which of the following elements does MRP take into account during net requirement calculation?

  • A. Lot size
  • B. Maximum stock level
  • C. Purchase orders
  • D. Safety stock

正解:A、D


質問 # 38
Which of the following is valid sequence of the main activities in production order processing?

  • A. Creation, printing, release, goods issue, confirmation, goods receipt
  • B. Creation, release, settlement, goods issue, confirmation, goods receipt
  • C. Creation, availability check, release, material widrawal, confirmation
  • D. Creation, release, printing, goods issue, confirmation, goods receipt

正解:C、D


質問 # 39
Which time elements are relevant for lead time scheduling of a production order?

  • A. Setup time
  • B. Total replenishment lead time
  • C. Planned delivery time
  • D. Float after production

正解:C、D


質問 # 40
Which materials have a negative quantity in a bill of materials or in a recipe?

  • A. By-products
  • B. Bulk materials
  • C. Waste products
  • D. Continuous flow materials
  • E. Co-products

正解:A、D、E


質問 # 41
Which times elements does MRP consider in backward scheduling to determine he order dates for components from dependent requirements?

  • A. Operation duration
  • B. Planed delivery time
  • C. Total replenishment lead time
  • D. In-house production time

正解:B、D


質問 # 42
What does forecasting in demand planning cycle include?

  • A. One-off events
  • B. Past sales order quantites
  • C. Past quotation quantities
  • D. Past procurment quantities
  • E. Market intelligence

正解:A、B、E


質問 # 43
What are some uses for the low-level code assigned to each material?

  • A. It is used in MRP to determine the sequence in which materials are planned.
  • B. It is used by engineering to indentify subitems in an engineering bill of material (BOM).
  • C. It is used by product costing to determine how coast are rolled up.
  • D. it is used by ATP to determine the priority of alternative components.

正解:A、C


質問 # 44
What are the consequences if the Dispatched operation status is set for a production order operation?

  • A. You can reschedule the order using infinite scheduling in a planing table
  • B. You can reschedule the operation using lead time scheduling in a planning table
  • C. You can reschedule the operation using finite scheduling in planning table
  • D. You can reschedule the operation using midpoint scheduling in a planning table.

正解:B、C


質問 # 45
How can you limit the validity of a bill of material (BOM)?

  • A. By plant
  • B. By period
  • C. By material type
  • D. By industry

正解:A、B


質問 # 46
What is the difference between co-products and by-products?

  • A. Only by-products have a zero inventory valuation.
  • B. Only co-products are identified by a special item category in the bill of material (BOM).
  • C. Only co-products appear in the process or production order settlement rule.
  • D. Only co-products can be manufactured in isolation from the main product.

正解:C


質問 # 47
What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?

  • A. Alternative work centers are fully occupied.
  • B. The work center has several invidula capacities.
  • C. The Change Planning Direction indicator is set in strategy profile.
  • D. The finite Scheduling indicator is NOT set in the strategy profile.

正解:B、D


質問 # 48
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements
  • B. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run
  • C. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements
  • D. An evaluation to verify if there are material or capacity shortages in the network after the production planning run.

正解:C


質問 # 49
Why would you use phantom assemblies?

  • A. To reduce the number of changes required in bills of materials
  • B. To increase the number of planning levels
  • C. To reduce the number of material masters
  • D. To make the assignment of components easier
  • E. To simplify the structure of bills of materials

正解:A、D、E


質問 # 50
You want to schedule an operation finitely, without moving other operations. Which scheduing strategy do you select?

  • A. Find slot
  • B. Insert operation
  • C. Squeeze in
  • D. Schedule in working time only

正解:A


質問 # 51
Your proyect team decides to use a make-to-order planning strategy for strategic in discrete manufacturing.
What is the impact of this decision?

  • A. A sales-order-specific planning run is required.
  • B. Net requirement calcualtion is sales-order specific.
  • C. Production orders specific stock is created
  • D. Storage location MRP areas are required.

正解:A、B、C


質問 # 52
What detremines whatherthe planned independent requirements in MRP are consumed by other requrements?

  • A. Requirements type
  • B. Requirements profile
  • C. Consumption sequence procedure
  • D. Order type

正解:A


質問 # 53
In your plant, MRP is activated.
Which option do you have to exclude a materila from the MRP run?

  • A. Use a specific material status
  • B. Use a specific material group
  • C. Use a specific MRP type
  • D. Use specific MRP controller

正解:B、D


質問 # 54
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.

  • A. Scheduling control
  • B. Planning mode
  • C. Direction
  • D. Fixed pegging
  • E. Finiteness level

正解:A、B、C


質問 # 55
You want to use capacity availability checks for production orders. Which settings have to be made for this?

  • A. A checking rule must be assigned in the checking control
  • B. The PRT Availability Check must be set in the checking control.
  • C. The Relevant for Finite Scheduling indicator must be set
  • D. An overall profile must be assigned in the checking control.

正解:C、D


質問 # 56
When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?

  • A. The most restrictive status
  • B. The last restrictive status
  • C. The plant-specific status
  • D. The cross-plant status

正解:A


質問 # 57
Which time elements are part of a routing operation?

  • A. Float before production
  • B. Pick/pack time
  • C. Wait time
  • D. Queue time
  • E. Move time

正解:B、C、D


質問 # 58
Your production planners must execute planning only for specific resources. How can you achive this in advanced Planning(PP/DS)

  • A. Use a resource group.
  • B. Use a propagation range.
  • C. Use a planning group.
  • D. Use heuristic.

正解:D


質問 # 59
Your project used process orders for the production of liquid chemicals.
What can you define to ensure that the production flow happens only in physically connected tanks?

  • A. Operation network
  • B. Setup matrix
  • C. Work center hierarchy
  • D. Resource network

正解:C


質問 # 60
......

C-TS422-2021問題集はSAP Certified Application Associate認証済み試験問題と解答:https://jp.fast2test.com/C-TS422-2021-premium-file.html

実際に出ると確認されたC-TS422-2021試験問題集と解答でC-TS422-2021無料更新:https://drive.google.com/open?id=1QqZA4aOost6iUKKaJbFbBEaJaQRtDt35


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어